Inquiry #1: Referring to Bid Item #61(F), STRUCTURE CONCRETE, BRIDGE FOOTING, the concrete quantity appears to be overstated.
Please confirm.

Inquiry submitted 02/21/2017

Response #1:Submitted for consideration.
Response posted 02/24/2017


Response #2:Refer to Addendum No. 1, dated March 17, 2017. The quantity has been revised for the item Structural Concrete, Bridge Footing.
Response posted 03/20/2017




Inquiry #2: 1. Referring to Bid Item 65, BENT CAP WITH COLUMN MOCK-UP,
cutting and revealing connection, where does this occur?

2. Referring to Bid Item 63 (F), STRUCTURE CONCRETE, BRIDGE (POLYMER FIBER), we are assuming we can use a stay-in-place metal deck to support this bridge deck, between the pre-cast girders. Please confirm.

Inquiry submitted 02/21/2017

Response #1:1. There is no reference to the words "cutting and revealing connection" in the plans nor special provisions. Please clarify your question with specific references to the contract documents.

2. No, permanent steel deck forms are not specified as an option in the contract Special Provisions. Please refer to Section 51-1.03C(2)(c)(i), paragraph 2, of the Standard Specifications.
Response posted 02/24/2017




Inquiry #3: Referring to Special Provision page 14 and 15, "Add to the end of Section 5-1.33", use of Tier 4 engines, please clarify what Additive Item 1 is, and if Additive Item 1 is included in the contract.
Inquiry submitted 02/22/2017

Response #1:Submitted for consideration.
Response posted 02/24/2017


Response #2:Refer to Addendum No. 1, dated March 17, 2017.
Response posted 03/21/2017




Inquiry #4: The correct quantity for Bid Item 135 "CONCRETE BARRIER (TYPE 60F)" is 160 LF. Per Section 83-3.04 of the Standard Specifications "The payment quantity for Type 60F, 60GE, and 60SF concrete barriers is the length measured once along the centerline between the 2 walls of the barrier."
Please correct in an addendum.

Inquiry submitted 02/28/2017

Response #1:Submitted for consideration.
Response posted 02/28/2017


Response #2:Refer to Addendum No. 1, dated March 17, 2017.
Response posted 03/21/2017




Inquiry #5: Please verify Summary of Quantities (Q-2) for Guardrail, some locations for Salvage Guardrail and MGS (Steel Post) were missing and not shown on the Layout Plans. Thanks
Inquiry submitted 03/13/2017

Response #1:Submitted for consideration.
Response posted 03/13/2017


Response #2:Refer to Addendum No. 1, dated March 17, 2017.
Response posted 03/21/2017


Response #3:
Response posted 03/21/2017




Inquiry #6: In order to generate an accurate earthwork take off, please provide one of the following:

- Contour grading plan view showing the existing and proposed contour lines *.PDF

- Design topo plan view *.DGN file

Inquiry submitted 03/13/2017

Response #1:Submitted for consideration.
Response posted 03/14/2017




Inquiry #7: Section 19-6.03D of the project special provisions require that a surcharge be placed at new abutments 1 &3. The height of the surcharge above grading plane is 21’. Is this correct that the surcharge is on top of the new fill? This will require shoring of at least 30’ tall from the existing HWY 46 at abutment #1. Furthermore it will require shoring along HWY 99 in front of the abutment for both abutment 1 &3.
Please confirm that the 21’ surcharge is from the grading plane or existing grade.
How is the placement and removal of the surcharge paid? Also how is the additional shoring along HWY 46 and HWY 99 to be paid?

Inquiry submitted 03/16/2017

Response #1:Submitted for consideration.
Response posted 03/17/2017




Inquiry #8: Bid Item #63 STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER) quantity is under stated. The takeoff quantity is almost double the bid item. It appears the bid quantity only accounts for 7.25” of deck and not the thickened area over the girders or diaphragms. Please confirm the quantity and revise the bid quantity.
Inquiry submitted 03/20/2017

Response #1:Submitted for consideration.
Response posted 03/20/2017


Response #2:The Structural Concrete, Bridge (Polymer Fiber) quantity is only for the bridge deck. Contractor to bid per the current contract bid documents.
Response posted 03/21/2017




Inquiry #9: The Stage Construction and Traffic Handling sheets are missing a “Stage 3.” The current plans do not provide traffic handling for the construction of R-1 line (which will take several weeks to complete, the detour ramp must be closed for this work) and R-3 ramp the NB on ramp is accounted for, no TH plans for the NB off ramp. Please provide updated traffic handling plans and traffic chart for the long term closure of SB off ramp and NB on and off ramps to allow for construction.
Inquiry submitted 03/20/2017

Response #1:Submitted for consideration.
Response posted 03/20/2017






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, “JOB SITE AND DOCUMENT EXAMINATION” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.