Listing for all primes seeking assistance with project . 250 results found.
Contractor: Golden State Bridge, Inc. Contact: David Riccitiello
Address: 3701 Mallard Drive Benicia, CA 94510
Phone: 925-372-8000 Fax: 925-372-8001 Email: dave@gsbridge.com
Services needed: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN, PREPARE WATER POLLUTION CONTROL PROGRAM, CORE AND BOND DOWEL (CHEMICAL ADHESIVE), FURNISH AND ERECT STRUCTURAL STEEL (BRIDGE), RECONSTRUCT DAMPER BRACKETS, FURNISH AND INSTALL VISCOUS DAMPERS, HIGH STRENGTH THREADED RODS, CLEAN AND PAINT STRUCTURAL STEEL, SPOT BLAST CLEAN AND PAINT UNDERCOAT, STEAM CLEANING EXISTING DAMPERS FLUID LEAKAGE, BRIDGE REMOVAL (PORTION).
Requirements: Golden State Bridge, Inc. is soliciting DVBE sub / supplier quotes. Please call to discuss how Golden State Bridge, Inc. can assist you in your bonding, credit, and/or insurance needs. Also, let us know if you need assistance in obtaining necessary equipment, supplies, or materials for this project. If you are interested in submitting a subcontractor bid for this project, please fax us your quote at 925-372-8001. Should you have any questions regarding this bid, you may contact David Riccitiello at 925-372-8000 or dave@gsbridge.com. Please be advised, Contractors and subcontractors must register with The D.I.R. (Department of Industrial Relations) in order to bid on public works projects. Registration with The D.I.R. costs $300 and covers the fiscal year (July 1?June 30th). To verify the status of your DIR number, please visit http://www.dir.ca.gov/Public-Works/Contractors.html.
Date posted: 11/27/2017
Contractor: J. McLoughlin Engineering Co., Inc. Contact: Joe McLoughlin
Address: 10641 Fulton Ct. Rancho Cucamonga, CA 91730
Phone: 909-944-1037 Fax: 909-944-3112 Email: Berenice@jmeci.com
Services needed: J. McLoughlin Engineering Co., Inc. (JMECI) is requesting quotes from all qualified subcontractors and suppliers especially certified DBE?s (This project has a 10% DBE Requirement) firms for the following items of work, including but not limited to: Trucking, Street Sweeping, Equipment Rental, LEAD COMPLIANCE PLAN, PROGRESS SCHEDULE (CRITICAL PATH METHOD), DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, AUTOMATED WORK ZONE INFORMATION SYSTEM, TEMPORARY PAVEMENT MARKING (PAINT), TEMPORARY TRAFFIC STRIPE (PAINT), CHANNELIZER (SURFACE MOUNTED), TEMPORARY PAVEMENT MARKER, TEMPORARY PEDESTRIAN ACCESS ROUTE, PORTABLE CHANGEABLE MESSAGE SIGN (LS), TEMPORARY RAILING (TYPE K), TEMPORARY CRASH CUSHION MODULE, TEMPORARY TRAFFIC SCREEN, JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, TEMPORARY SOIL BINDER, TEMPORARY COVER, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, TREATED WOOD WASTE, REMOVE CONCRETE (MISCELLANEOUS) (CY), CLEARING AND GRUBBING (LS), ROADWAY EXCAVATION, FINISHING ROADWAY, CLASS 2 AGGREGATE SUBBASE, CLASS 2 AGGREGATE BASE (CY), LEAN CONCRETE BASE, LEAN CONCRETE, BASE RAPID SETTING, REPLACE BASE, BASE BOND BREAKER, REPLACE ASPHALT CONCRETE SURFACING, PRIME COAT, HOT MIX ASPHALT (TYPE A), MINOR HOT MIX ASPHALT, RUBBERIZED HOT MIX ASPHALT (GAP GRADED), PLACE HOT MIX ASPHALT DIKE (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE C), PLACE HOT MIX ASPHALT DIKE (TYPE E), PLACE HOT MIX ASPHALT DIKE (TYPE F), PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA), TACK COAT, REMOVE ASPHALT CONCRETE DIKE, REMOVE BASE AND SURFACING, JOINTED PLAIN CONCRETE PAVEMENT, JOINTED PLAIN CONCRETE PAVEMENT (RSC), DRILL AND BOND (DOWEL BAR), INDIVIDUAL SLAB REPLACEMENT (RSC), JOINT SEAL (PREFORMED COMPRESSION), REPLACE JOINT SEAL (PREFORMED COMPRESSION, 7/16" TO 13/16"), ISOLATION JOINT SEAL (PREFORMED COMPRESSION), REMOVE CONCRETE PAVEMENT AND BASE, GRIND EXISTING CONCRETE PAVEMENT, STRUCTURAL CONCRETE, APPROACH SLAB (TYPE R), MINOR CONCRETE (MINOR STRUCTURE), PAVING NOTCH EXTENSION, CLEAN EXPANSION JOINT, JOINT SEAL (MR 1"), BONDED JOINT SEAL (MR 2"), BONDED JOINT SEAL (MR 1 1/2"), BAR REINFORCING STEEL, DETECTABLE WARNING SURFACE, MINOR CONCRETE (GUTTER DEPRESSION), MINOR CONCRETE (CURB, SIDEWALK AND CURB RAMP), REMOVE CONCRETE SIDEWALK (SQYD), REMOVE CONCRETE (CURB AND GUTTER), PRE/POST CONSTRUCTION SURVEYS, SURVEY MONUMENT (TYPE D), REMOVE PAVEMENT MARKER, PAVEMENT MARKER (RETROREFLECTIVE), REMOVE ROADSIDE SIGN, RELOCATE ROADSIDE SIGN, FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED), ROADSIDE SIGN - ONE POST, MIDWEST GUARDRAIL SYSTEM (STEEL POST), VEGETATION CONTROL (MINOR CONCRETE), TRANSITION RAILING (TYPE WB-31), END CAP (TYPE A), END CAP (TYPE TC), END ANCHOR ASSEMBLY (TYPE SFT), ALTERNATIVE FLARED TERMINAL SYSTEM, SOFTSTOP TERMINAL SYSTEM, CONCRETE BARRIER (TYPE 60), CONCRETE BARRIER (TYPE 60GC MOD), CONCRETE BARRIER TRANSITION, SALVAGE GUARDRAIL, RECONSTRUCT GUARDRAIL, REMOVE CONCRETE BARRIER, THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY), PAINT TRAFFIC STRIPE (2-COAT), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), REMOVE THERMOPLASTIC TRAFFIC STRIPE, REMOVE THERMOPLASTIC PAVEMENT MARKING, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, MICROWAVE VEHICLE DETECTION SYSTEM, AND MODIFYING EXISTING ELECTRICAL SYSTEM. Quotations will be broken down into comparable packages as reasonably necessary. JMECI will work with interested subcontractors/vendors/suppliers to identify opportunities to break down items into economically feasible packages. PLEASE DO NOT E-MAIL QUOTES.
Requirements: Subcontractors must possess a current contractor?s license, and provide General Liability, Auto and Worker?s Compensation Insurance meeting the minimum requirements required by JMECI and will be required to sign a Subcontract Agreement and / or Purchase Order if necessary. 100% performance and payment bonds may be required for the full amount of subcontract price. JMECI will provide assistance in Bonding, Line of Credit, Insurance, Equipment, Supplies, and Materials if necessary to all qualified subcontractors. Plans and Specifications are available for viewing by appointment only at our office located at 10641 Fulton Ct., Rancho Cucamonga, CA 91730. J. McLoughlin Engineering Co., Inc. intends to work cooperatively with all qualified firms seeking work on this project. JMECI is an Equal Opportunity Employer. PLEASE DO NOT E-MAIL QUOTES.
Date posted: 11/29/2017
Contractor: California Engineering Contractors, Inc Contact: Jeff Hollfelder-Estimator
Address: 20 Happy Valley Road Pleasanton, CA 94566
Phone: 925-461-1500 Fax: 925-461-0510 Email: rorzech@cecmain.com
Services needed: Requesting Quotes from Qualified DVBE and Small Business Subcontractors and Suppliers for but not not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign, Prepare Water Pollution Control Program, Core and Bond Dowel(Partial) (Chemical Adhesive), Furnish Viscous Dampers, High Strength Threaded Rods, Steam Cleaning Existing Dampers Fluid Leakage, Materials & Supplies
Requirements: California Engineering Contractors, Inc. an Equal Opportunity Employer is willing to breakout any portion of work to encourage DVBE participation. Payment & Performance Bonds will be required from a single, treasury-listed surety subject to our approval. California Engineering Contractors, Inc. will pay bond premiums up to 1.5%. Subcontractors awarded on any project will be on California Engineering Contractors, Inc. standard form for subcontract without any modifications. Please Include Your License Number and DIR Number on All Quotes Submitted. Please call for assistance in bonding, insurance, lines of credit, technical info, equipment and supplies or if any other assistance is needed
Date posted: 11/30/2017
Contractor: American Bridge Co. Contact: Jene Van Zant
Address: 1390 Willow Pass Rd, Suite 330 Concord, CA 94520
Phone: 510-808-4564 Fax: 510-808-4601 Email: jvanzant@americanbridge.net
Services needed: Services needed: REQUEST FOR QUALIFIED DISADVANTAGED VETERAN BUSINESS ENTERPRISES FOR THE FOLLOWING PROJECT: Caltrans Contract No. 04-3G4424 - Replace existing dampers and modify related brackets. Bid Date: 02/08/2017. American Bridge Company is requesting quotes from all qualified subcontractors and suppliers and certified Disadvantaged Veteran Business Enterprises for all items of work, including but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control, Preparation of the Water Pollution Control Program, Core and Bond Dowels, Furnish and Erect Structural Steel, Reconstruct Damper Brackets, Furnish and Install Viscous Dampers, Clean and Paint Structural Steel, Spot Blast Clean and Paint Undercoat, Steam Cleaning of Existing Dampers' Fluid Leakage.
Requirements: American Bridge Company is an Equal Opportunity Employer. We are requesting quotes from all qualified subcontractors and suppliers and certified Disadvantaged Veteran Business Enterprises. Potential Subcontractors must possess a current contractor?s license, insurance coverage, and worker?s compensation for the entire length of the contract. Additionally, all subcontractors may be required to obtain 100% payment and performance bonds. Please call if you need assistance in obtaining insurance, bonding,equipment, materials and/or supplies. Plans and specifications can be viewed at our office located at 1390 Willow Pass Road, Suite 330, Concord, CA 94520 or call for any additional needed project information. American Bridge Company intends to work cooperatively with all qualified firms seeking work on this project. We are an equal opportunity employer and will work with any interested subcontractor to identify opportunities to break items into economically feasible packages. Women and Minority Disadvantaged Business Enterprises are also encouraged to apply.
Date posted: 12/01/2017
Contractor: USS Cal Builders, Inc. Contact: Estimating
Address: 8051 Main Street Stanton, CA 90680
Phone: 714-828-4882 Fax: 714-503-6805 Email: bidding@usscalbuilders.com
Services needed: USS Cal Builders is seeking qualified DBE subcontractors, suppliers and firms to meet or exceed the 10% goal. The Work includes, but is not limited to: LEAD COMPLIANCE PLAN, PROGRESS SCHEDULE (CRITICAL PATH METHOD), TIME-RELATED OVERHEAD (WDAY), DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, AUTOMATED WORK ZONE INFORMATION SYSTEM, TEMPORARY PAVEMENT MARKING (PAINT), TEMPORARY TRAFFIC STRIPE (PAINT), CHANNELIZER (SURFACE MOUNTED), TEMPORARY PAVEMENT MARKER, TEMPORARY PEDESTRIAN ACCESS ROUTE, PORTABLE CHANGEABLE MESSAGE SIGN (LS), TEMPORARY RAILING (TYPE K), TEMPORARY CRASH CUSHION MODULE, TEMPORARY TRAFFIC SCREEN, JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, TEMPORARY SOIL BINDER, TEMPORARY COVER, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, TREATED WOOD WASTE, REMOVE CONCRETE (MISCELLANEOUS) (CY), CLEARING AND GRUBBING (LS), ROADWAY EXCAVATION, FINISHING ROADWAY, CLASS 2 AGGREGATE SUBBASE, CLASS 2 AGGREGATE BASE (CY), LEAN CONCRETE BASE, LEAN CONCRETE BASE RAPID SETTING, REPLACE BASE, BASE BOND BREAKER, REPLACE ASPHALT CONCRETE SURFACING, PRIME COAT, HOT MIX ASPHALT (TYPE A), MINOR HOT MIX ASPHALT, RUBBERIZED HOT MIX ASPHALT (GAP GRADED), PLACE HOT MIX ASPHALT DIKE (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE C), PLACE HOT MIX ASPHALT DIKE (TYPE E), PLACE HOT MIX ASPHALT DIKE (TYPE F), PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA), TACK COAT, REMOVE ASPHALT CONCRETE DIKE, REMOVE BASE AND SURFACING, JOINTED PLAIN CONCRETE PAVEMENT, JOINTED PLAIN CONCRETE PAVEMENT (RSC), DRILL AND BOND (DOWEL BAR), INDIVIDUAL SLAB REPLACEMENT (RSC), JOINT SEAL (PREFORMED COMPRESSION), REPLACE JOINT SEAL (PREFORMED COMPRESSION, 7/16" TO 13/16"), ISOLATION JOINT SEAL (PREFORMED COMPRESSION), REMOVE CONCRETE PAVEMENT AND BASE, GRIND EXISTING CONCRETE PAVEMENT, STRUCTURAL CONCRETE, APPROACH SLAB (TYPE R), MINOR CONCRETE (MINOR STRUCTURE), PAVING NOTCH EXTENSION, CLEAN EXPANSION JOINT, JOINT SEAL (MR 1"), BONDED JOINT SEAL (MR 2"), BONDED JOINT SEAL (MR 1 1/2"), BAR REINFORCING STEEL, DETECTABLE WARNING SURFACE, MINOR CONCRETE (GUTTER DEPRESSION), MINOR CONCRETE (CURB, SIDEWALK AND CURB RAMP), REMOVE CONCRETE SIDEWALK (SQYD), REMOVE CONCRETE (CURB AND GUTTER), PRE/POST CONSTRUCTION SURVEYS, SURVEY MONUMENT (TYPE D), REMOVE PAVEMENT MARKER, PAVEMENT MARKER (RETROREFLECTIVE), REMOVE ROADSIDE SIGN, RELOCATE ROADSIDE SIGN, FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED), ROADSIDE SIGN - ONE POST, MIDWEST GUARDRAIL SYSTEM (STEEL POST), VEGETATION CONTROL (MINOR CONCRETE), TRANSITION RAILING (TYPE WB-31), END CAP (TYPE A), END CAP (TYPE TC), END ANCHOR ASSEMBLY (TYPE SFT), ALTERNATIVE FLARED TERMINAL SYSTEM, SOFTSTOP TERMINAL SYSTEM, CONCRETE BARRIER (TYPE 60), CONCRETE BARRIER (TYPE 60GC MOD), CONCRETE BARRIER TRANSITION, SALVAGE GUARDRAIL, RECONSTRUCT GUARDRAIL, REMOVE CONCRETE BARRIER, THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY), PAINT TRAFFIC STRIPE (2-COAT), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), REMOVE THERMOPLASTIC TRAFFIC STRIPE, REMOVE THERMOPLASTIC PAVEMENT MARKING, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, MICROWAVE VEHICLE DETECTION SYSTEM, MODIFYING EXISTING ELECTRICAL SYSTEM.
Requirements: If requested, USS Cal Builders can assist subs in obtaining bonds, lines of credit and insurance in the preparation of this project. USS Cal can also assist in obtaining equipment, supplies, materials or related assistance or services in the preparation of this project. USS Cal is relying on the price submitted in a subcontractor's proposal as an all-inclusive price for its trade scope found in the plans, specifications and addenda regardless of any qualifying language in the proposal. USS Cal's listing of a subcontractor is not an acceptance of any or all of that subcontractor's conditions, qualifications, exclusions or exceptions included in the subcontractor's bid proposal. The subcontractor agrees that its bid will remain valid for the same period of time that the prime contractor's bid must remain valid with the owner, as specified in the project's specifications. Each listed subcontractor must execute USS Cal's standard subcontract agreement if USS Cal is awarded the project; the standard subcontract is available for review on USS Cal's website (www.usscalbuilders.com ) and at USS Cal's office. At the discretion of USS Cal, any listed subcontractor that withdraws its bid after USS Cal submits its bid to the owner will be responsible for the difference in price for such scope of work charged by the replacement subcontractor. This is a prevailing wage project. If this project is subject to a Project Labor Agreement or Project Stabilization Agreement, you will be required to honor the terms of such agreement. USS Cal Builders, Inc. is signatory to the Carpenter's Union. Any subcontractor performing carpentry work must be signatory to the Carpenter's Union. An Equal Opportunity Employer.
Date posted: 12/04/2017
Contractor: Coffman Specialties, Inc. Contact: Estimating Department
Address: 9685 Via Excelencia, Ste 200 San Diego, CA 92126
Phone: 858-536-3100 Fax: 858-586-0164 Email: estimating@coffmanspecialties.com
Services needed: Coffman Specialties, Inc. (CSI) is requesting quotes from all qualified subcontractors and suppliers especially certified DBE firms for the following items of work, including but not limited to: TRUCKING, STREET SWEEPING, EQUIPMENT RENTAL, LEAD COMPLIANCE PLAN, PROGRESS SCHEDULE (CPM), DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, AUTOMATED WORK ZONE INFORMATION SYSTEM, TEMPORARY PAVEMENT MARKING, TEMPORARY TRAFFIC STRIPE, CHANNELIZER (SURFACE MOUNTED), TEMPORARY PAVEMENT MARKER, TEMPORARY PEDESTRIAN ACCESS ROUTE, PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY RAILING (TYPE K), TEMPORARY CRASH CUSHION MODULE, TEMPORARY TRAFFIC SCREEN, JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, TEMPORARY SOIL BINDER, TEMPORARY COVER, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY CONCRETE WASHOUT, TREATED WOOD WASTE, REMOVE CONCRETE, CLEARING AND GRUBBING, ROADWAY EXC, FINISHING ROADWAY, CLASS 2 AGG SUBBASE, CLASS 2 AGG BASE, LEAN CONCRETE BASE, LEAN CONCRETE, BASE (RSC), REPLACE BASE, BASE BOND BREAKER, REPLACE ASPHALT CONCRETE SURFACING, PRIME COAT, HMA (TYPE A), MINOR HOT MIX ASPHALT, RUBBERIZED HOT MIX ASPHALT (GAP GRADED), PLACE HOT MIX ASPHALT DIKE (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE C), PLACE HOT MIX ASPHALT DIKE (TYPE E), PLACE HOT MIX ASPHALT DIKE (TYPE F), PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA), TACK COAT, REMOVE ASPHALT CONCRETE DIKE, REMOVE BASE AND SURFACING, JOINTED PLAIN CONCRETE PAVEMENT, JOINTED PLAIN CONCRETE PAVEMENT (RSC), DRILL AND BOND (DOWEL BAR), INDIVIDUAL SLAB REPLACEMENT (RSC), JOINT SEAL (PREFORMED COMPRESSION), REPLACE JOINT SEAL (PREFORMED COMPRESSION, 7/16" TO 13/16"), ISOLATION JOINT SEAL (PREFORMED COMPRESSION), REMOVE CONCRETE PAVEMENT AND BASE, GRIND EXISTING CONCRETE PAVEMENT, STRUCTURAL CONCRETE, APPROACH SLAB (TYPE R), MINOR CONCRETE (MINOR STRUCTURE), PAVING NOTCH EXTENSION, CLEAN EXPANSION JOINT, JOINT SEAL (MR 1"), BONDED JOINT SEAL (MR 2"), BONDED JOINT SEAL (MR 1 1/2"), BAR REINFORCING STEEL, DETECTABLE WARNING SURFACE, MINOR CONCRETE (GUTTER DEPRESSION), MINOR CONCRETE (CURB, SIDEWALK AND CURB RAMP), REMOVE CONCRETE SIDEWALK (SQYD), REMOVE CONCRETE (CURB AND GUTTER), PRE/POST CONSTRUCTION SURVEYS, SURVEY MONUMENT (TYPE D), REMOVE PAVEMENT MARKER, PAVEMENT MARKER (RETROREFLECTIVE), REMOVE ROADSIDE SIGN, RELOCATE ROADSIDE SIGN, FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED), ROADSIDE SIGN - ONE POST, MIDWEST GUARDRAIL SYSTEM (STL POST), VEGETATION CONTROL (MINOR CONC), TRANSITION RAILING (TYPE WB-31), END CAP (TYPE A), END CAP (TYPE TC), END ANCHOR ASSEMBLY (TYPE SFT), ALTERNATIVE FLARED TERMINAL SYSTEM, SOFTSTOP TERMINAL SYSTEM, CONCRETE BARRIER (TYPE 60), CONCRETE BARRIER (TYPE 60GC MOD), CONCRETE BARRIER TRANSITION, SALVAGE GUARDRAIL, RECONSTRUCT GUARDRAIL, REMOVE CONCRETE BARRIER, THERMOPLASTIC PAVEMENT, PAINT TRAFFIC STRIPE (2-COAT), 6" THERMOPLASTIC TRAFFIC, 8" THERMOPLASTIC TRAFFIC STRIPE, REMOVE THERMOPLASTIC TRAFFIC STRIPE, REMOVE THERMOPLASTIC PAVEMENT MARKING, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, MICROWAVE VEHICLE DETECTION SYSTEM, AND MODIFYING EXISTING ELECTRICAL SYSTEM.
Requirements: Coffman Specialties, Inc. is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. Quotations must be valid for the same duration as specified by the Owner for contract award. Insurance and 100% Payment & Performance Bonds will be required, and will pay up to 1.5% for the cost of the bond. Waiver of Subrogation will be required. We will provide assistance/advice with obtaining Bonds/Insurance/Credit/Equipment. Subcontractors must provide contractor?s license number and Department of Industrial Relations (DIR) registration number with their quote. Plans and specs are available at no cost to interested DBE firms from the CALTRANS WEBSITE using the Project ID # 08-0K2914 and/or our San Diego Office. We are an EOE & seriously intend to negotiate with qualified firms.If you have any questions, Please contact Marty Keane: Phone 858-536-3100, Fax 858-586-0164 or email estimating@coffmanspecialties.com.
Date posted: 12/05/2017
Contractor: Certified Coatings Company Contact: Ashley Toms
Address: 2320 Cordelia Road Fairfield, CA 94534-1600
Phone: 707-639-4414 Fax: 707-432-0574 Email: toms@muehlhan.com
Services needed: CERTIFIED COATINGS COMPANY IS SEEKING CERTIFIED AND QUALIFIED DBE SUBS AND/OR SUPPLIERS TO PROVIDE THE FOLLOWING BUT NOT LIMITED TO: LEAD COMPLIANCE PLAN, PROGRESS SCHEDULE (CRITICAL PATH METHOD), TIME-RELATED OVERHEAD (WDAY), CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM,JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM, TEMPORARY CONCRETE WASHOUT,WORK AREA MONITORING (BRIDGE),TEMPORARY DECKING,STRUCTURAL CONCRETE, BRIDGE (RSC), DRILL AND BOND DOWEL,JOINT SEAL (MR 1 1/2"),JOINT SEAL (MR 2"), BAR REINFORCING STEEL (BRIDGE), FURNISH STRUCTURAL STEEL (BRIDGE),ERECT STRUCTURAL STEEL BRIDGE),FIBERGLASS REINFORCED GRATING, CLEAN AND PAINT STRUCTURAL STEEL, CLEAN AND PAINT STRUCTURAL STEEL (EXISTING BRIDGE), REPAIR SPALLED SURFACE AREA, BRIDGE REMOVAL PORTION),MISCELLANEOUS METAL (BRIDGE),TEMPORARY FENCE (TYPE CL-6),MOBILIZATION.
Requirements: PRIME CONTRACTOR IS WILLING, TO BREAKOUT ANY PORTION OF WORK TO ENCOURAGE DBE PARTICIPATION. PLANS AND SPECS ARE AVAILABLE UPON REQUEST. THEY MAY ALSO BE VIEWED AND DOWNLOADED FROM CALTRANS WEBSITE http://www.dot.ca.gov ****100% payment and performance bonds will be required for a single, treasury-listed surety subject to our approval. We will pay bond premiums up to 1.5% higher amounts maybe negotiable. Subcontractors awarded on any project will be on standard form for subcontract. Please call for assistance in bonding, insurance, lines of credit, technical info, equipment and supplies or if any other assistance is needed. Certified Coatings Company is an Equal Opportunity Employer.
Date posted: 12/11/2017
Contractor: CL Coatings, Inc dba CL Industrial Coatings, Inc Contact: Rick Suttles
Address: 11650 Western Ave Stanton, CA 90680
Phone: 562-285-6520 Fax: 714-892-7691 Email: rsuttles@clcoatings.us
Services needed: CL Industrial Coatings, Inc. Is requesting/seeking certified and qualified DBE subcontractors or suppliers to provide the following items but not limited to- Lead Compliance Plan, Progress Schedule (Critical Path Method), Construction Area Signs, Traffic Control System, Job Site Management, Prepare Water Pollution Control Program, Temporary Concrete Washout, Work Area Monitoring (Bridge), Temporary Decking, Structural Concrete-Bridge (RSC), Drill and Bond Dowel, Joint Seal (MR 1 ??), Joint Seal (MR 2?)Bar Reinforcing Steel (Bridge), Furnish Structural Steel (Bridge), Erect Structural Steel (Bridge), Fiberglass Reinforced Grating, Clean and Paint Structural Steel, Clean and Paint Structural Steel (Existing Bridge), Repair Spalled Surface Area, Bridge Removal (Portion), Miscellaneous Metal (Bridge), Temporary Fence (Type CL-6), and Mobilization.
Requirements: CL Industrial Coatings, Inc. is a union signatory contractor. CL Industrial Coatings, Inc. is willing to breakout any portion of work to encourage DBE participation. Plan and Specificationss are available upon request. They may also be view and downloaded from the Caltrans website http://www.dot.ca.gov. 100% payment and performance Bonds will be required for a single, treasury-listed surety subject to our approval. We will pay bond premiums up to 1.5%. Higher amounts may be negotiable. Subcontractors will be required to enter on our standard subcontract form. Please call for assistance in bonding, insurance, lines of credit, technical info, equipment, and supplies or if any other assistance is needed. CL Industrial Coatings, Inc. is an equal opportunity employer.
Date posted: 12/12/2017
Contractor: Liberty Maintenance Inc. DBA Ohio Liberty Maintenance Inc. Contact: Emanouel Frangos
Address: 777 N. Meridian Road Youngstown, OH 44509
Phone: 330-755-7711 Fax: 330-755-1847 Email: ejfrangos@libertymaintenanceinc.com
Services needed: Contractor is seeking DBE and Non DBE subcontractors and suppliers to perform following work included in said contract: LEAD COMPLIANCE PLAN, PROGRESS SCHEDULE, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, JOB SITE MGT, PREPARE WATER POLLUTION CONTROL PROGRAM, TEMPORARY CONCRETE WASHOUT, WORK AREA MONITORING, TEMPORARY DECKING, STRUCTURAL CONCRETE BRIDGE (RSC), DRILL AND BOND DOWEL, JOING SEAL MR 1.5" & 2", BAR REINFORCING STEEL (BRIDGE), ERECT STRUCTURAL STEEL (BRIDGE), FIBERGLASS REINFORCED GRATING, CLEAN & PAINT STRUCTURAL STEEL, CLEAN & PAINT STRUCTURAL STEEL (EXISTING BRIDGE), REPAIR SPALLED SURFACE AREA, BRIDGE REMOVAL (PORTION), MISC METAL (BRIDGE), TEMPORARY FENCE (TYPE CL-6), HAZARDOUS WASTE DISPOSAL, FUEL SUPPLY & DELIVERY, EQUIPMENT RENTAL. Work items can be split to encourage participation.
Requirements: Project spec and plans can be accessed from Caltrans website for advertised projects, contract 07-296604 http://www.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php. Please contact project reps listed below with any questions or need for assistance related to contract requirements including plans and specification related to this solicitation. Assistance is also available for bonding, lines of credit, and insurance; please reach out to the project reps listed below to discuss. Assistance can be provided for obtaining necessary equipment, supplies, materials or related assistance or services; please reach out to the reps listed below. BOND AND INSURANCE ARE REQUIRED OF ALL SUBS. PLEASE NOTE CALTRANS REQUIRES PAINTING SUBCONTRACTORS TO SUBMIT PROOF OF SSPC QP1 & QP2 CERTIFICATIONS. LIBERTY IS A UNION SIGNATORY AND IS AN EEO EMPLOYER. Please email interest in the project as soon as possible. Quotes are to be emailed no later than 24 hours prior to bid opening. IN ORDER TO ASSURE QUOTES ARE TIMELY RECEIVED, PLEASE **EMAIL** QUOTES TO: EJFRANGOS@LIBERTYMAINTENANCEINC.COM AND CK@LIBERTYMAINTENANCEINC.COM. **Please note **fax quotes** may not reach us in time.** Please direct any questions via same email or call Christine Kalikatzaros at (917) 577-9617 or Emanouel Frangos at (917) 709-0742.
Date posted: 12/12/2017
Contractor: Flatiron West, Inc. Contact: Veronica Garcia
Address: 1770 La Costa Meadows Drive San Marcos, CA 92078
Phone: 760-916-9100 Fax: 760-471-4860 Email: SDBids@flatironcorp.com
Services needed: Request for Certified DBE Subcontractors and Suppliers. Quotes requested for, but not limited to: AC Dike, Aggregate Supply, Asphalt Paving, Clear & Grub, Concrete Barrier, Concrete Supply, Construction Area Signs, Electrical, Erosion Control, Grind Concrete Pavement, Guardrail, Joint Seal, Minor Concrete, PCC Materials, QC/QA, Reinforcing Steel, Roadside Signs, Saw & Seal, Striping, Survey, Volumetric Concrete Supply.
Requirements: Quotations must be valid for same duration as specified by Owner for contract award. Assistance in obtaining bonding, lines of credit, insurance, equipment, supplies and materials is available upon request. Flatiron West, Inc. analyzes and considers each DBE quote, including those that are broken down into economically feasible units to facilitate bidding. Subcontractors are required to possess and maintain a current contractor?s license and must also be registered with the Department of Industrial Relations (DIR) as required by Public Contract Code Section 1725.5. Subcontractors will be required to execute Flatiron's Standard Subcontract Terms and Conditions and insurance requirements. A copy of our Standard Subcontract Terms and Conditions is available in electronic format upon request. Bond Requirements: Notwithstanding any contrary language in a bid to Flatiron West, Inc. ("Flatiron") or any prior course of dealing between Flatiron and a bidder, and unless waived in writing by Flatiron, Flatiron reserves the right, pursuant to Public Contract Code section 4108 and otherwise, to require each bidder to provide payment and performance bonds assuring bidder's obligations to Flatiron in the amount of 100 percent of the bid to Flatiron. Flatiron will reimburse the bond premium at actual cost not to exceed 3%. The surety on the bonds must be a California admitted surety. Non-DBE Subs/Suppliers: Indicate 2nd tier DBE participation offered on your quotation as it will be evaluated with your price. We Are An Equal Opportunity Employer.
Date posted: 12/13/2017
Contractor: A. Teichert & Son, Inc. dba Teichert Construction Contact: Sean Heraty
Address: 400 Sunrise Avenue, Suite 300 Roseville, CA 95661
Phone: 916-757-6400 Fax: 916-757-6499 Email: SHeraty@teichert.com
Services needed: Request for qualified bids from Subcontractors, Suppliers & Truckers for the following project: Project: Construction on State Highway in El Dorado County at Pollock Pines from Sawmill Road Undercrossing to South Fork American River Bridge ? Contract No. 03-0G7504 Bid Date: 2/1/18 @ 2:00PM Docs & Plans Available from Caltrans Estimate: $7,600,000 Completion: 60 Working Days and not more than 90 working days Requesting: DVBE Project Description: Teichert Construction is requesting quotes from all qualified subcontractors and suppliers including certified DVBE firms for the following items of work, including but not limited to: all materials, labor and equipment for Construction Area Signs, Traffic Control System, Plane Asphalt Concrete, Temporary Erosion Control, Asphalt Concrete, Paving Asphalt (Asphalt Concrete), Place Asphalt Concrete Dike Misc., Object Marker, Metal Beam Guard Railing, Thermoplastic Traffic Stripping & Marking, Pavement Marking, Detector, Asphalt Supplier (Bulk Item), Lead Compliance, SWPP Planning, Bottom; Transfer; Super 10; End Dump Trucks, Water Truck, Asphalt Oil Tankers and Street Sweeping Truck. Teichert Construction intends to work cooperatively with all qualified firms seeking work on this project, including but not limited to breaking out contract work items into economically feasible units to increase overall DVBE participation. Plans and specifications are available from the municipality listed above and the Teichert?s Roseville Estimating office. For assistance obtaining or regarding the plans and specifications, please contact the listed Estimator. 100% Payment and Performance Bonds for subcontractors are required. Teichert will pay bond premium up to 2%. Insurance Waiver of subrogation also required. However, certified DVBE?s are encouraged to contact Teichert and request assistance if they are unable to meet Teichert's standard bonding or insurance requirements. DVBE's also are encouraged to contact Teichert for assistance in obtaining lines of credit, equipment, supplies, materials or related assistance or services. Subcontractor, Supplier and Trucker quotes must be valid, at minimum, for the award period stated in the contract documents. Please note that this is a prevailing wage project and Teichert Construction is Union signatory. Subcontractors will be subject to the terms and conditions of Teichert's subcontract and safety documents available at www.teichert.com/for-subcontractors.cfm. Submission of a bid to Teichert will confirm that you have reviewed and accepted Teichert's subcontract form. Conditions or exceptions in Subcontractor?s quote are expressly rejected unless accepted in writing prior to bid. Subcontractor scopes and supplier quotes are required 24 hours prior to bid. Additional information and or assistance to DVBE's available from: *** All Quotes must have the Department of Industrial Relations # to be ACCEPTED ***
Requirements:
Date posted: 01/11/2018
Contractor: F.D. Thomas, Inc Contact: Mike Kostenko
Address: 217 Bateman Dr Central Point, OR, 97502
Phone: 541-664-3010 Fax: 541-664-1105 Email: bids@fdthomas.com
Services needed: LEAD COMPLIANCE PLAN,PROGRESS SCHEDULE (CRITICAL PATH METHOD),CONSTRUCTION AREA SIGNS,TRAFFIC CONTROL SYSTEM, JOB SITE MANAGEMENT,PREPARE WATER POLLUTION CONTROL PROGRAM, TEMPORARY CONCRETE WASHOUT, WORK AREA MONITORING (BRIDGE),TEMPORARY DECKING,STRUCTURAL CONCRETE, BRIDGE (RSC),DRILL AND BOND DOWEL,JOINT SEAL (MR 1 1/2"),JOINT SEAL (MR 2"),BAR REINFORCING STEEL (BRIDGE),FURNISH STRUCTURAL STEEL (BRIDGE),ERECT STRUCTURAL STEEL (BRIDGE),FIBERGLASS REINFORCED GRATING, REPAIR SPALLED SURFACE AREA,BRIDGE REMOVAL (PORTION), MISCELLANEOUS METAL (BRIDGE),TEMPORARY FENCE (TYPE CL-6), MOBILIZATION
Requirements: F. D. Thomas Inc. is a union signatory contractor. Subcontractors must possess a current contractor?s license, insurance coverage and worker?s compensation for the entire length of the contract. All subcontractors will be required to sign our standard Subcontract Agreement, 100% payment and performance bonds may be required. Please call if you need assistance in obtaining insurance, bonding, equipment, materials and/or supplies. F. D.Thomas Inc. intends to work cooperatively with all qualified firms seeking work on this project. We are an equal opportunity employer and will work with any interested subcontractor to identify opportunities to break items into economically feasible packages.
Date posted: 12/18/2017
Contractor: Peterson Chase General Engineering Construction Inc. Contact: Kali Goglanian
Address: 16351 Construction Circle West Irvine, CA 92606
Phone: 949-252-0441 Fax: 949-252-0266 Email: bids@petersonchase.com
Services needed: Peterson-Chase General Engineering Construction, Inc. is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work: Lead Compliance Plan, Develop Water Supply, Construction Area Signs, Traffic Control System, Automated Work Zone Information System, Temporary Pavement Marking (Paint), Temporary Traffic Stripe (Paint), Channelizer (Surface Mounted), Temporary Pavement Marker, Temporary Pedestrian Access Route, Portable Changeable Message Sign (Ls), Temporary Railing (Type K), Temporary Crash Cushion Module, Temporary Traffic Screen, Prepare Storm Water Pollution Prevention Plan, Rain Event Action Plan, Storm Water Sampling And Analysis Day, Storm Water Annual Report, Temporary Soil Binder, Temporary Cover, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Street Sweeping, Temporary Concrete Washout, Treated Wood Waste, Remove Concrete (Miscellaneous) (Cy), Clearing And Grubbing (Ls), Roadway Excavation, Finishing Roadway, Class 2 Aggregate Subbase, Class 2 Aggregate Base (Cy), Lean Concrete Base, Lean Concrete Base Rapid Setting, Replace Base, Base Bond Breaker, Replace Asphalt Concrete Surfacing, Prime Coat, Hot Mix Asphalt (Type A), Minor Hot Mix Asphalt, Rubberized Hot Mix Asphalt (Gap Graded), Place Hot Mix Asphalt Dike (Type A), Place Hot Mix Asphalt Dike (Type C), Place Hot Mix Asphalt Dike (Type E), Place Hot Mix Asphalt Dike (Type F), Place Hot Mix Asphalt (Miscellaneous Area), Tack Coat, Remove Asphalt Concrete Dike, Remove Base And Surfacing, Jointed Plain Concrete Pavement, Jointed Plain Concrete Pavement (Rsc), Drill And Bond (Dowel Bar), Individual Slab Replacement (Rsc), Joint Seal (Preformed Compression), Replace Joint Seal (Preformed Compression, 7/16" To 13/16"), Isolation Joint Seal (Preformed Compression), Remove Concrete Pavement And Base, Grind Existing Concrete Pavement, Structural Concrete, Approach Slab (Type R), Minor Concrete (Minor Structure), Paving Notch Extension, Clean Expansion Joint, Joint Seal (Mr 1"), Bonded Joint Seal (Mr 2"), Bonded Joint Seal (Mr 1 1/2"), Bar Reinforcing Steel, Detectable Warning Surface, Minor Concrete (Gutter Depression), Minor Concrete (Curb, Sidewalk And Curb Ramp), Remove Concrete Sidewalk (Sqyd), Remove Concrete (Curb And Gutter), Pre/Post Construction Surveys, Survey Monument (Type D), Remove Pavement Marker, Pavement Marker (Retroreflective), Remove Roadside Sign, Relocate Roadside Sign, Furnish Single Sheet Aluminum Sign (0.080"-Unframed), Roadside Sign - One Post, Midwest Guardrail System (Steel Post), Vegetation Control (Minor Concrete), Transition Railing (Type Wb-31), End Cap (Type A), End Cap (Type Tc), End Anchor Assembly (Type Sft), Alternative Flared Terminal System, Softstop Terminal System, Concrete Barrier (Type 60), Concrete Barrier (Type 60gc Mod), Concrete Barrier Transition, Salvage Guardrail, Reconstruct Guardrail, Remove Concrete Barrier, Thermoplastic Pavement Marking (Enhanced Wet Night Visibility), Paint Traffic Stripe (2-Coat), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), 8" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), Remove Thermoplastic Traffic Stripe, Remove Thermoplastic Pavement Marking, Maintaining Existing Traffic Management System Elements During Construction, Microwave Vehicle Detection System, Modifying Existing Electrical System. Please email your quotes to Bids@petersonchase.com
Requirements: Peterson-Chase General Engineering Construction Inc. can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Dick Vogels at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Caltrans? requirements and will be required to sign the standard Peterson-Chase GEC., Inc. Subcontract Agreement. Plans and specifications are available to be viewed in our office located at 16351 Construction Circle West, Irvine, CA 92606, between 8:00 AM and 3:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Peterson-Chase GEC., Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. Peterson Chase General Engineering Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.
Date posted: 12/18/2017
Contractor: Peterson Chase General Engineering Construction Inc. Contact: Kali Goglanian
Address: 16351 Construction Circle West Irvine, CA 92606
Phone: 949-252-0441 Fax: 949-252-0266 Email: bids@petersonchase.com
Services needed: Peterson-Chase General Engineering Construction, Inc. is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Prepare Water Pollution Control Program, Temporary Concrete Washout, Work Area Monitoring (Bridge), Temporary Decking, Structural Concrete, Bridge (Rsc), Drill And Bond Dowel, Joint Seal (Mr 1 1/2"), Joint Seal (Mr 2"), Bar Reinforcing Steel (Bridge), Furnish Structural Steel (Bridge), Erect Structural Steel (Bridge), Fiberglass Reinforced Grating, Clean And Paint Structural Steel, Clean And Paint Structural Steel (Existing Bridge), Repair Spalled Surface Area, Bridge Removal (Portion), Miscellaneous Metal (Bridge), Temporary Fence (Type Cl-6) Please email your quotes to Bids@petersonchase.com
Requirements: Peterson-Chase General Engineering Construction Inc. can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Dick Vogels at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Caltrans? requirements and will be required to sign the standard Peterson-Chase GEC., Inc. Subcontract Agreement. Plans and specifications are available to be viewed in our office located at 16351 Construction Circle West, Irvine, CA 92606, between 8:00 AM and 3:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Peterson-Chase GEC., Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. Peterson Chase General Engineering Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.
Date posted: 12/18/2017
Contractor: Peterson Chase General Engineering Construction Inc. Contact: Kali Goglanian
Address: 16351 Construction Circle West Irvine, CA 92606
Phone: 949-252-0441 Fax: 949-252-0266 Email: bids@petersonchase.com
Services needed: Peterson-Chase General Engineering Construction, Inc. is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign (Ls), Prepare Water Pollution Control Program, Work Area Monitoring (Bridge), Core And Bond Dowel(Chemical Adhesive), Furnish Structural Steel (Bridge), Erect Structural Steel (Bridge), Reconstruct Damper Brackets, Furnish Viscous Dampers, Install Viscous Dampers, High Strength Threaded Rods, Clean And Paint Structural Steel, Clean And Paint Structural Steel (Existing Bridge), Spot Blast Clean And Paint Undercoat, Steam Cleaning Existing Dampers Fluid Leakage, Bridge Removal (Portion). Please email your quotes to Bids@petersonchase.com
Requirements: Peterson-Chase General Engineering Construction Inc. can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Dick Vogels at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Caltrans? requirements and will be required to sign the standard Peterson-Chase GEC., Inc. Subcontract Agreement. Plans and specifications are available to be viewed in our office located at 16351 Construction Circle West, Irvine, CA 92606, between 8:00 AM and 3:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Peterson-Chase GEC., Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. Peterson Chase General Engineering Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.
Date posted: 12/18/2017
Contractor: Riverside Construction Company, Inc. Contact: Brian Pim
Address: 4225 Garner Road Riverside
Phone: 9516828308 Fax: 9516825872 Email: estimating@rivconstruct.com
Services needed: All Bid Items are open for DBE participation! Including but not limited to the following: Traffic Control, A.C. Dike, A.C. Paving, Striping, Signs, Clearing and Grubbing, Joint Seal, Roadway Excavation, Concrete Barrier, Drill and Bond Dowel, Fence and Guard Rail, Grind Concrete Paving.
Requirements: Riverside Construction Company, Inc. is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. Riverside Construction Company, Inc. is interested in soliciting in Good Faith, including assistance in obtaining bonds, lines of credit, insurance, necessary equipment, materials and/or supplies. Subcontractors may be required to furnish performance and payment bonds in the full amount of their subcontract by an admitted surety and subject to approval by our estimating department. A Worker?s Compensation Waiver of Subrogation will be required. Conditions or exceptions in Subcontractor?s quote are expressly rejected unless accepted in writing. Subcontractor scope (including any conditions or exceptions) is required 24 hours prior to bid deadline to allow proper evaluation. Quotes are required to be in accordance with the plans and specifications and good for the contract duration as specified in the bid documents. In order to assist DBE Contractors and suppliers, Riverside Construction Company will divide bid items into smaller tasks or quantities when feasible to facilitate maximum participation.
Date posted: 12/18/2017
Contractor: Griffith Company Contact: Katherine Lovetere
Address: 12200 Bloomfield Avenue, Santa Fe Springs CA 90670
Phone: 562-929-1128 Fax: 562-864-8970 Email: klovetere@griffithcompany.net
Services needed: Griffith Company is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: For the following project: Caltrans 08-0K2914 ? FOR CONSTRUCTION ON STATE HIGHWAY IN SAN BERNARDINO COUNTY IN REDLANDS FROM ORANGE STREET UNDERCROSSING TO REDLANDS BLVD OFF-RAMP UNDERCROSSING SCOPE OF WORK: LEAD COMPLIANCE PLAN, PROGRESS SCHEDULE (CRITICAL PATH METHOD), TIME-RELATED OVERHEAD (WDAY), DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, AUTOMATED WORK ZONE INFORMATION SYSTEM, TEMPORARY PAVEMENT MARKING (PAINT), TEMPORARY TRAFFIC STRIPE (PAINT), CHANNELIZER (SURFACE MOUNTED), TEMPORARY PAVEMENT MARKER, TEMPORARY PEDESTRIAN ACCESS ROUTE, PORTABLE CHANGEABLE MESSAGE SIGN (LS), TEMPORARY RAILING (TYPE K), TEMPORARY CRASH CUSHION MODULE, TEMPORARY TRAFFIC SCREEN, JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, TEMPORARY SOIL BINDER, TEMPORARY COVER, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, TREATED WOOD WASTE, REMOVE CONCRETE (MISCELLANEOUS) (CY), CLEARING AND GRUBBING (LS), ROADWAY EXCAVATION, FINISHING ROADWAY, CLASS 2 AGGREGATE SUBBASE, CLASS 2 AGGREGATE BASE (CY), LEAN CONCRETE BASE, LEAN CONCRETE BASE RAPID SETTING, REPLACE BASE, BASE BOND BREAKER, REPLACE ASPHALT CONCRETE SURFACING, PRIME COAT, HOT MIX ASPHALT (TYPE A), MINOR HOT MIX ASPHALT, RUBBERIZED HOT MIX ASPHALT (GAP GRADED), PLACE HOT MIX ASPHALT DIKE (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE C), PLACE HOT MIX ASPHALT DIKE (TYPE E), PLACE HOT MIX ASPHALT DIKE (TYPE F), PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA), TACK COAT, REMOVE ASPHALT CONCRETE DIKE, REMOVE BASE AND SURFACING, JOINTED PLAIN CONCRETE PAVEMENT, JOINTED PLAIN CONCRETE PAVEMENT (RSC), DRILL AND BOND (DOWEL BAR), INDIVIDUAL SLAB REPLACEMENT (RSC), JOINT SEAL (PREFORMED COMPRESSION), REPLACE JOINT SEAL (PREFORMED COMPRESSION, 7/16" TO 13/16"), ISOLATION JOINT SEAL (PREFORMED COMPRESSION), REMOVE CONCRETE PAVEMENT AND BASE, GRIND EXISTING CONCRETE PAVEMENT, STRUCTURAL CONCRETE, APPROACH SLAB (TYPE R), MINOR CONCRETE (MINOR STRUCTURE), PAVING NOTCH EXTENSION, CLEAN EXPANSION JOINT, JOINT SEAL (MR 1"), BONDED JOINT SEAL (MR 2"), BONDED JOINT SEAL (MR 1 1/2"), BAR REINFORCING STEEL, DETECTABLE WARNING SURFACE, MINOR CONCRETE (GUTTER DEPRESSION), MINOR CONCRETE (CURB, SIDEWALK AND CURB RAMP), REMOVE CONCRETE SIDEWALK (SQYD), REMOVE CONCRETE (CURB AND GUTTER), PRE/POST CONSTRUCTION SURVEYS, SURVEY MONUMENT (TYPE D), REMOVE PAVEMENT MARKER, PAVEMENT MARKER (RETROREFLECTIVE), REMOVE ROADSIDE SIGN, FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED), ROADSIDE SIGN - ONE POST, MIDWEST GUARDRAIL SYSTEM (STEEL POST), VEGETATION CONTROL (MINOR CONCRETE), TRANSITION RAILING (TYPE WB-31), END CAP (TYPE A), END CAP (TYPE TC), END ANCHOR ASSEMBLY (TYPE SFT), ALTERNATIVE FLARED TERMINAL SYSTEM, SOFTSTOP TERMINAL SYSTEM, CONCRETE BARRIER (TYPE 60), CONCRETE BARRIER (TYPE 60GC MOD), CONCRETE BARRIER TRANSITION, SALVAGE GUARDRAIL, RECONSTRUCT GUARDRAIL, REMOVE CONCRETE BARRIER, THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY), PAINT TRAFFIC STRIPE (2-COAT), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), REMOVE THERMOPLASTIC TRAFFIC STRIPE, REMOVE THERMOPLASTIC PAVEMENT MARKING, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, MICROWAVE VEHICLE DETECTION SYSTEM, MODIFYING EXISTING ELECTRICAL SYSTEM, MOBILIZATION. Griffith Company will work with interested subcontractors to identify opportunities to break down items into economically feasible packages.
Requirements: Requirements: Griffith Company is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons, and Carpenters Unions. 100% performance and payment bonds required for the full amount of the subcontract price. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation insurance coverage meeting Griffith?s requirements. A copy of the insurance requirements and agreements can be obtained by contacting the Estimator. Please call if you need assistance in obtaining bonding, insurance, equipment, materials, and/or supplies. Griffith Company intends to work cooperatively with all qualified firms seeking work on this project. Griffith Company is an Equal Opportunity Employer.
Date posted: 12/18/2017
Contractor: Royal Bridge Inc. Contact: Emmanuel Chrysakis
Address: 3601 Alt. 19 Palm Harbor, FL 34683
Phone: 727-934-6042 Fax: 727-234-0942 Email: emmanuel@royalbridgeinc.com
Services needed: Royal Bridge, Inc. Is requesting/seeking certified and qualified DBE subcontractors or suppliers and non DBE subcontractors/suppliers to provide the following items but not limited to- Lead Compliance Plan, Progress Schedule (Critical Path Method), Construction Area Signs, Traffic Control System, Job Site Management, Prepare Water Pollution Control Program, Temporary Concrete Washout, Work Area Monitoring (Bridge), Temporary Decking, Structural Concrete-Bridge (RSC), Drill and Bond Dowel, Joint Seal (MR 1 ??), Joint Seal (MR 2?)Bar Reinforcing Steel (Bridge), Furnish Structural Steel (Bridge), Erect Structural Steel (Bridge), Fiberglass Reinforced Grating, Clean and Paint Structural Steel, Clean and Paint Structural Steel (Existing Bridge), Repair Spalled Surface Area, Bridge Removal (Portion), Miscellaneous Metal (Bridge), Temporary Fence (Type CL-6), and Mobilization. Please email your quotes to: emmanuel@royalbridgeinc.com and tommy@royalbridgeinc.com.
Requirements: Plans and specifications can be obtained from the Caltrans website for the above listed project at the following link: 296604 http://www.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php Bond along with insurance are required of all subcontractors. If interested send emails to emmanuel@royalbridgeinc.com and tommy@royalbridgeinc.com. Quotes should be emailed over at least 24 hours prior to the bid opening. Questions, call Emmanuel Chrysakis at 727-934-6042.
Date posted: 12/20/2017
Contractor: Alpha Painting & Construction Co Inc dba Alpha Painting Co Contact: Tom Kousisis
Address: 6800 Quad Avenue Baltimore, MD, 21237
Phone: 410-288-6800 Fax: 410-288-6805 Email: tkousisis@alphapainting.net
Services needed: Prime Contractor is seeking certified and qualified DBE and Non DBE subcontractors and suppliers to perform following work for this project including but not limited to: LEAD COMPLIANCE PLAN, PROGRESS SCHEDULE, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, JOB SITE MGT, PREPARE WATER POLLUTION CONTROL PROGRAM, TEMPORARY CONCRETE WASHOUT, WORK AREA MONITORING, TEMPORARY DECKING, STRUCTURAL CONCRETE BRIDGE (RSC), DRILL AND BOND DOWEL, JOING SEAL MR 1.5" & 2", BAR REINFORCING STEEL (BRIDGE), ERECT STRUCTURAL STEEL (BRIDGE), FIBERGLASS REINFORCED GRATING, CLEAN & PAINT STRUCTURAL STEEL, CLEAN & PAINT STRUCTURAL STEEL (EXISTING BRIDGE), REPAIR SPALLED SURFACE AREA, BRIDGE REMOVAL (PORTION), MISC METAL (BRIDGE), TEMPORARY FENCE (TYPE CL-6), HAZARDOUS WASTE DISPOSAL, FUEL SUPPLY & DELIVERY, EQUIPMENT RENTAL. Work items may be split to encourage participation.
Requirements: Project spec and plans can be accessed from Caltrans website for advertised projects, contract 07-296604 http://www.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php. Please contact company representatives listed below with any questions or need for assistance related to contract requirements including plans and specification related to this solicitation. Company rep should be contact for any required assistance in obtaining bonding, lines of credit, insurance, equipment, materials and supplies. Alpha Painting is a is a Union Signatory Contractor. CALTRANS REQUIRES PAINTING SUBCONTRACTORS TO SUBMIT PROOF OF SSPC QP1 & QP2 CERTIFICATIONS. Please email interest in the project as soon as possible. Quotes are to be emailed no later than 24 hours prior to bid opening. IN ORDER TO ASSURE QUOTES ARE TIMELY RECEIVED, PLEASE EMAIL QUOTES TO: tkousisis@alphapainting.net. Please direct questions via email or call Tom Kousisis at 646-235-6708. All subcontractors will need to provide insurance, workers compensation coverage, bond and possess current contractor?s license.
Date posted: 12/20/2017
Contractor: Myers and Sons Construction Contact: Joe Goehring
Address: 4600 Northgate Blvd., Suite 100 Sacramento, CA 95834
Phone: 916-283-9950 Fax: 916-614-9520 Email: jgoehring@myers-sons.com
Services needed: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, AUTOMATED WORK ZONE INFORMATION SYSTEM, TEMP TRAFFIC CONTROL, SWPPP, TEMP EROSION CONTROL, STREET SWEEPING, TREATED WOOD WASTE, CONCRETE REMOVAL, CLEARING AND GRUBBING, ROADWAY EX, FINISHING ROADWAY, CLASS 2 AB/SUBBASE, LEAN CONCRETE BASE, REPLACE BASE, BASE BOND BREAKER, REPLACE AC SURFACING, PRIME COAT, AC PAVING, AC DIKE, TACK COAT, REMOVE ASPHALT/BASE/SURFACING, JPCP, DRILL AND BOND, ISR, JOINT SEALS, GRINDING, STRUCTURAL CONCRETE, FURNISH READY MIX, MINOR CONCRETE, PAVING NOTCH EXTENSION, CLEAN EXPANSION JOINT, REBAR, DETECTABLE WARNING SURFACE, CONCRETE REMOVAL, CONSTRUCTION SURVEYS, SURVEY MONUMENT, PAVEMENT MARKER, SIGNS, RAILING & BARRIERS, THERMOPLASTIC STRIPING & MARKING, PAINTED STRIPING, ELECTRICAL & ALL OTHER RELATED ITEMS
Requirements: 100% Payment & Performance Bonds may be required for the full amount of the subcontract price. Subcontractors must possess a valid Contractor?s License, DIR Registration number, current insurance meeting Myers and Sons Construction?s Subcontract Agreement. Quotations must be valid for one hundred twenty (120) days after the specified Contract Award Date by the Owner. Plans and Specifications are available for viewing at our Sacramento office, please contact (916) 283-9950 or mstockton@myers-sons.com. Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies or visit our website at www.myers-sons.com for more information. Myers and Sons Construction will work cooperatively with all qualified firms seeking work in this project. Myers and Sons Construction is signatory to the Laborers, Carpenters, Cement Masons and Operating Engineers. Myers and Sons Construction is an equal opportunity employer.
Date posted: 12/26/2017
Contractor: Ames Construction, Inc. Contact: Jennifer Lewis
Address: 391 N. Main Street, Suite 302 Corona, CA 92880
Phone: 951-356-1275 Fax: 951-549-9003 Email: jenniferlewis@amesco.com
Services needed: DBE Subs/Suppliers required include but are not limited to: Lead compliance plan, develop water supply, construction area signs, traffic control, pavement marking & striping, objects and markers, PCMS, K rail, traffic screen, SWPPP, REAP, soil binder, erosion control, treated wood base, demo, clear & grub, aggregates, lean concrete, concrete supply, street sweeping, A.C. paving, A.C. dike, jointed plain concrete pavement, rebar, trucking, joint seal, grind concrete pavement, minor structures, detectable warning surface, minor concrete, survey monument, roadway signs, fencing, vegetation control, survey, guardrail, terminal systems, concrete barrier and electrical. Ames intends to conduct itself in good faith with DBE firms for participation on this project. Ames will work with subcontractors to breakdown items into economical feasible packages.
Requirements: Ames will require bidder to provide performance and payment bonds for the full amount of the Subcontract values. Costs of the bonds are to be provided as a separate line item. Please call to discuss how Ames Construction, Inc. can assist you in your bonding, credit and/or insurance needs. Also, let us know if you need assistance in obtaining necessary equipment, supplies, or materials for this project. We are an equal opportunity employer. Ames? Subcontract terms and conditions will apply to any contracts resulting from this request. The Subcontractor, by submission of its bid, agrees to the ?Terms and Conditions? including all Exhibits and Attachments of Ames Subcontract Agreement. Ames reserves the right to accept or reject any or all quotations. Pricing submitted to Ames construction, Inc. for this project must be valid for the same duration as specified by Owner for award of contract. Our Lead Estimator for this project is Chris Acosta. He can be reached at (951) 356-1275. Please fax quotes to (951) 549-9003.Plans and specifications can be viewed and downloaded at: https://ames.sharefile.com/d/23229418eecb46bd
Date posted: 12/29/2017
Contractor: Myers and Sons Construction Contact: Joe Goehring
Address: 4600 Northgate Blvd., Suite 100 Sacramento, CA 95834
Phone: 916-283-9950 Fax: 916-614-9520 Email: jgoehring@myers-sons.com
Services needed:
Requirements:
Date posted: 01/03/2018
Contractor: Coffman Specialties, Inc. Contact: Estimating Department
Address: 9685 Via Excelencia, Ste 200 San Diego, CA 92126
Phone: 858-536-3100 Fax: 858-586-0164 Email: estimating@coffmanspecialties.com
Services needed: ? TRUCKING ? EQUIPMENT RENTAL ? LEAD COMPLIANCE PLAN ? CONSTRUCTION AREA SIGNS ? ROADSIDE SIGNS ? TRAFFIC CONTROL ? WATER TRUCK ? EARTHWORK/GRADING/ROADWAY EXCAVATION ? EROSION CONTROL ? METAL BEAM GUARD RAIL (MBGR) ? STREET SWEEPING ? REBAR ? CONCRETE ? MINOR CONCRETE ? BIOLOGIST ? CLEAR & GRUB ? LANDSCAPING ? ROCK SLOPE PROTECTION ? STORM DRAIN UNDERGROUND ? SWPPP/WPC ? AGGREGATE SUPPLY ? AGGREGATE BASE ? SURVEY/QC If you have any questions, Please contact Marty Keane: Phone 858-536-3100, Fax 858-586-0164 or email estimating@coffmanspecialties.com. Coffman Specialties, Inc. 9685 Via Excelencia, Suite 200 San Diego, California 92126 Phone (858) 536-3100 Bid Fax (858) 586-0164 estimating@coffmanspecialties.com
Requirements: Coffman Specialties, Inc. is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. Quotations must be valid for the same duration as specified by the Owner for contract award. Insurance and 100% Payment & Performance Bonds will be required, and will pay up to 1.5% for the cost of the bond. Waiver of Subrogation will be required. We will provide assistance/advice with obtaining Bonds/Insurance/Credit/Equipment. Subcontractors must provide contractor?s license number and Department of Industrial Relations (DIR) registration number with their quote. Plans and specs are available at no cost to interested DBE firms from the CALTRANS WEBSITE using the Project ID # 08-0R1604 and/or our San Diego Office. We are an EOE & seriously intend to negotiate with qualified firms.
Date posted: 01/05/2018
Contractor: Peterson Chase General Engineering Construction Inc. Contact: Kali Goglanian
Address: 16351 Construction Circle West Irvine, CA 92606
Phone: 949-252-0441 Fax: 949-252-0266 Email: bids@petersonchase.com
Services needed: Peterson-Chase General Engineering Construction, Inc. is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: Lead Compliance Plan, Develop Water Supply, Construction Area Signs, Traffic Control System, Traffic Plastic Drum, Portable Changeable Message Sign (Ea), Temporary Railing (Type K), Temporary Alternative Crash Cushion System, Job Site Management, Prepare Storm Water Pollution Prevention Plan, Storm Water Annual Report,Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Reinforced Silt Fence, Temporary Construction Entrance,Temporary Concrete Washout, Treated Wood Waste, Remove Concrete (Cy), Clearing And Grubbing (Ls), Dust Palliative, Roadway Excavation, Roadway Excavation (Type R-1) (Aerially Deposited Lead), Structure Excavation (Retaining Wall), Structure Backfill (Retaining Wall), Ditch Excavation, Imported Borrow (Cy), Roadside Clearing, Weed Germination, Packet Fertilizer, Slow-Release Fertilizer, Plant (Group F), Plant (Group A), Plant (Group B), Plant (Group U), Sod, Maintain Existing Planted Areas, Plant Establishment Work, Wood Mulch, Check And Test Existing Irrigation Facilities, Operate Existing Irrigation Facilities, Remove Irrigation Facility,Test And Modify Control Conductors, Control And Neutral Conductors, 1" Remote Control Valve, 1 1/2" Remote Control Valve, 2" Remote Control Valve, Two 32 Station Irrigation Controllers And Enclosure '81a' And '81b', Two 32 Station Irrigation Controllers And Enclosure '82a' And '82b', 16 Station Irrigation Controller And Enclosure '84b', 32 Station Irrigation Controller And Enclosure '84c', Modify Irrigation Controller And Enclosure '84a', Antenna Mast, Certify Existing Backflow Preventers, Flow Sensor, Tree Well Sprinkler Assembly, Riser Sprinkler Assembly (Gear Driven), Pop-Up Sprinkler Assembly (Gear Driven), Replace Valve Box Cover, 2" Gate Valve, 3" Gate Valve, 1" Plastic Pipe (Schedule 40) (Supply Line), 1 1/4" Plastic Pipe (Schedule 40) (Supply Line), 1 1/2" Plastic Pipe (Schedule 40) (Supply Line), 2" Plastic Pipe (Schedule 40) (Supply Line), 2 1/2" Plastic Pipe (Class 315) (Supply Line), 3" Plastic Pipe (Class 315) (Supply Line), 4" Plastic Pipe (Class 315) (Supply Line), 8" Pvc Pipe Conduit, Bonded Fiber Matrix (Sqft), Rolled Erosion Control Product (Netting), Compost (Erosion Control), Class 2 Aggregate Base (Cy), Hot Mix Asphalt (Type A), Place Hot Mix Asphalt Dike (Type A), Place Hot Mix Asphalt Dike (Type C), Place Hot Mix Asphalt Dike (Type D), Place Hot Mix Asphalt (Miscellaneous Area), Remove Asphalt Concrete Dike, 16" Cast-In-Drilled-Hole Concrete Piling (Sound Wall), Structural Concrete, Retaining Wall, Structural Concrete, Sound Wall, Structural Concrete (Junction Structure), Structural Concrete, Drainage Inlet, Architectural Treatment (Ashlar Texture), Bar Reinforcing Steel (Retaining Wall), Sound Wall (Masonry Block), Access Gate (Sound Wall), Sound Wall (Masonry Block Modified), Access Gate - Wood (Sound Wall), Access Gate - Wood (Sound Wall Ready Fitted System), Sound Wall Transparent (Ready Fitted System), Sound Wall Transparent (Masonry System), Remove Sound Wall (Sqft), 18" Alternative Pipe Culvert, 24" Reinforced Concrete Pipe, 36" Reinforced Concrete Pipe (Class V), 18" Polymeric Sheet Coated Corrugated Steel Pipe (0.109" Thick), 24" Concrete Flared End Section, 36" Reinforced Concrete Pipe Riser, Rock Slope Protection (Facing, Method B) (Cy), Concrete (Ditch Lining), Concrete (Concrete Apron), Rock Slope Protection Fabric (Class 8), Booster Pump (Ea), Miscellaneous Iron And Steel, Reset Mailbox, Temporary Fence (Type Cl-6, Slatted), Chain Link Fence (Type Cl-6), 6' Chain Link Gate (Type Cl-6), Remove Fence, Remove Chain Link Fence, Reconstruct Fence, Guard Railing Delineator, Midwest Guardrail System, Cable Railing, End Anchor Assembly (Type Sft), Softstop Terminal Systems, Remove Guardrail, Subsurface Locators, Modifying Existing Electrical System. Please email your quotes to Bids@petersonchase.com
Requirements: Peterson-Chase General Engineering Construction Inc. can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Dick Vogels at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Caltrans? requirements and will be required to sign the standard Peterson-Chase GEC., Inc. Subcontract Agreement. Plans and specifications are available to be viewed in our office located at 16351 Construction Circle West, Irvine, CA 92606, between 8:00 AM and 3:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Peterson-Chase GEC., Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. Peterson Chase General Engineering Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.
Date posted: 02/06/2018
Contractor: Skanska USA Civil West California District Inc. Contact: Tom Mehas
Address: 1995 Agua Mansa Road Riverside, California 92509
Phone: 951/684-5360 Fax: 951 - 788-2449 Email: bids.socal@skanska.com
Services needed: Skanska is interested in soliciting in Good Faith all subcontractors as well as certified DBE companies for this project. All interested subcontractors, please indicate all lower tier DBE participation offered on your quotation as it will be evaluated with your price. Please call if we can assist you in obtaining bonding, lines of credit, insurance, necessary equipment, materials and or supplies. Skanska will also review breaking out scope packages and adjusting schedules to help permit maximum participation. Plans and Specifications are available for view at our main office in Riverside or on the Caltrans website: http://www.dot.ca.gov/hq/esc/oe/weekly_ads/index.php Quotes requested for contractors, suppliers, and service providers include but are not limited to: LEAD COMPLIANCE PLAN, PROGRESS SCHEDULE (CRITICAL PATH METHOD), DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS RETROREFLECTIVE SHEETING (TYPE XI) FOR CONSTRUCTION AREA SIGNS,TRAFFIC CONTROL SYSTEM, FLASHING BEACON (PORTABLE), PORTABLE CHANGEABLE MESSAGE SIGN, JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, STORM WATER ANNUAL REPORT, MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL), TEMPORARY COVER, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY CONSTRUCTION ENTRANCE, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, TREATED WOOD WASTE, CONTRACTOR-SUPPLIED BIOLOGIST, NATURAL RESOURCE PROTECTION PLAN, TEMPORARY HIGH-VISIBILITY FENCE, CLEARING AND GRUBBING, DUST PALLIATIVE, ROADWAY EXCAVATION, IMPORTED BORROW (CY), SOIL AMENDMENT, PLANT (GROUP A), PLANT ESTABLISHMENT WORK, MOVE-IN/MOVE-OUT (EROSION CONTROL), DUFF, BONDED FIBER MATRIX (SQFT), FIBER ROLLS, COMPOST, INCORPORATE MATERIALS, CLASS 2 AGGREGATE BASE, MINOR HOT MIX ASPHALT, PLACE HOT MIX ASPHALT DIKE(TYPE D), PLACE HOT MIX ASPHALT DIKE (TYPE E), HOT MIX ASPHALT DIKE(TYPE F), PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA), REMOVE ASPHALT CONCRETE DIKE, STRUCTURAL CONCRETE, BOX CULVERT, STRUCTURAL CONCRETE, HEADWALL, BAR REINFORCING STEEL, 24" CORRUGATED STEEL PIPE (.064" THICK), 30" CORRUGATED STEEL PIPE (.064" THICK), 30" CORRUGATED STEEL PIPE (.079" THICK), 36" CORRUGATED STEEL PIPE (.064" THICK), 36" CORRUGATED STEEL PIPE (.079" THICK), 42" CORRUGATED STEEL PIPE (.064" THICK), 42" CORRUGATED STEEL PIPE (.109" THICK), 48" CORRUGATED STEEL PIPE (.064" THICK), 48" CORRUGATED STEEL PIPE (.109" THICK), 54" CORRUGATED STEEL PIPE (.079" THICK), 54" CORRUGATED STEEL PIPE (.109" THICK), 60" CORRUGATED STEEL PIPE (.138" THICK), 66" CORRUGATED STEEL PIPE (.138" THICK), 72" CORRUGATED STEEL PIPE (.138" THICK), 78" CORRUGATED STEEL PIPE (.138" THICK), 84" CORRUGATED STEEL PIPE (.138" THICK), 102" CORRUGATED STEEL PIPE (.168" THICK), 108" CORRUGATED STEEL PIPE (.168" THICK), 36" BITUMINOUS COATED CORRUGATED STEEL PIPE (.079" THICK), 48" BITUMINOUS COATED CORRUGATED STEEL PIPE (.109" THICK), 42" X 29" CORRUGATED STEEL PIPE ARCH (.079" THICK), 49" X 33" CORRUGATED STEEL PIPE ARCH (.109" THICK), 57" X 38" CORRUGATED STEEL PIPE ARCH (.109" THICK), 64" X 43" CORRUGATED STEEL PIPE ARCH (.109" THICK), 71" X 47" CORRUGATED STEEL PIPE ARCH (.138" THICK), 83" X 57" CORRUGATED STEEL PIPE ARCH (.138" THICK), 49" X 33" STEEL FLARED END PIPE ARCH SECTION, 57" X 38" STEEL FLARED END PIPE ARCH SECTION, DELINEATOR (SPECIAL), GUARD RAILING DELINEATOR, MARKER (CULVERT), RESET ROADSIDE SIGN, MIDWEST GUARDRAIL SYSTEM (WOOD POST), VEGETATION CONTROL (MINOR CONCRETE), CABLE RAILING, CONNECT GUARD RAILING TO STRUCTURE, TRANSITION RAILING (TYPE WB-31), END ANCHOR ASSEMBLY (TYP SFT), SOFTSTOP TERMINAL SYSTEMS, AND REMOVE GUARDRAIL.
Requirements: Requirements: Please submit scope sheets 3 days prior to bid to allow for proper evaluation. Subcontracting Requirements: Skanska?s insurance requirements are Commercial General Liability (GL): $1M ea. occ., $1M personal injury, $2M products & completed operations agg. & general agg.; $1M Auto Liability; $5M Excess/Umbrella and $1M Workers Comp. Endorsements and waivers required are the Additional Insured End., Primary Wording End., & a Waiver of Subrogation (GL & WC). Other insurance requirements may be necessary per scope. Subcontractors may be required to furnish performance & payment bonds in the full amount of their subcontract by an admitted surety & subject to approval by Skanska. Skanska will pay bond premium up to 1%. Quotations must be valid for the same duration as specified by the Owner for contract award. Conditions or exceptions in Subcontractor?s quote are expressly rejected unless accepted in writing. Skanska is signatory to the Operating Engineers, Laborers, Cement Masons, & Carpenters Unions. Subcontractors must provide weekly, one original and one copy of all certified payrolls, including non-performance and fringe benefit statements if required by law or by the Prime Contract. Skanska is an Equal Opportunity/Affirmative Action Employer This contractor and subcontractor(s) shall abide by the requirements of 41 CFR 60-300.5(a) and 60-741.5(a). These regulations prohibit discrimination against qualified individuals on the basis of protected veteran status or disability, and require affirmative action by covered prime contractors and subcontractors to employ and advance in employment qualified protected veterans and individuals with disabilities.
Date posted: 01/08/2018
Contractor: Golden State Bridge, Inc. Contact: David Riccitiello
Address: 3701 Mallard Drive Benicia, CA 94510
Phone: 925-372-8000 Fax: 925-372-8001 Email: dave@gsbridge.com
Services needed: Lead Compliance Plan, Develop Water Supply, Construction Area Signs, Traffic Control System, Temp. Traffic Stripe (Paint), Channelizer (Surface Mounted), P.C.M.S., Temp. Railing (Type K), Temp. Crash Cushion Module, Prepare SWPPP, Rain Event Action Plan, Storm Water Sampling and Analysis Day, Storm Water Annual Report, Temp. Cover, Temp. Drainage Inlet Protection, Temp. Fiber Roll, Temp. Construction Entrance, Street Sweeping, Temp. Concrete Washout, Health and Safety Plan, Treated Wood Waste, Clearing and Grubbing, Structure Backfill (Bridge), Lean Concrete Backfill, Wood Mulch, Move-In/Move-Out (Erosion Control), Imported Topsoil, Rolled Erosion Control Product (Netting), Hydromulch, Fiber Rolls, Hydroseeding, Compost, Incorporate Materials, Hot Mix Asphalt (Type A), Place Hot Mix Asphalt Dike (Type C and Type F), Place Hot Mix Asphalt (Misc. Area), Remove Asphalt Concrete Dike, Temp. Support, Structural Concrete; Bridge, Structural Concrete, Approach Slab (Type R), Structural Concrete; Drainage Inlet, Minor Concrete (Backfill), Drill and Bond Dowel, Clean Expansion Joint, Joint Seal, Bar Reinforcing Steel, Structural Steel, Repair Spalled Surface Area, Core Concrete, Bridge Removal (Portion), Replace Bearing Pad, 12 in. Corrugated Steel Pipe, 18? Slotted Corrugated Steel Pipe, Anchor Assembly, Remove Pipe, Minor Concrete (Gutter Depression), Misc. Iron and Steel, Temp. Fence (Type CL-6), Chain Link Fence, Steel Access Gate, 16 ft. Chain Link Gate (Type CL-6), Remove Fence, Reconstruct Fence, Remove Pavement Marker, Guard Railing Delineator, Pavement Marker (Retroreflective), Object Marker (Type P), Midwest Guardrail System (Steel Post), Vegetation Control (Minor Concrete), Concrete Barrier (Type 27S Mod.), Transition Railing (Type WB-31), End Cap (Type A), Concrete Barrier Marker, Concrete Barrier, Remove Guardrail, Salvage Metal Bridge Railing, 2 in. Two - Component Paint Traffic Stripe, 6 in. Two-Component Paint Traffic Stripe, 6 in. Thermoplastic Traffic Stripe, Remove Painted Traffic Stripe, Remove Thermoplastic Traffic Stripe.
Requirements: Please call to discuss how Golden State Bridge, Inc. can assist you in your bonding, credit, and/or insurance needs. Also, let us know if you need assistance in obtaining necessary equipment, supplies, or materials for this project. If you are interested in submitting a subcontractor bid for this project, please fax us your quote at 925-372-8001. Should you have any questions regarding this bid, you may contact David Riccitiello at 925-372-8000 or dave@gsbridge.com. Please be advised, Contractors and subcontractors must register with The D.I.R. (Department of Industrial Relations) in order to bid on public works projects. Registration with The D.I.R. costs $300 and covers the fiscal year (July 1 to June 30th). To verify the status of your DIR number, please visit http://www.dir.ca.gov/Public-Works/Contractors.html.
Date posted: 01/08/2018
Contractor: HighLand Construction, Inc. Contact: Erin Richardson
Address: 133 N. Pixley St., Orange, CA 92868
Phone: 714-538-5156 Fax: 714-538-5157 Email: highlandinc@att.net
Services needed: HighLand Construction is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Channelizer, K-Rail, Temp. Crash Cushions, SWPPP and Reports, Temporary BMPs, Treated Wood Waste, CIDH Piles, Sign Structure (Truss), Polyester Concrete, Bridge Removal, Detectable Warning Surface, Minor Concrete, Construction Survey, Manhole Frame and Cover, Misc. Metal, Modify Existing Signal and Lighting, Striping, Chain Link Railing Type 3, Tubular Handrailing, Concrete Barrier (Type 732SW Modified), Salvage Metal Bridge Railing, Temp. Lighting System, Modify Existing Electrical System.
Requirements: We can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact our office. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Owners? requirements and will be required to sign HighLand Construction?s Subcontract Agreement. Plans and specifications are available at the following link: http://www.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php and then select the contract # from the drop down menu. Or, they may be viewed in our office. Please call Erin Richardson at 714-538-5156. HighLand Construction, Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. HighLand Construction intends to work cooperatively with all qualified firms seeking work on this project.
Date posted: 01/08/2018
Contractor: Argonaut Constructors Contact: Dave Stanford
Address: 360 Sutton Place Santa Rosa, CA 95407
Phone: 707-542-4862 Fax: 707-542-4897 Email: daves@argonautconstructors.com
Services needed: Argonaut Constructors, (Argonaut) an equal opportunity employer, is requesting qualified minority DBE subcontractors and suppliers to submit bids for your trade specialty for the project listed below. Your firm must be currently certified as a DBE firm with an agency acceptable to Caltrans. PLEASE SUBMIT A COPY OF YOUR CURRENT CERTIFICATION WITH YOUR BID. Argonaut is requesting quotes from all Minority and Non-Minority Subcontractors and Suppliers including, but not limited to Construction area signs, lead compliance plan, WPCP, trucking, water trucks, HMA material supplier, tack oil supplier, traffic control, jobsite management, temporary items- drainage inlet protection, concrete washout, cover, erosion control move-in/move-outs, bonded fiber matrix, check dam, gravel bag berm, construction entrance, pedestrian access route, pavement marking and traffic stripe-paint, alternative crash cushion, k-railing, erosion control blanket, fiber roll, high visibility fence, aggregate material supplier-shoulder backing & class II aggregate base, two component paint striping and green pavement marking installation, 6? & 8? thermoplastic striping and pavement marking installation and removal, structural concrete (drainage inlet and headwall), alternative pipe suppliers, detectable warning surface, minor concrete (minor structure, backfill, curb, curb & gutter, sidewalk and driveway, misc. construction, backfill, bar reinforcing steel, vegetation control), miscellaneous iron & steel, portable changeable message sign, rain event action plan, storm water sampling and analysis, storm water annual report, concrete demolition, structure backfill (soil nail wall) wood mulch, fiber rolls, straw, hydroseed, compost, remove base and asphalt surfacing, structure excavation, rolled erosion control product (Blanket), AC dike, cold plane asphalt concrete, sculpted shotcrete, structural shotcrete, 10? flume down drain, inlet and anchor assy., drainage inlet marker, adjust manholes and utilities to grade, rock slope protection rock and fabric, prepare and stain shotcrete, pavement markers (retroreflective) , remove and relocate roadside signs, midwest guardrail system and flared terminal system, soft stop terminal system, cable railing, concrete barrier (Type 60D), modify existing electrical system, street sweeping
Requirements: Requirements: Note: Bids may be faxed to the number listed below. Please make sure that prior to bid time your quotation is received by our company. Scope letters should be submitted the day before the bid date. Bonds may be required: 100% Performance and 100 % Payment for the full amount of subcontractor?s price. Surety companies will have to be approved by Argonaut Constructors (Argonaut). Argonaut may pay up to 1.5 % of the bond premium. Union signatory will be required on this project. Argonaut will offer assistance in obtaining bonding, lines of credit, insurance, equipment or supplies. Argonaut is willing to break down items into economically feasible packages and we are willing to break out any portion of work to encourage participation. Argonaut?s listing of a subcontractor is not an acceptance of any or all of that subcontractor?s conditions, qualifications, exclusions or exceptions included in the subcontractor?s bid proposal. Quotations must be valid for the same duration as specified by the Owner for Contract Award. Argonaut is relying on the price submitted in the subcontractor?s proposal as all-inclusive price for its trade scope found in the plans and specifications regardless of any qualifying language in the proposal. Plans may be reviewed at our office in Santa Rosa or they may be obtained through Caltrans at http://www.dot.ca.gov/hq/esc/oe/weekly_ads/project.php , and viewed local plan rooms, builder?s exchanges such as the North Coast Builders Exchange and California Builders Exchange. Argonaut Constructors is an equal opportunity employer , Argonaut Constructors P. O. Box 639/1236 Central Avenue Santa Rosa, CA 95402/95401Telephone: 707-542-4862/Fax:707-542-4897 E-mail:christerbl@argonautconstructors.com
Date posted: 01/09/2018
Contractor: J. F. Shea Construction, Inc. Contact: Stacy Dutra
Address: 17400 Clear Creek Road Redding, CA 96001
Phone: 530-246-4292 Fax: 530-246-9940 Email: Stacy.Dutra@jfshea.com
Services needed: J. F. Shea Construction, Inc. is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for all items of work, including but not limited to: 1 LEAD COMPLIANCE PLAN 2 PROGRESS SCHEDULE (CRITICAL PATH METHOD) 3 TIME-RELATED OVERHEAD (LS) 4 CONSTRUCTION AREA SIGNS 5 TRAFFIC CONTROL SYSTEM 6 TEMPORARY PEDESTRIAN ACCESS ROUTE 7 PORTABLE CHANGEABLE MESSAGE SIGN (LS) 8 JOB SITE MANAGEMENT 9 PREPARE SWPPP 10 RAIN EVENT ACTION PLAN 11 STORM WATER SAMPLING AND ANALYSIS DAY 12 STORM WATER ANNUAL REPORT 13 MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) 14 TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX) 15 TEMPORARY COVER 16 TEMPORARY DRAINAGE INLET PROTECTION 17 TEMPORARY FIBER ROLL 18 TEMPORARY CONCRETE WASHOUT 19 TREATED WOOD WASTE 20 REMOVE CONCRETE (CY) 21 ROADWAY EXCAVATION 22 ROCK BLANKET 23 WOOD MULCH 24 CLASS 2 AGGREGATE BASE (CY) 25 PREPAVING INERTIAL PROFILER 26 HOT MIX ASPHALT (TYPE A) 27 DATA CORE 28 PLACE HOT MIX ASPHALT DIKE (TYPE C) 29 PLACE HOT MIX ASPHALT DIKE (TYPE E) 30 PLACE HOT MIX ASPHALT DIKE (TYPE F) 31 TACK COAT 32 REMOVE ASPHALT CONCRETE DIKE 33 COLD PLANE ASPHALT CONCRETE PAVEMENT 34(F) STRUCTURAL CONCRETE, DRAINAGE INLET 35(F) MINOR CONCRETE (MINOR STRUCTURE) 36 REMOVE RETAINING WALL (LF) 37 18" ALTERNATIVE PIPE CULVERT 38 24" ALTERNATIVE PIPE CULVERT 39 30" ALTERNATIVE PIPE CULVERT 40(F) CLASS 1 PERMEABLE MATERIAL (BLANKET) 41 24" ALTERNATIVE PIPE DOWNDRAIN 42 DRAINAGE INLET MARKER 43 18" ALTERNATIVE FLARED END SECTION 44 24" ALTERNATIVE FLARED END SECTION 45 30" ALTERNATIVE FLARED END SECTION 46 ABANDON CULVERT (LF) 47 REMOVE CULVERT (LF) 48 REMOVE INLET 49 REMOVE MANHOLE 50 REMOVE FLARED END SECTION (EA) 51 ADJUST MANHOLE TO GRADE 52 ADJUST UTILITY COVER TO GRADE 53 MODIFY DRAINAGE FACILITY 54 SAND BACKFILL 55 ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (CY) 56 ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) 57 ROCK SLOPE PROTECTION FABRIC (CLASS 8) 58 MINOR CONCRETE (CURB) (LF) 59 MINOR CONCRETE (GUTTER) (CY) 60 DETECTABLE WARNING SURFACE 61 MINOR CONCRETE (CURB AND GUTTER) 62 MINOR CONCRETE (ISLAND PAVING) 63 MINOR CONCRETE (DRIVEWAY) 64 MINOR CONCRETE (SIDEWALK) 65 MINOR CONCRETE (CURB RAMP) 66 REMOVE CONCRETE SIDEWALK (SQYD) 67 REMOVE CONCRETE (CURB AND GUTTER) 68 PRE/POST CONSTRUCTION SURVEYS 69(F) MISCELLANEOUS IRON AND STEEL 70 MANHOLE FRAME AND COVER 71 PAVEMENT MARKER (RETROREFLECTIVE-RECESSED) 72 OBJECT MARKER (TYPE L-1) 73 REMOVE ROADSIDE SIGN 74 RESET ROADSIDE SIGN 75 RELOCATE ROADSIDE SIGN 76 FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED) 77 FURNISH SINGLE SHEET ALUMINUM SIGN (0.063" - UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 78 RETROREFLECTIVE SHEETING (TYPE XI) 79 ROADSIDE SIGN - ONE POST 80 INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD) 81 INSTALL SIGN (MAST-ARM HANGER METHOD) 82 MIDWEST GUARDRAIL SYSTEM (STEEL POST) 83 VEGETATION CONTROL (MINOR CONCRETE) 84(F) TUBULAR HANDRAILING (MODIFIED) 85 SINGLE THRIE BEAM BARRIER (WOOD POST) 86 TRANSITION RAILING (TYPE WB-31) 87 END CAP (TYPE TC) 88 END ANCHOR ASSEMBLY (TYPE SFT) 89 ALTERNATIVE IN-LINE TERMINAL SYSTEM 90 ALTERNATIVE FLARED TERMINAL SYSTEM 91 REMOVE GUARDRAIL 92 THERMOPLASTIC PAVEMENT MARKING 93 THERMOPLASTIC TRAFFIC STRIPE (SPRAYABLE) 94 MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION 95 MODIFYING EXISTING ELECTRICAL SYSTEM 96 MOBILIZATION
Requirements: J. F. Shea Construction Inc. is a union signatory contractor. Subcontractors must possess a current contractor?s license, insurance coverage and worker?s compensation for the entire length of the contract. All subcontractors will be required to sign our standard Subcontract Agreement. 100% payment and performance bonds may be required. Please call if you need assistance in obtaining insurance, bonding, equipment, materials and/or supplies. Plans and specifications can be viewed at our office located at 17400 Clear Creek Road, Redding, Ca. 96001 or call for any additional needed project information. J. F. Shea Construction Inc. intends to work cooperatively with all qualified firms seeking work on this project. We are an equal opportunity employer and will work with any interested subcontractor to identify opportunities to break items into economically feasible packages. Women and Minority Employees are encouraged to apply. J. F. SHEA CONSTRUCTION, INC. P.O. Box 494519 - Redding, CA 96049 Phone: (530) 246-4292 Fax: (530) 246-9940 An Equal Opportunity Employer
Date posted: 01/11/2018
Contractor: American Civil Constructors West Coast LLC Contact: Estimating
Address: 2990 Bay Vista Court Benicia CA 94510
Phone: 707-746-8028 Fax: 707-747-0593 Email: estimatingwc@accbuilt.com
Services needed: ACC West Coast would like to encourage all DBE companies whom are classified to perform any of the scopes of work relevant to this project to submit quotes. We are currently requesting quotes for all scopes of work and bid items related to this project. Please see the list of bid items associated with this project for more information. Other items of work in which quotes are greatly desired: Construction Rentals, Misc. Construction Supplies, Flat-Bed and End Dump Hourly Trucking Rates. We will also consider subcontracting other scopes of work offered by interested companies.
Requirements: ACC will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Please call to discuss how ACC West Coast can assist you in your bonding, credit and/or insurance needs. Assistance may include, but is not limited to: Contacting bonding and/or insurance companies on your behalf, arranging with sureties incremental or phased bonding, obtaining necessary equipment, supplies and/or materials. Subcontractors may be required to provide a bond and must have a valid contractor?s license and current insurance coverage that meets ACC and project requirements. Selected subcontractors will be required to sign our standard subcontractor agreement. Please fax quotes no later than 10:00am on bid day. If you have any questions, please contact the project estimator. Plans and Specifications may be viewed at our Benicia office. Quotes must include inclusions and exclusions, and must be valid for a minimum of 60 days following the bid date. ACC is an equal opportunity employer.
Date posted: 01/12/2018
Contractor: DeSilva Gates Construction Contact: Victor Le
Address: 11555 Dublin Blvd., Dublin, CA 94568
Phone: 925-829-9220 Fax: 925-803-4263 Email: dgcestimating@desilvagates.com
Services needed: DeSilva Gates Construction is requesting quotes from all qualified subcontractors and suppliers including certified DBE/SBE firms for the following types of work, including but not limited to: Box Culvert, Clearing & Grubbing, Cold Plane, Concrete Barrier, Construction Area Signs, Electrical, Erosion Control, Fence, Guardrailing, HMA Dike, Landscaping, Lean Concrete Base, Minor Concrete, Minor Concrete Structures, Retaining Wall, Roadside Signs, Sign Structures, Soil Nail Wall, Soldier Pile Wall, Striping and Pavement Markers, WPCP Prep, Underground Work, Vegetation Control Concrete, Trucking, Sweeping, Water Trucks, Erosion Control Materials, Aggregate Subbase Material, Aggregate Base Material, HMA Material, RHMA Material and Tack Coat Material.
Requirements: DeSilva Gates is signatory to Operating Engineers and Laborers unions. 100% performance and payment bonds may be required for the full amount of subcontract price. DeSilva Gates will pay for bond premium up to 2%. Subcontractors must possess current insurance and worker?s compensation coverage meeting DeSilva Gates Construction?s requirements. Subcontractor will be required to sign the standard DeSilva Gates Construction Subcontract Agreement. A copy of the agreement can be obtained from our estimator. Quotations must be valid for the same duration as specified by the Owner for Contract Award. Plans and specifications are available for viewing at our Dublin office. Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies. DeSilva Gates intends to work cooperatively with all qualified firms seeking work on this project. DeSilva Gates is an equal opportunity employer.
Date posted: 01/15/2018
Contractor: Telfer Pavement Technologies, LLC Contact: Rick Arias
Address: 4522 Parker Avenue Suite 350 McClellan, CA. 95652
Phone: 916-383-1756 Fax: 916-383-4084 Email: estimating@telferpavements.com
Services needed: Telfer Pavement Technologies, LLC is seeking quotes from Qualified DVBE subcontractors and suppliers for work including but not limited to: Materials supply/delivery, Trucking, Lead Compliance Plan, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign, Job Site Management, Prepare Water Pollution Control Program, Type II Barricade, Channelizer (Surface Mounted), Temporary Pedestrian Access Route, Temporary Railing (Type K), Temporary Alternative Crash Cushion System, Street Sweeping, Treated Wood Waste, Shoulder Backing, Asphaltic Emulsion (Fog Seal Coat), Prepaving Inertial Profiler, Prepaving Grinding Day, Data Core, HMA Dike (Type C, D, E, F), Cold Plane Asphalt Concrete Pavement, Adjust Frame and Grate to Grade, Detectable Warning Surface, Concrete, Guard Railing Delineator, Roadside Signs, Midwest Guardrail System (Steel Post), Thermoplastic Pavement Markings and Removal, Thermoplastic Traffic Stripe and Removal (Enhanced Wet Night Visibility, Rumble Strips, Electrical, Etc. Telfer Pavement Technologies, LLC will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. All Supplier and Subcontractor proposals shall be in strict accordance with said project plans, specifications, and any addenda issued.
Requirements: DVBE Subcontractors must possess a current contractor?s license, worker's compensation insurance coverage during the entire length of the contract. Performance and Payment bonds may be required. Plans and specification can be obtained from Cal Trans, your local plan room, or may be viewed through our office. You can contact our office if you need assistance in bonding, lines of credit, insurance, necessary equipment, supplies, materials or services required for this job.
Date posted: 01/15/2018
Contractor: Sierra Nevada Construction, Inc. Contact: Tim Morgan
Address: 2055 E Greg Street Sparks, NV 89431
Phone: 775-355-0420 Fax: 775-355-0535 Email: bids@snc.biz
Services needed: We are soliciting quotes for: Rip Rap; Aggregate Base Material; Erosion Control Materials; Misc. Iron and Steel Frame, Cover and Grate; Drain Rock; Asphalt; Asphalt Oil Supply; Construction Area Signs; Traffic Control System; Portable Changeable Message Signs; Cold Plane Asphalt Concrete; Remove AC Dike; Roadway Excavation; Place Aggregate Base; Temporary Erosion Control; Rock Slope Protection; Profile Grinding; Asphalt Paving; Place AC Dike; Concrete Curb and Sidewalk; Minor Concrete Structure; Remove Metal Beam Guard Railing; Placing New Metal Beam Guard Railing; Handrailing; Thermoplastic Traffic Stripe and Marking; Object Markers; Pavement Markers; Roadside Signs; Alternative SD Culverts and Flared End Sections; Precast Drop Inlets; Electrical; Maintain Existing Traffic Management System Elements During Construction; Environmental Engineer/ SWPPP/ WPCP; Lead Compliance Plan; Bottom Dump Trucking; Truck Rental/ Broker; Trucker; Water Truck Rental; Adjust Utilities to Grade; and Heavy Equipment Rental.
Requirements: SNC is a union signatory contractor and is an equal opportunity employer. We will require that all participating companies carry Workers' Compensation & Liability insurance and be bonded. We will assist with obtaining insurance, bonds or lines of credit, equipment, supplies or materials necessary to participate in this project. Plans & specifications are available for viewing at our offices or maybe available on-line.
Date posted: 01/15/2018
Contractor: Abhe & Svoboda, Inc. Contact: Donnell Hauck
Address: 18100 Dairy Lane Jordan, MN 55352
Phone: 952-447-6025 Fax: 952-447-1000 Email: estimating@abheonline.com
Services needed: Prime Contractor is seeking certified and qualified DBE subcontractors and suppliers to perform following work for this project including but not limited to: LEAD COMPLIANCE PLAN, PROGRESS SCHEDULE, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, JOB SITE MGT, PREPARE WATER POLLUTION CONTROL PROGRAM, TEMPORARY CONCRETE WASHOUT, WORK AREA MONITORING, TEMPORARY DECKING, STRUCTURAL CONCRETE BRIDGE (RSC), DRILL AND BOND DOWEL, JOING SEAL MR 1.5" & 2", BAR REINFORCING STEEL (BRIDGE), ERECT STRUCTURAL STEEL (BRIDGE), FIBERGLASS REINFORCED GRATING, REPAIR SPALLED SURFACE AREA, BRIDGE REMOVAL (PORTION), MISC METAL (BRIDGE), TEMPORARY FENCE (TYPE CL-6), HAZARDOUS WASTE DISPOSAL, FUEL SUPPLY & DELIVERY, EQUIPMENT RENTAL.
Requirements: Abhe & Svoboda, Inc. is a Non-Union Contractor and will consider any special bonding, credit, and insurance needs for DBE's. Please email interest in this project as soon as possible, Quotes due by January 31st, 2018. The email address to submit quotes is: estimating@abheonline.com. For information please contact Donnell Hauck: estimating@abheonline.com
Date posted: 01/15/2018
Contractor: Peterson Chase General Engineering Construction Inc. Contact: Kali Goglanian
Address: 16351 Construction Circle West Irvine, CA 92606
Phone: 949-252-0441 Fax: 949-252-0266 Email: bids@petersonchase.com
Services needed: Peterson-Chase General Engineering Construction, Inc. is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Temporary Pavement Marking (Paint), Temporary Traffic Stripe (Paint), Channelizer (Surface Mounted), Temporary Pavement Marker, Temporary Railing (Type K), Temporary Crash Cushion Module, Alternative Temporary Crash Cushion, Job Site Management, Prepare Water Pollution Control Program, Rain Event Action Plan, Storm Water Annual Report, Temporary Drainage Inlet Protection, Temporary Gravel Bag Berm, Street Sweeping, Temporary Concrete Washout, Treated Wood Waste, 60" Cast-In-Drilled-Hole Concrete Pile (Sign Foundation), Furnish Sign Structure (Truss), Install Sign Structure (Truss), Remove Bridge Mounted Sign, Remove Asphalt Concrete Surfacing, Remove Concrete Deck Surface, Prepare Concrete Bridge Deck Surface, Furnish Polyester Concrete Overlay, Place Polyester Concrete Overlay, Bridge Removal (Portion), Location A, Bridge Removal (Portion), Location B, Detectable Warning Surface, Minor Concrete (Curb, Sidewalk And Curb Ramp), Remove Concrete (Curb, Gutter, And Sidewalk) (Cy), Pre/Post Construction Surveys, Manhole Frame And Cover, Miscellaneous Metal (Bridge), Modifying Existing Signal And Lighting System (City), Remove Pavement Marker, Pavement Marker (Retroreflective), Remove Roadside Sign, Furnish Formed Panel Sign(Overhead) For Retroreflective Sheeting(Type Xi), Furnish Laminated Panel Sign(1"-Type A) For Retroreflective Sheeting(Type Xi), Furnish Single Sheet Aluminum Sign (0.063"-Unframed), Furnish Single Sheet Aluminum Sign (0.063"-Unframed) For Retroreflective Sheeting(Type Xi), Furnish Single Sheet Aluminum Sign (0.080"-Unframed), Furnish Single Sheet Aluminum Sign (0.080"-Unframed) For Retroreflective Sheeting (Type Xi), Furnish Single Sheet Aluminum Sign (0.080"-Framed) For Retroreflective Sheeting (Type Xi)Retroreflective Sheeting (Type Xi), Roadside Sign - One Post, Roadside Sign - Two Post, Install Sign (Strap And Saddle Bracket Method), Install Sign Panel On Existing Frame, Install Roadside Sign Panel On Existing Post, Chain Link Railing Type 3, Tubular Handrailing, Concrete Barrier (Type 732sw Modified), Salvage Metal Bridge Railing, 6" Thermoplastic Traffic Stripe,8" Thermoplastic Traffic Stripe, Thermoplastic Pavement Marking, 6" Thermoplastic Traffic Stripe (Broken 6-1), 6" Thermoplastic Traffic Stripe (Broken 17-7). Please email your quotes to Bids@petersonchase.com
Requirements:
Date posted: 01/15/2018
Contractor: Martin Brothers Construction Contact: Connie Dennis
Address: 8801 Folsom Blvd Suite 260 Sacramento CA 95826
Phone: 916-381-0911 Fax: 916-381-1447 Email: cdennis@martinbrothers.net
Services needed: Martin Brothers Construction is requesting quotes from all qualified subcontractors and suppliers including certified SBE / DVBE firms for the following items of work, including but not limited to: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN, JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM, TEMPORARY DRAINAGE INLET PROTECTION, TREATED WOOD WASTE, SHOULDER BACKING, ASPHALTIC EMULSION (FOG SEAL COAT), PREPAVING INERTIAL PROFILER, PREPAVING GRINDING DAY, HOT MIX ASPHALT (TYPE A), MINOR HOT MIX ASPHALT, DATA CORE, PLACE HOT MIX ASPHALT DIKE(TYPE A)/(TYPE C)/TYPE E)/TYPE F), TACK COAT, REMOVE ASPHALT CONCRETE DIKE, COLD PLANE ASPHALT CONCRETE PAVEMENT, DELINEATOR (CLASS 2), MILEPOST MARKER, OBJECT MARKER (TYPE L-1), MIDWEST GUARDRAIL SYSTEM (STEEL POST), TRANSITION RAILING (TYPE WB-31), TYPE SOFTSTOP, TERMINAL SYSTEM, ALTERNATIVE FLARED TERMINAL SYSTEM, REMOVE GUARDRAIL, ADJUST GUARDRAIL, 6" METHYL METHACRYLATE TRAFFIC STRIPE, 6" METHYL METHACRYLATE TRAFFIC STRIPE (BROKEN 36-12), 4" METHYL METHACRYLATE TRAFFIC STRIPE (RECESSED), 6" METHYL METHACRYLATE TRAFFIC STRIPE (RECESSED), 6" METHYL METHACRYLATE TRAFFIC STRIPE (RECESSED, BROKEN 12-3), 6" METHYL METHACRYLATE TRAFFIC STRIPE (RECESSED, BROKEN 17-7), 6" METHYL METHACRYLATE TRAFFIC STRIPE (RECESSED, BROKEN 36-12), 8" METHYL METHACRYLATE TRAFFIC STRIPE (RECESSED), METHYL METHACRYLATE PAVEMENT MARKING, METHYL METHACRYLATE PAVEMENT MARKING (RECESSED), 12" RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT), MODIFYING EXISTING ELECTRICAL SYSTEM, TRUCKING AND SUPPLIER QUOTES on all Required Materials per Project Plans & Specifications. Quotations will be broken down into comparable packages as reasonably necessary. Martin Brothers will work with interested subcontractors to identify opportunities to break down items into economically feasible packages.
Requirements: Martin Brothers Construction is signatory to Operating Engineers, Cement Masons and Laborers. 100% performance and payment bonds may be required for the full amount of subcontract price. Martin Brothers Construction will pay for bond premium up to 1.5%. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Martin Brother?s requirements and will be required to sign the standard Martin Brothers Subcontract Agreement. A copy of the insurance requirements and agreement can be obtained by contacting the estimator. Plans and specifications are available for viewing at our office located at 8801 Folsom Blvd Suite 260, Sacramento, CA and on the CDOT website. Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies. Martin Brothers Construction intends to work cooperatively with all qualified firms seeking work on this project. Martin Brothers Construction is an equal opportunity employer
Date posted: 01/16/2018
Contractor: Golden State Bridge, Inc. Contact: David Riccitiello
Address: 3701 Mallard Drive Benicia, CA 94510
Phone: 925-372-8000 Fax: 925-372-8001 Email: dave@gsbridge.com
Services needed: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign, Prepare Water Pollution Control Program, Temporary Concrete Washout, Hot Mix Asphalt (Type A), Tack Coat, Cold Plane Asphalt Concrete Pavement, Grind Existing Bridge Deck, Structural Concrete, Bridge (RSC), Structural Concrete, Approach Slab (Type R), Paving Notch Extension, Clean Expansion Joint, Joint Seal, Bonded Joint Seal, Rebar, Rapid Setting Concrete (Patch), Remove Asphalt Concrete Surfacing, Remove Unsound Concrete, Polyester Concrete Expansion Dam, Prepare Concrete Bridge Deck Surface, Furnish and Place Polyester Concrete Overlay, Remove Chip Seal, Bridge Removal (Portion), Remove Pavement Marker, Pavement Marker (Retroreflective), Thermoplastic Traffic Stripe, Rumble Strip, Maintaining Existing Traffic Management System Elements During Construction.
Requirements: Please call to discuss how Golden State Bridge, Inc. can assist you in your bonding, credit, and/or insurance needs. Also, let us know if you need assistance in obtaining necessary equipment, supplies, or materials for this project. If you are interested in submitting a subcontractor bid for this project, please fax us your quote at 925-372-8001. Should you have any questions regarding this bid, you may contact David Riccitiello at 925-372-8000 or dave@gsbridge.com. Please be advised, Contractors and subcontractors must register with The D.I.R. (Department of Industrial Relations) in order to bid on public works projects. Registration with The D.I.R. costs $300 and covers the fiscal year (July 1?June 30th). To verify the status of your DIR number, please visit http://www.dir.ca.gov/Public-Works/Contractors.html.
Date posted: 01/16/2018
Contractor: Golden State Bridge, Inc. Contact: David Riccitiello
Address: 3701 Mallard Drive Benicia, CA 94510
Phone: 925-372-8000 Fax: 925-372-8001 Email: dave@gsbridge.com
Services needed: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign, Prepare Water Pollution Control Program, Temporary Concrete Washout, Hot Mix Asphalt (Type A), Tack Coast, Cold Plane Asphalt Concrete Pavement, Grind Existing Bridge Deck, Structural Concrete, Bridge (RSC), Aggregate Base (Approach Slab), Structural Concrete Approach Slab (Type R Modified), Clean Expansion Joint, Joint Seal, Rebar, Public Safety Plan, Rapid Setting Concrete (Patch), Remove Unsound Concrete, Prepare Concrete Bridge Deck Surface, High Friction Surface Treatment (Bridge), Furnish and Place Polyester Concrete Overlay, Remove Chip Seal, Replace Access Door, Bridge Removal (Portion), Remove Pavement Marker, Pavement Marker (Retroreflective), Remove Thermoplastic Traffic Stripe, Traffic Stripe, Maintaining Existing Traffic Management System Elements During Construction.
Requirements: Please call to discuss how Golden State Bridge, Inc. can assist you in your bonding, credit, and/or insurance needs. Also, let us know if you need assistance in obtaining necessary equipment, supplies, or materials for this project. If you are interested in submitting a subcontractor bid for this project, please fax us your quote at 925-372-8001. Should you have any questions regarding this bid, you may contact David Riccitiello at 925-372-8000 or dave@gsbridge.com. Please be advised, Contractors and subcontractors must register with The D.I.R. (Department of Industrial Relations) in order to bid on public works projects. Registration with The D.I.R. costs $300 and covers the fiscal year (July 1?June 30th). To verify the status of your DIR number, please visit http://www.dir.ca.gov/Public-Works/Contractors.html. We are an Equal Opportunity Employer
Date posted: 01/16/2018
Contractor: Brosamer & Wall, Inc Contact: Robert Rosas
Address: 1777 Oakland Blvd., Suite 300 Walnut Creek, CA 94596
Phone: 925-932-7900 Fax: 925-279-2269 Email: rrosas@brosamerwall.com
Services needed: Services needed but not limited: REQUEST FOR QUALIFIED DISADVANTAGED VETERAN BUSINESS ENTERPRISES for following items: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign, Job Site Management SWPPP Support, Prepare Water Pollution Control Program, Core & Bond Dowel (Chemical Adhesive), Furnish & Erect Structural Steel (Bridge), Reconstruct Damper Brackets, Furnish & Install Viscous Dampers, High Strength Threaded Rods, Clean & Paint Structural Steel, Spot Blast Clean And Paint Undercoat, Steam Cleaning Existing Dampers Fluid Leakage, Bridge Removal (Portion), Scaffolding, Safety Supplies and Hoisting.
Requirements: Requirements: Brosamer & Wall, Inc. will work with interested subcontractors/suppliers to identify opportunities to break down items into economically feasible packages to facilitate DVBE Participation. Brosamer & Wall, Inc. is a union signatory contractor. Subcontractors must possess a current contractor?s license, insurance coverage and worker?s compensation for the entire length of the contract. All subcontractors will be required to sign our standard Subcontract Agreement. 100% payment and performance bonds may be required. If you have any questions regarding this project or need assistance in obtaining/waiving insurance, bonding, equipment, materials and/or supplies please call or email Robert Rosas contact information below. Plans and specifications can be viewed at our office located at 1777 Oakland Blvd Suite 300, Walnut Creek, Ca. 94596 or at no cost from Caltrans website. B&W will also make plans electronically please email rrosas@brosamerwall.com for free online link. Brosamer & Wall INC., intends to work cooperatively with all qualified firms seeking work on this project. If you are interested in submitting a subcontractor bid for this project, you may contact Robert Rosas Chief Estimator at 925-932-7900 or fax us your quote at 925-279-2269. Subcontractors, Dealers/Suppliers and Brokers please provide your designation code to us on or before the bid date. B&W, INC., IS AN EQUAL OPPORTUNITY EMPLOYER.
Date posted: 01/16/2018
Contractor: Argonaut Constructors Contact: Dave Stanford
Address: 360 Sutton Place Santa Rosa, CA 95407
Phone: 707-542-4862 Fax: 707-542-4897 Email: daves@argonautconstructors.com
Services needed: Construction area signs, lead compliance plan, WPCP, trucking, water trucks, HMA material supplier, tack oil supplier, traffic control, jobsite management, temporary items- drainage inlet protection, concrete washout, erosion control and move-in/move-outs, check dam, hydraulic mulch, reinforced silt fence, silt fence, alternative temporary crash cushion, k-railing, rolled erosion control product (netting), temporary fiber roll, compost, bonded fiber matrix, temporary high visibility fence, aggregate material supplier- shoulder backing and class II aggregate base, 6 & 8 inch thermoplastic striping and pavement marking installation and removal, temporary traffic stripe (Paint), structural concrete (drainage inlet), alternative pipe suppliers, detectable warning surface, minor concrete (curb & gutter, sidewalk, curb ramp, island paving), bar reinforcing steel, vegetation control (minor concrete), miscellaneous iron & steel, portable changeable message sign, rain event action plan, storm water sampling and analysis, storm water annual report, remove base and surfacing, AC dike, cold plane asphalt concrete, drainage inlet marker, prepare and stain concrete, oxidizing stain, anti-graffiti coating, pavement markers (retroreflective), remove and relocate roadside signs, install and removal of midwest guardrail system and flared terminal system, soft stop terminal system, lighting system, street sweeping, progress schedule, type III barricade, geo-synthetic reinforced embankment, rock blanket, gravel mulch, boulder type A & B, permanent erosion control establishment work, jointed plain concrete pavement, jointed plain concrete pavement (colored), joint seal (silicone), plastic and corrugated steel pipe suppliers, geo-composite drain, precast concrete pipe suppliers, slope paving (concrete), fence type WM metal post, delineator class 1, culvert marker, object marker, aluminum signage, road side signs 1 post and 2 post, traffic monitoring station.
Requirements: Plans: Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. Copies of the contract documents are available from the Caltrans at http://www.dot.ca.gov/hq/esc/oe/weekly_ads/project.php or local plan rooms, builder?s exchanges, and Dodge Scan. Argonaut Constructors encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project. Info: (707-542-4862) Christer Berglund christerbl@argonautconstructors.com Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. Argonaut Constructors (Argonaut) may also assist in obtaining any necessary equipment, supplies, materials or related services. (Please note: Argonaut may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108. Argonaut may pay bond premiums up to 1 ?% of contract cost. Argonaut Constructors is a UNION CONTRACTOR. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements. Requirements: By submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. Argonaut is willing to break down items into economically feasible packages and we are willing to break out any portion of work to encourage participitation. Argonaut?s listing of a subcontractor is not an acceptance of any or all of that subcontractor?s conditions, qualifications, exclusions or exceptions included in the subcontractor?s bid proposal. Argonaut is relying on the price submitted in the subcontractor?s proposal as all-inclusive price for its trade scope found in the plans and specifications regardless of any qualifying language in the proposal. Inconsistent bid terms and conditions shall be void. Argonaut written subcontract document execution is required of all successful subcontract bidders. A copy is available for inspection at our office in Santa Rosa and/or can be provided upon written request prior to bid submission. Insurance: As per our insurance requirements, your bid must include the cost of naming Argonaut Constructors as additional insured; including completed operations coverage, include primary and Non-Contributing wording on your certificate of insurance and waiver of subrogation is required. **ALL QUALIFIED APPLICANTSWILL RECEIVE CONSIDERATION FOR EMPLOYMENT WITHOUT REGARD TO RACE, COLOR, RELIGION, SEX, OR NATIONAL ORIGIN** **ARGONAUT CONSTRUCTORS COMPANY IS AN EQUAL OPPORTUNITY EMPLOYER** Argonaut Constructors 360 Sutton Place Santa Rosa, CA 95407 Phone: (707) 542-4862 Fax: (707) 542-4897
Date posted: 01/17/2018
Contractor: American Civil Constructors West Coast LLC Contact: Estimating
Address: 2990 Bay Vista Court Benicia CA 94510
Phone: 707-746-8028 Fax: 707-747-0593 Email: estimatingwc@accbuilt.com
Services needed: ACC West Coast would like to encourage all DVBE and Small Business companies whom are classified to perform any of the scopes of work relevant to this project to submit quotes. We are currently requesting quotes for all scopes of work and bid items related to this project. Please see the list of bid items associated with this project for more information. Other items of work in which quotes are greatly desired: Construction Rentals, Misc. Construction Supplies, Flat-Bed and End Dump Hourly Trucking Rates. We will also consider subcontracting other scopes of work offered by interested companies.
Requirements: ACC will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Please call to discuss how ACC West Coast can assist you in your bonding, credit and/or insurance needs. Assistance may include, but is not limited to: Contacting bonding and/or insurance companies on your behalf, arranging with sureties incremental or phased bonding, obtaining necessary equipment, supplies and/or materials. Subcontractors may be required to provide a bond and must have a valid contractor?s license and current insurance coverage that meets ACC and project requirements. Selected subcontractors will be required to sign our standard subcontractor agreement. Please fax quotes no later than 10:00am on bid day. If you have any questions, please contact the project estimator. Plans and Specifications may be viewed at our Benicia office. Quotes must include inclusions and exclusions, and must be valid for a minimum of 60 days following the bid date. ACC is an equal opportunity employer.
Date posted: 01/17/2018
Contractor: American Civil Constructors West Coast LLC Contact: Estimating
Address: 2990 Bay Vista Court Benicia CA 94510
Phone: 707-746-8028 Fax: 707-747-0593 Email: estimatingwc@accbuilt.com
Services needed: ACC West Coast would like to encourage all DVBE and Small Business companies whom are classified to perform any of the scopes of work relevant to this project to submit quotes. We are currently requesting quotes for all scopes of work and bid items related to this project. Please see the list of bid items associated with this project for more information. Other items of work in which quotes are greatly desired: Construction Rentals, Misc. Construction Supplies, Flat-Bed and End Dump Hourly Trucking Rates. We will also consider subcontracting other scopes of work offered by interested companies.
Requirements: ACC will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Please call to discuss how ACC West Coast can assist you in your bonding, credit and/or insurance needs. Assistance may include, but is not limited to: Contacting bonding and/or insurance companies on your behalf, arranging with sureties incremental or phased bonding, obtaining necessary equipment, supplies and/or materials. Subcontractors may be required to provide a bond and must have a valid contractor?s license and current insurance coverage that meets ACC and project requirements. Selected subcontractors will be required to sign our standard subcontractor agreement. Please fax quotes no later than 10:00am on bid day. If you have any questions, please contact the project estimator. Plans and Specifications may be viewed at our Benicia office. Quotes must include inclusions and exclusions, and must be valid for a minimum of 60 days following the bid date. ACC is an equal opportunity employer.
Date posted: 01/17/2018
Contractor: SEMA Construction, Inc. Contact: Eric Stepien
Address: 320 Goddard Way, Ste. 150 Irvine, CA 92618
Phone: 949-470-0500 Fax: 949-788-9200 Email: estimating.ca@semaconstruction.com
Services needed: SEMA construction is looking for DBE subcontractors and suppliers in the areas of: LEAD COMPLIANCE PLAN, PROGRESS SCHEDULE (CRITICAL PATH METHOND), TIME-RELATED OVERHEAD (WDAY), DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, RETROREFLECTIVE SHEETING (TYPE XI) FOR CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, FLASHING BEACON (PORTABLE), PORTABLE CHANGEABLE MESSAGE SIGN (EA), JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, STORM WATER ANNUAL REPORT, MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL), TEMPORARY COVER, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY CONSTRUCTION ENTRANCE, STREET SWEEPING, TEMPORARY CNCRETE WASHOUT, TREATED WOOD WASTE, CONTRACTOR-SUPPLIED BIOLOGIST (LS), NATURAL RESOURCE PROTECTION PLAN, TEMPORARY HIGH-VISIBILITY FENCE, CLEARING AND GRUBBING (LS), DUST PALLIATIVE, ROADWAY EXCAVATION, IMPORTED BORROW (CY), SOIL AMENDMENT, PLANT (GROUP A), PLANT ESTABLISHMENT WORK, MOVE-IN/MOVE-OUT (EROSION CONTROL), DUFF (ACRE), BONDED FIBER MATRIX (SQFT), FIBER ROLLS, COMPOST (CY), INCORPORATE MATERIALS, CLASS 2 AGGREGATE BASE (CY), MINOR HOT MIX ASPHALT, PLACE HOT MIX ASPHALT DIKE (TYPE C), PLACE HOT MIX ASPHALT DIKE (TYPE E), PLACE HOT MIX ASPHALT DIKE (TYPE F), PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA), REMOVE ASPHALT CONCRETE DIKE, STRUCTURAL CONCRETE, BOX CULVERT, STRUCTURAL CONCRETE, HEADWALL, BAR REINFORCING STEEL, 24? CORRUGATED STEEL PIPE (.064? THICK), 30? CORRUGATED STEEL PIPE (.064? THICK), 30? CORRUGATED STEEL PIPE (.079? THICK), 36? CORRUGATED STEEL PIPE (.064? THICK), 36? CORRUGATED STEEL PIPE (.079? THICK), 42" CORRUGATED STEEL PIPE (.064" THICK), 42" CORRUGATED STEEL PIPE (.109" THICK), 48" CORRUGATED STEEL PIPE (.064" THICK), 48" CORRUGATED STEEL PIPE (.109" THICK), 54" CORRUGATED STEEL PIPE (.079" THICK), 54" CORRUGATED STEEL PIPE (.109" THICK), 60" CORRUGATED STEEL PIPE (.138" THICK), 66" CORRUGATED STEEL PIPE (.138" THICK), 72" CORRUGATED STEEL PIPE (.138" THICK), 78" CORRUGATED STEEL PIPE (.138" THICK), 84" CORRUGATED STEEL PIPE (.138" THICK), 102" CORRUGATED STEEL PIPE (.168" THICK), 108" CORRUGATED STEEL PIPE (.168" THICK), 36" BITUMINOUS COATED CORRUGATED STEEL PIPE (.079? THICK), 48" BITUMINOUS COATED CORRUGATED STEEL PIPE (.109" THICK), 42" X 29" CORRUGATED STEEL PIPE ARCH (.079" THICK), 49" X 33" CORRUGATED STEEL PIPE ARCH (.109" THICK), 57" X 38" CORRUGATED STEEL PIPE ARCH (.109" THICK), 64" X 43" CORRUGATED STEEL PIPE ARCH (.109" THICK), 71" X 47" CORRUGATED STEEL PIPE ARCH (.138" THICK), 83" X 57" CORRUGATED STEEL PIPE ARCH (.138" THICK), 7'-11" X 5'-7" STRUCTURAL STEEL PLATE PIPE ARCH (.138" THICK), 8'-2" X 5'-9" STRUCTURAL STEEL PLATE PIPE ARCH (.138" THICK), 10'-3" X 6'-9" STRUCTURAL STEEL PLATE PIPE ARCH (.138" THICK), 11'-5" X 7'-3" STRUCTURAL STEEL PLATE PIPE ARCH (.138" THICK), 12'-6" X 7'-11" STRUCTURAL STEEL PLATE PIPE ARCH (.138" THICK), 36" CORRUGATED STEEL PIPE INLET (.079" THICK), 36" CORRUGATED STEEL PIPE RISER (.109" THICK), 24? STEEL FLARED END SECTION, 30? STEEL FLARED END SECTION, 36? STEEL FLARED END SECTION, 42? STEEL FLARED END SECTION, 48? STEEL FLARED END SECTION, 54? STEEL FLARED END SECTION, 60? STEEL FLARED END SECTION, 42" X 29" STEEL FLARED END PIPE ARCH SECTION, 49? X 33? STEEL FLARED END PIPE ARCH SECTION, 57? X 38? STEEL FLARED END PIPE ARCH SECTION, 64? X 43? STEEL FLARED END PIPE ARCH SECTION, 83? X 57? STEEL FLARED END PIPE ARCH SECTION, REMOVE HEADWALL, REMOVE ASPHALT CONCRETE OVERSIDE DRAIN, REMOVE FLARED END SECTION (EA), CAP RISER, ROCK SLOPE PORTECTION (1/4 T, METHOD B) (CY), ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY), ROCK SLOPE PROTECTION (FACING, METHOD B) (CY), ROCK SLOPE PROTECTION (1T, METHOD B), ROCK SLOPE PROTECTION (1 ? T, METHOD B) (CY), ROCK SLOPE PROTECTION FABRIC (CLASS 8), MISCELLANEOUS IRON AND STEEL, SURVEY MONUMENT (TYPE D), FENCE (TYPE BW, 5-STRAND, METAL POST), REMOVE FENCE, TEMPORARY DESERT TORTOISE FENCE, DELINEATOR (SPECIAL), GUARD RAILING DELINEATOR, MARKER (CULVERT), RESET ROADSIDE SIGN, MIDWEST GUARDRAIL SYSTEM (WOOD POST), VEGETATION CONTROL (MINOR CONCRETE), CABLE RAILING, CONNECT GUARD RAILING TO STRUCTURE, TRANSITION RAILING (TYPE WB-31), END ANCHOR ASSEMBLY (TYPE SFT), SORTSTOP TERMINAL SYSTEMS, REMOVE GUARDRAIL, MOBILIZATION,
Requirements: SEMA Construction is an equal opportunity employer; we seek quotes from all minority businesses. Please encourage lower tier DBE suppliers to provide quotes. Per current state regulations, please provide a current DIR number and expiration date with your quote. Please contact us if you need assistance in obtaining bonding, lines of credit, insurance, necessary equipment, supplies, materials, or related services. You can visit our website at www.semaconstruction.com or contact us at the phone number listed above
Date posted: 01/30/2018
Contractor: Apply-A-Line, LLC Contact: Carrie
Address: 19652 Hirsch Court Anderson, CA 96007
Phone: 530-365-4000 Fax: 530-365-4060 Email: carrie@applyaline.com
Services needed: Water Pollution Control Plan / Site Management Traffic Control Services
Requirements:
Date posted: 01/18/2018
Contractor: Granite Construction Company Contact: Steve DeBlasio
Address: 4001 Bradshaw Avenue Sacramento, CA 95827
Phone: 916-855-4409 Fax: 916-369-0429 Email: steven.deblasio@gcinc.com
Services needed: Granite Construction Company (Granite) An Equal Opportunity Business Employer is requesting quotes from all qualified subcontractors and suppliers including certified DVBE firms for the following, but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign, Water Pollution Control Program, Temporary Drainage Inlet Protection, Treated Wood Waste, Shoulder Backing, Asphaltic Emulsion (Fog Seal Coat), Tack Coat, Prepaving Inertial Profiler, Prepaving Grinding Day, Hot Mix Asphalt (Type A), Minor HMA, Data Core, HMA Dike, Cold Plane AC Pavement, Remove AC Dike, Delineator (Class 2), Milepost Marker, Object Marker (Type L-1), Midwest Guard System, Transition Railing, Softstop Terminal System, Alternative Flared Terminal System, Remove / Adjust Guardrail, Methyl Methacrylate Traffic Stripe /Pavement Marking, Rumble Strip, Modify Existing Electrical System, HMA Oil, Trucking, Sweeper
Requirements: Granite will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Quotations will be broken down into comparable packages as reasonably necessary to increase overall DBE participation. Plans and specifications are available through the contracting agency website. (Viewing only capability available at our Bradshaw location) Requirements: Granite is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. 100% performance and payment bonds may be required for the full amount of subcontract price. Granite will pay for bond premium up to 2%. This will be a prevailing wage job. Subcontractors must possess a current contractor?s license, DIR registration number, insurance and worker?s compensation coverage meeting Granite?s requirements and will be required to sign the standard Granite Subcontract Agreement. A copy of the insurance requirements and agreement can be obtained by contacting the estimator. Granite intends to work cooperatively with all qualified firms seeking work on this project. If assistance is needed in obtaining bonds, lines of credit, insurance, necessary equipment, materials, supplies or any other related services we encourage you to contact the Estimator, the local Small Business Development Center Network (www.californiasbdc.org) and/or the Minority Business Development Center (www.mbda.gov). Department of Industrial Relations (DIR) Number and Current License Number MUST BE ON QUOTE Scopes are required 24 hours prior to bid and Quotes required by 11:00AM on bid day
Date posted: 01/19/2018
Contractor: Ghilotti Bros., Inc. Contact: Rich Wilkerson, Senior Estimator
Address: 525 Jacoby St. San Rafael, CA 94901
Phone: 415-454-7011 Fax: 415-454-8376 Email: richw@ghilottibros.com
Services needed: Ghilotti Bros., Inc. seeks quotes from certified DBE Subcontractors, Suppliers, and Truckers for the following categories of work: C1200-Construction Area Signs, C1531-Plane Asphalt Concrete, C1601-Clearing & Grubbing, C2000-Highway Planting, C2030-Erosion Control, C2065-Irrigation System, C2066-Temporary Erosion Control, C2800-Concrete Base, C3940-Place Asphalt Concrete Dike & Misc., C4602-Ground Anchor, C5100-Concrete Structure, C5105-Minor Concrete Structure, C5201-Reinforcing Steel, C5301-Air-Blown Mortar, C5601-Sign Structure, C5620-Roadside Sign, C8000-Fencing, C8320-Metal Beam Guard Railing, C8331-Concrete Barrier (Permanent), C8391-Metal Beam Barrier, C8405-Thermoplastic Traffic Striping & Marking, C8406-Painted Traffic Striping & Marking, C8601-Maintaining Existing Traffic Management System Elements During Construction, C8602-Signal & Lighting, C8604-Lighting, C8611-Ramp Metering System, C9602-Bottom Dump Truck, C9604-Super 10 Dump Truck, C9607-End Dump Truck, C9608-Asphalt Oil Tankers. Other subcontract trades and suppliers are strongly encouraged to contact us for opportunities. PLEASE FAX YOUR QUOTES TO: 415-454-8376 SUBMIT A COPY OF YOUR CURRENT CERTIFICATION WITH YOUR BID. We work with interested subcontractors to identify opportunities, breaking items down into economically feasible units. Estimator Rich Wilkerson (RichW@ghilottibros.com 415-454-7011) will answer questions and provide clarification regarding the scope of work, plans, specs, requirements, bid preparation or any other technical assistance. Send us a quick email to get a link to the Plans & Specs! Non-DBE Subs/Suppliers: You are encouraged to carry a proportionate percentage of 2nd-tier DBE participation with your quote and this participation will be evaluated with your price.
Requirements: NOTE: Contractors License Number, DIR Registration Number and Caltrans DBE Number (or other agency) must be listed on any quote submitted to GBI. 100% Payment and Performance Bonds as well as Insurance Waiver of subrogation are required of subcontractors. Ghilotti Bros. intends to work cooperatively with all qualified firms seeking work on this project. Certified DBE's please contact us if you need help obtaining bonding, insurance, lines of credit, equipment, materials, supplies or some other form of assistance in order to participate. Subcontractors must possess a current contractor's license, insurance and worker's compensation coverage and will be required to enter into our standard contract. Please note that this is a prevailing wage project and Ghilotti Bros. is Union signatory. Subcontractors will be subject to the terms and conditions of Ghilotti Bros. subcontract and safety documents which are available upon request. Ghilotti Bros., Inc. is an Equal Opportunity Employer and actively hires U.S. Veterans.
Date posted: 01/19/2018
Contractor: Peterson Chase General Engineering Construction Inc. Contact: Kali Goglanian
Address: 16351 Construction Circle West Irvine, CA 92606
Phone: 949-252-0441 Fax: 949-252-0266 Email: bids@petersonchase.com
Services needed: Peterson-Chase General Engineering Construction, Inc. is requesting quotes from all qualified subcontractors and suppliers including certified DVBE firms for the following items of work, including but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign (Ls), Job Site Management, Prepare Water Pollution Control Program, Temporary Concrete Washout, Hot Mix Asphalt (Type A), Tack Coat, Cold Plane Asphalt Concrete Pavement, Grind Existing Bridge Deck, Structural Concrete, Bridge (Rsc), Aggregate Base (Approach Slab), Structural Concrete, Approach Slab (Type R Modified), Clean Expansion Joint, Joint Seal (Mr 1/2"), Joint Seal (Mr 1"), Joint Seal (Mr 1 1/2"), Bar Reinforcing Steel (Bridge), Public Safety Plan, Rapid Setting Concrete (Patch), Remove Unsound Concrete, Prepare Concrete Bridge Deck Surface, High Friction Surface Treatment (Bridge), Furnish Polyester Concrete Overlay, Place Polyester Concrete Overlay, Remove Chip Seal, Replace Access Door, Bridge Removal (Portion), Remove Pavement Marker, Pavement Marker (Retroreflective), Remove Thermoplastic Traffic Stripe, 6" Traffic Stripe (Warranty), 6" Traffic Stripe (Warranty) (Broken 36-12), 8" Traffic Stripe (Warranty) (Broken 12-3), Maintaining Existing Traffic Management System Elements During Construction. Please email your quotes to Bids@petersonchase.com
Requirements: Peterson-Chase General Engineering Construction Inc. can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Dick Vogels at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Caltrans? requirements and will be required to sign the standard Peterson-Chase GEC., Inc. Subcontract Agreement. Plans and specifications are available to be viewed in our office located at 16351 Construction Circle West, Irvine, CA 92606, between 8:00 AM and 3:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Peterson-Chase GEC., Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. Peterson Chase General Engineering Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.
Date posted: 01/22/2018
Contractor: Peterson Chase General Engineering Construction Inc. Contact: Kali Goglanian
Address: 16351 Construction Circle West Irvine, CA 92606
Phone: 949-252-0441 Fax: 949-252-0266 Email: bids@petersonchase.com
Services needed: Peterson-Chase General Engineering Construction, Inc. is requesting quotes from all qualified subcontractors and suppliers including certified DVBE firms for the following items of work, including but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign (Ls), Job Site Management, Prepare Water Pollution Control Program, Temporary Concrete Washout, Hot Mix Asphalt (Type A), Tack Coat, Cold Plane Asphalt Concrete Pavement, Grind Existing Bridge Deck, Structural Concrete, Bridge (Rsc), Structural Concrete, Approach Slab (Type R), Paving Notch Extension, Clean Expansion Joint, Joint Seal (Mr 1/2"), Joint Seal (Mr 1 1/2"), Bonded Joint Seal (Mr 1"), Bonded Joint Seal (Mr 1 1/2"), Bonded Joint Seal (Mr 2"), Bar Reinforcing Steel (Bridge), Rapid Setting Concrete (Patch), Remove Asphalt Concrete Surfacing, Remove Unsound Concrete, Polyester Concrete Expansion Dam, Prepare Concrete Bridge Deck Surface, Furnish Polyester Concrete Overlay, Place Polyester Concrete Overlay, Remove Chip Seal, Bridge Removal (Portion), Remove Pavement Marker, Pavement Marker (Retroreflective), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 36-12), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), 12" Rumble Strip (Asphalt Concrete Pavement), Maintaining Existing Traffic Management System Elements During Construction. Please email your quotes to Bids@petersonchase.com
Requirements: Peterson-Chase General Engineering Construction Inc. can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Dick Vogels at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Caltrans? requirements and will be required to sign the standard Peterson-Chase GEC., Inc. Subcontract Agreement. Plans and specifications are available to be viewed in our office located at 16351 Construction Circle West, Irvine, CA 92606, between 8:00 AM and 3:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Peterson-Chase GEC., Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. Peterson Chase General Engineering Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.
Date posted: 01/22/2018
Contractor: American Civil Constructors West Coast LLC Contact: Estimating
Address: 2990 Bay Vista Court Benicia CA 94510
Phone: 707-746-8028 Fax: 707-747-0593 Email: estimatingwc@accbuilt.com
Services needed: ACC West Coast would like to encourage all DVBE and Small Business companies whom are classified to perform any of the scopes of work relevant to this project to submit quotes. We are currently requesting quotes for all scopes of work and bid items related to this project. Please see the list of bid items associated with this project for more information. Other items of work in which quotes are greatly desired: Construction Rentals, Misc. Construction Supplies, Flat-Bed and End Dump Hourly Trucking Rates. We will also consider subcontracting other scopes of work offered by interested companies.
Requirements: ACC will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Please call to discuss how ACC West Coast can assist you in your bonding, credit and/or insurance needs. Assistance may include, but is not limited to: Contacting bonding and/or insurance companies on your behalf, arranging with sureties incremental or phased bonding, obtaining necessary equipment, supplies and/or materials. Subcontractors may be required to provide a bond and must have a valid contractor?s license and current insurance coverage that meets ACC and project requirements. Selected subcontractors will be required to sign our standard subcontractor agreement. Please fax quotes no later than 10:00am on bid day. If you have any questions, please contact the project estimator. Plans and Specifications may be viewed at our Benicia office. Quotes must include inclusions and exclusions, and must be valid for a minimum of 60 days following the bid date. ACC is an equal opportunity employer.
Date posted: 01/22/2018
Contractor: American Civil Constructors West Coast LLC Contact: Estimating
Address: 2990 Bay Vista Court Benicia CA 94510
Phone: 707-746-8028 Fax: 707-747-0593 Email: estimatingwc@accbuilt.com
Services needed: ACC West Coast would like to encourage all DVBE and Small Business companies whom are classified to perform any of the scopes of work relevant to this project to submit quotes. We are currently requesting quotes for all scopes of work and bid items related to this project. Please see the list of bid items associated with this project for more information. Other items of work in which quotes are greatly desired: Construction Rentals, Misc. Construction Supplies, Flat-Bed and End Dump Hourly Trucking Rates. We will also consider subcontracting other scopes of work offered by interested companies.
Requirements: ACC will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Please call to discuss how ACC West Coast can assist you in your bonding, credit and/or insurance needs. Assistance may include, but is not limited to: Contacting bonding and/or insurance companies on your behalf, arranging with sureties incremental or phased bonding, obtaining necessary equipment, supplies and/or materials. Subcontractors may be required to provide a bond and must have a valid contractor?s license and current insurance coverage that meets ACC and project requirements. Selected subcontractors will be required to sign our standard subcontractor agreement. Please fax quotes no later than 10:00am on bid day. If you have any questions, please contact the project estimator. Plans and Specifications may be viewed at our Benicia office. Quotes must include inclusions and exclusions, and must be valid for a minimum of 60 days following the bid date. ACC is an equal opportunity employer.
Date posted: 01/22/2018
Contractor: CT&T Concrete Paving, Inc. Contact: Richard Ramos
Address: 324 S. Diamond Bar Bl., PMB275 Diamond Bar, CA 91765
Phone: 909-629-8000 Fax: 909-629-8001 Email: richard@cttconstruction.com
Services needed: CT&T Concrete Paving, Inc. would like to invite you to bid on the Caltrans Project No. 08-OL7104 We welcome the participation of all Local Construction Firms, residence, and suppliers that are DVBE or DBE certified as well as Section 3 certified that would be able to assist with the following construction services / trades: Electrical , Traffic Control, Pavement Markings, Surveyor, WPPP, Traffic Signs. CT&T Concrete Paving, Inc. is an Equal Employment Opportunity Corporation which is also accepting proposals from non-Local , non-section 3 and non-SBE/DBE Contractors / Suppliers and Residence regardless of race, color, creed, sex, or national origin.
Requirements: Active D.I.R. , CSLB , Insurance & Bonded
Date posted: 01/22/2018
Contractor: Telfer Pavement Technologies, LLC Contact: Rick Arias
Address: 4522 Parker Avenue Suite 350 McClellan, CA. 95652
Phone: 916-383-1756 Fax: 916-383-4084 Email: estimating@telferpavements.com
Services needed: Telfer Pavement Technologies, LLC is seeking quotes from Qualified DVBE subcontractors and suppliers for work including but not limited to: Materials supply/delivery, Trucking, Lead Compliance Plan, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign, Job Site Management, Prepare Water Pollution Control Program, Prepaving Inertial Profiler, Data Core, Cold Plane Asphalt Concrete, Pavement Marker (Retro Reflective-Recessed), 6" Two-Component Paint Traffic Stripe, Identify opportunities to break down items into economically feasible packages. All Supplier and Subcontractor proposals shall be in strict accordance with said project plans, specifications, and any addenda issued.
Requirements: DVBE Subcontractors must possess a current contractor?s license, worker's compensation insurance coverage during the entire length of the contract. Performance and Payment bonds may be required. Plans and specification can be obtained from Cal Trans, your local plan room, or may be viewed through our office. You can contact our office if you need assistance in bonding, lines of credit, insurance, necessary equipment, supplies, materials or services required for this job.
Date posted: 01/22/2018
Contractor: Hat Creek Construction & Materials, Inc Contact: Amber DeMarco
Address: 24339 Hwy 89 Burney, CA 96013
Phone: 530-335-5501 Fax: 530-335-5510 Email: amber@hatcreekconstruction.com
Services needed: Hat Creek Construction & Materials, Inc. is requesting quotes from qualified DVBE/DBE/UDBE/SBE subcontractors and suppliers for the following bid items for this project: LEAD COMPLIANCE PLAN 2 PROGRESS SCHEDULE (CRITICAL PATH METHOD) 3 TIME-RELATED OVERHEAD (LS) 4 CONSTRUCTION AREA SIGNS 5 TRAFFIC CONTROL SYSTEM 6 TEMPORARY PEDESTRIAN ACCESS ROUTE 7 PORTABLE CHANGEABLE MESSAGE SIGN (LS) 8 JOB SITE MANAGEMENT 9 PREPARE SWPPP 10 RAIN EVENT ACTION PLAN 11 STORM WATER SAMPLING AND ANALYSIS DAY 12 STORM WATER ANNUAL REPORT 13 MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) 14 TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX) 15 TEMPORARY COVER 16 TEMPORARY DRAINAGE INLET PROTECTION 17 TEMPORARY FIBER ROLL 18 TEMPORARY CONCRETE WASHOUT 19 TREATED WOOD WASTE 20 REMOVE CONCRETE (CY) 21 ROADWAY EXCAVATION 22 ROCK BLANKET 23 WOOD MULCH 24 CLASS 2 AGGREGATE BASE (CY) 25 PREPAVING INERTIAL PROFILER 26 HOT MIX ASPHALT (TYPE A) 27 DATA CORE 28 PLACE HOT MIX ASPHALT DIKE (TYPE C) 29 PLACE HOT MIX ASPHALT DIKE (TYPE E) 30 PLACE HOT MIX ASPHALT DIKE (TYPE F) 31 TACK COAT 32 REMOVE ASPHALT CONCRETE DIKE 33 COLD PLANE ASPHALT CONCRETE PAVEMENT 34(F) STRUCTURAL CONCRETE, DRAINAGE INLET 35(F) MINOR CONCRETE (MINOR STRUCTURE) 36 REMOVE RETAINING WALL (LF) 37 18" ALTERNATIVE PIPE CULVERT 38 24" ALTERNATIVE PIPE CULVERT 39 30" ALTERNATIVE PIPE CULVERT 40(F) CLASS 1 PERMEABLE MATERIAL (BLANKET) 41 24" ALTERNATIVE PIPE DOWNDRAIN 42 DRAINAGE INLET MARKER 43 18" ALTERNATIVE FLARED END SECTION 44 24" ALTERNATIVE FLARED END SECTION 45 30" ALTERNATIVE FLARED END SECTION 46 ABANDON CULVERT (LF) 47 REMOVE CULVERT (LF) 48 REMOVE INLET 49 REMOVE MANHOLE 50 REMOVE FLARED END SECTION (EA) 51 ADJUST MANHOLE TO GRADE 52 ADJUST UTILITY COVER TO GRADE 53 MODIFY DRAINAGE FACILITY 54 SAND BACKFILL 55 ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (CY) 56 ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) 57 ROCK SLOPE PROTECTION FABRIC (CLASS 8) 58 MINOR CONCRETE (CURB) (LF) 59 MINOR CONCRETE (GUTTER) (CY) 60 DETECTABLE WARNING SURFACE 61 MINOR CONCRETE (CURB AND GUTTER) 62 MINOR CONCRETE (ISLAND PAVING) 63 MINOR CONCRETE (DRIVEWAY) 64 MINOR CONCRETE (SIDEWALK) 65 MINOR CONCRETE (CURB RAMP) 66 REMOVE CONCRETE SIDEWALK (SQYD) 67 REMOVE CONCRETE (CURB AND GUTTER) 68 PRE/POST CONSTRUCTION SURVEYS 69(F) MISCELLANEOUS IRON AND STEEL 70 MANHOLE FRAME AND COVER 71 PAVEMENT MARKER (RETROREFLECTIVE-RECESSED) 72 OBJECT MARKER (TYPE L-1) 73 REMOVE ROADSIDE SIGN 74 RESET ROADSIDE SIGN 75 RELOCATE ROADSIDE SIGN 76 FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED) 77 FURNISH SINGLE SHEET ALUMINUM SIGN (0.063" - UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 78 RETROREFLECTIVE SHEETING (TYPE XI) 79 ROADSIDE SIGN - ONE POST 80 INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD) 81 INSTALL SIGN (MAST-ARM HANGER METHOD) 82 MIDWEST GUARDRAIL SYSTEM (STEEL POST) 83 VEGETATION CONTROL (MINOR CONCRETE) 84(F) TUBULAR HANDRAILING (MODIFIED) 85 SINGLE THRIE BEAM BARRIER (WOOD POST) 86 TRANSITION RAILING (TYPE WB-31) 87 END CAP (TYPE TC) 88 END ANCHOR ASSEMBLY (TYPE SFT) 89 ALTERNATIVE IN-LINE TERMINAL SYSTEM 90 ALTERNATIVE FLARED TERMINAL SYSTEM 91 REMOVE GUARDRAIL 92 THERMOPLASTIC PAVEMENT MARKING 93 THERMOPLASTIC TRAFFIC STRIPE (SPRAYABLE) 94 MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION 95 MODIFYING EXISTING ELECTRICAL SYSTEM 96 MOBILIZATION. plans and specifications can be obtained from the Caltrans website http://www.dot.ca.gov/hq/esc/oe/weekly_ads/index.php
Requirements: Subcontractors must possess current contractor?s license, insurance and workers compensation meeting Hat Creek Construction?s requirements. Payment and performance bonds may be required. Subcontractors will be subject to the terms and conditions of Hat Creek?s subcontract agreement and safety standards. If you need assistance in obtaining bonds, insurance, equipment, materials and/or supplies please contact our office or visit our website www.hatcreekconstruction.com for more information. Hat Creek Construction & Materials, Inc. is an equal opportunity employer and intends to work cooperatively with all qualified firms seeking work on this project.
Date posted: 01/22/2018
Contractor: Wylatti Resource Management Inc. Contact: Mel Goodwin
Address: 23601 cemetery lane Covelo,CA 95428
Phone: 707-489-6966 Fax: 707-983-8184 Email: melgoodwin@comcast.net
Services needed: Wylatti Resource Management, Inc. an equal opportunity employer, is requesting qualified minority DBE subcontractors and suppliers to submit bids for your trade specialty for the project listed below. Your firm must be currently certified as a DBE firm with an agency acceptable to Caltrans. Wylatti Resource Management is requesting quotes from all Minority and Non-Minority Subcontractors and Suppliers including, but not limited to Construction area signs, lead compliance plan, WPCP, temporary items- drainage inlet protection,, pavement marking and traffic stripe-paint, alternative crash cushion, minor concrete (minor structure, backfill, curb, curb & gutter, sidewalk, and driveway, misc. construction, backfill, bar reinforcing steel, vegetation control), miscellaneous iron & steel, portable changeable message sign, rain event action plan, storm water sampling and analysis, storm water annual report,structure backfill (soil nail wall) wood mulch, fiber rolls, straw, hydroseed, compost,rolled erosion control product (Blanket), AC dike, cold plane asphalt concrete, sculpted shotcrete, structural shotcrete, 10? flume down drain, inlet and anchor assy., drainage inlet marker, adjust manholes and utilities to grade, rock slope protection rock and fabric, prepare and stain shotcrete, pavement markers (retroreflective) , remove and relocate roadside signs, midwest guardrail system and flared terminal system, soft stop terminal system, cable railing, concrete barrier (Type 60D), modify existing electrical system.
Requirements: Bids may be faxed to the number listed below. Please make sure that prior to bid time your quotation is received by our company.
Date posted: 01/23/2018
Contractor: Wylatti Resource Management Inc. Contact: Mel Goodwin
Address: 23601 cemetery lane Covelo,CA 95428
Phone: 707-489-6966 Fax: 707-983-8184 Email: melgoodwin@comcast.net
Services needed: Wylatti Resource Management, Inc. an equal opportunity employer, is requesting qualified minority DBE subcontractors and suppliers to submit bids for your trade specialty for the project listed below. Your firm must be currently certified as a DBE firm with an agency acceptable to Caltrans. Wylatti Resource Management is requesting quotes from all Minority and Non-Minority Subcontractors and Suppliers including, but not limited to Construction area signs, lead compliance plan, WPCP, erosion control move-in/move-outs, bonded fiber matrix, check dam, gravel bag berm, construction entrance, pedestrian access route, pavement marking and traffic stripe-paint, alternative crash cushion, k-railing, erosion control blanket, fiber roll, high visibility fence, two component paint striping and green pavement marking installation, 6? & 8? thermoplastic striping and pavement marking installation and removal, structural concrete (drainage inlet and headwall), alternative pipe suppliers, detectable warning surface, minor concrete (minor structure, backfill, curb, curb & gutter, sidewalk and driveway, misc. construction, backfill, bar reinforcing steel, vegetation control), miscellaneous iron & steel, portable changeable message sign, rain event action plan, storm water sampling and analysis, storm water annual report, concrete demolition, structure backfill (soil nail wall) wood mulch, fiber rolls, straw, hydroseed, compost, rolled erosion control product (Blanket), AC dike, cold plane asphalt concrete, sculpted shotcrete, structural shotcrete, 10? flume down drain, inlet and anchor assy., drainage inlet marker, adjust manholes and utilities to grade, rock slope protection rock and fabric, prepare and stain shotcrete, pavement markers (retroreflective), remove and relocate roadside signs, midwest guardrail system and flared terminal system, soft stop terminal system, cable railing, concrete barrier (Type 60D), modify existing electrical system.
Requirements: : Bids may be faxed to the number listed below. Please make sure that prior to bid time your quotation is received by our company. Fax 707-983-8184
Date posted: 01/23/2018
Contractor: Chrisp Company Contact: Aaron Patton
Address: 43650 Osgood Road Fremont, Ca. 94539
Phone: 510-656-2840 Fax: 510-656-2397 Email: apatton@chrispco.com
Services needed: Chrisp Company is requesting quotes from all qualified subcontractors and suppliers including certified DVBE Firms for the following items of work, including but not limited to the following: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL, PORTABLE CMS, JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM and MATERIAL SUPPLIES. Subcontractors are required to meet insurance and labor requirements. Subcontractors may be required to provide 100% Payment and Performance Bonds. Please contact us for assistance. FIRMS must include copy of business license with quote. Quotes are required to be in accordance with the plans and specifications and good for the contract duration as specified in the bid documents. We intend to help and work with all qualified firms seeking participation on this project. Feel free to call our office with any questions you may have. DO NOT EMAIL QUOTES. PLEASE FAX TO 510.656.2397. QUOTES MUST BE FAXED AT LEAST 2 HOURS BEFORE BID DUE TIME.
Requirements: To view or obtain plans, specs, and project document, FIRMS should contact the CONTRACTOR to get required project resource. - The CONTRACTOR will provide FIRMS, if requested, with required assistance in bonding, insurance. -Quotes per project bid items must be submitted before the due bid date and time to allow proper evaluation. -Quotes are required to be in accordance with project plans, specs, and good for the entire contract duration. - The project is a prevailing wage public job. The FIRM's quote must consider all terms related to prevailing wages terms. - FIRMS must possess and maintain a current contractor license, insurance, and worker compensation coverage during the project -100% payment bond and performance bond for the full amount of the subcontract price may be required. -FIRMS that submit their quote explicitly acknowledge and agree to all above terms and responsibilities. - We are an equal opportunity employer. We do not discriminate against any qualified contractors, subcontractors, suppliers -The firm must be registered with Department of Industrial Relation and should have a current DIR number.
Date posted: 01/23/2018
Contractor: Chrisp Company Contact: Aaron Patton
Address: 43650 Osgood Road Fremont, Ca. 94539
Phone: 510-656-2840 Fax: 510-656-2397 Email: apatton@chrispco.com
Services needed: Chrisp Company is requesting quotes from all qualified subcontractors and suppliers including certified DVBE Firms for the following items of work, including but not limited to the following: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL, PORTABLE CMS, JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM and MATERIAL SUPPLIES. Subcontractors are required to meet insurance and labor requirements. Subcontractors may be required to provide 100% Payment and Performance Bonds. Please contact us for assistance. FIRMS must include copy of business license with quote. Quotes are required to be in accordance with the plans and specifications and good for the contract duration as specified in the bid documents. We intend to help and work with all qualified firms seeking participation on this project. Feel free to call our office with any questions you may have. DO NOT EMAIL QUOTES. PLEASE FAX TO 510.656.2397. QUOTES MUST BE FAXED AT LEAST 2 HOURS BEFORE BID DUE TIME.
Requirements: To view or obtain plans, specs, and project document, FIRMS should contact the CONTRACTOR to get required project resource. - The CONTRACTOR will provide FIRMS, if requested, with required assistance in bonding, insurance. -Quotes per project bid items must be submitted before the due bid date and time to allow proper evaluation. -Quotes are required to be in accordance with project plans, specs, and good for the entire contract duration. - The project is a prevailing wage public job. The FIRM's quote must consider all terms related to prevailing wages terms. - FIRMS must possess and maintain a current contractor license, insurance, and worker compensation coverage during the project -100% payment bond and performance bond for the full amount of the subcontract price may be required. -FIRMS that submit their quote explicitly acknowledge and agree to all above terms and responsibilities. - We are an equal opportunity employer. We do not discriminate against any qualified contractors, subcontractors, suppliers -The firm must be registered with Department of Industrial Relation and should have a current DIR number.
Date posted: 01/23/2018
Contractor: WABO Landscape & Construction, Inc. Contact: Tamara Damian
Address: WABO Landscape & Construction 726 Alfred Nobel Dr. Hercules CA 94547
Phone: 510-741-9226 Fax: 510-724-2391 Email: bids@wabo.com
Services needed: WABO Landscape & Construction, Inc. is seeking quotes from qualified subcontractors and service providers, particularly those who are Certified DBEs for work on this project, including, but not limited to the work associated with the following bid items: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign, Job Site Management, Prepare Storm Water Pollution Prevention Plan, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Construction Entrance, Street Sweeping, Temporary Concrete Washout, Roadway Excavation, Structure Excavation (Retaining Wall), Structure Backfill (Retaining Wall), Roadside Clearing, Plant Matls, Plant Establishment Work, Gravel Mulch, Wood Mulch, Edging, Irrigation Matls, Hydromulch, Straw, Hydroseed, Class 2 Aggregate Base, Structural Concrete Retaining Wall, Architectural Treatment, Bar Reinforcing Steel (Retaining Wall), Asphalt Membrane Waterproofing, Geocomposite Drain, Minor Concrete, Miscellaneous Metal (Retaining Wall), Maintaining Existing Traffic Management System Elements During Construction and Electric Service For Irrigation.
Requirements: WABO also requests quotes from vendors, particularly vendors who are Certified DBEs and are either manufacturers or regular dealers as defined by 49 CFR 26.55, for all materials and supplies for this project. WABO will consider quotes for any work on this project, including work we traditionally perform with our own forces, to insure DBE participation. WABO will work cooperatively with all qualified firms interested in bidding this project. We are willing to break bid items down into economically feasible units where feasible. Contact us to do so, or if you have any questions related to this project or wish to discuss the plans, specifications or requirements of the contract. Please contact us if you need help in obtaining bonding, insurance, lines of credit, equipment, materials, supplies or some other form of assistance in order to participate. Subcontractors will be required to meet our insurance requirements and bonds may be required. WABO is signatory with the Laborers, Operators and Plumbers Unions. WABO Landscape & Construction, Inc. is an Equal Opportunity Employer. Please submit quotes no later than 10 AM on bid day and be sure to include your contact information and state your status as a Certified DBE if applicable.
Date posted: 01/23/2018
Contractor: GRANITE ROCK COMPANY Contact: Vicki Narciso
Address: 5225 Hellyer Avenue, Suite 220 San Jose, CA 95138
Phone: 408-574-1400 Fax: 408-365-9548 Email: estimating@graniterock.com
Services needed: Certified DBE firms are encouraged to provide a quote to Graniterock for all items of work listed on the bid list, particularly these: Lead Compliance Plan, Construction Area Signs, Traffic Control, PCMS, Prepare Water Pollution Control Program, Shoulder Backing, Lean Concrete Base Rapid Setting, Fog Seal, Inertial Profiler, Data Core, AC Dike, Tack Coat, Cold Plane AC, Precast Slab Replacement, Remove Concrete Pavement and Base, Grind PCC Pavement, Drill & Bond Dowel, Joint Seal, Furnish Polyester Concrete Overlay, Place Polyester Concrete Overlay, Striping & Markers, Rumble Strip, Modify Existing Electrical System, & Trucking.
Requirements: Granite Rock Company 'Graniterock' is signatory to Operating Engineers, Laborers, Teamsters, Carpenters and Cement Masons unions. 100% performance and payment bonds will be required from a qualified surety company for the full amount of the subcontract price. Bonding assistance is available. Graniterock will pay bond premium up to 1.5%. In addition to bonding assistance, subcontractors are encouraged to contact Graniterock Estimating with questions regarding obtaining lines of credit, insurance, equipment, materials and/or supplies, or with any questions you may have. Plans and specifications can be downloaded on-line with Caltrans, or at our offices, but please contact our estimating office for assistance. Subcontractors must possess a current contractor's license, DIR number, insurance and worker's compensation coverage. Subcontractors will be required to enter into our standard contract. DBE Subcontractors must be listed by the CUCP for the work category code(s) that apply to the scope of work they are quoting. Items of work can be broken down to facilitate DBE participation. Graniterock intends to work cooperatively with all qualified firms seeking work on this project. Granite Rock Company is an equal opportunity employer
Date posted: 01/23/2018
Contractor: Papich Construction Co., Inc. Contact: Sydney Johnson
Address: 800 Farroll Rd., Grover Beach, CA 93433
Phone: 805-473-3016 Fax: 805-473-2217 Email: sjohnson@papichco.com
Services needed: We are seeking DBE/ DVBE participation from Subcontractors, Suppliers, and Consultants for the following items of work, but not limited to: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TYPE II BARRICADE, CHANNELIZER (SURFACE MOUNTED), PCMS, K-RAIL, TEMP ALT CRASH CUSHION SYSTEM, WPCP, STREET SWEEPING, REMOVE THERMO STRIPE + PAVEMENT MARKING, TREATED WOOD WASTE, PREPAVE INERTIAL PROFILER, PREPAVE GRINDING, OIL FOR HMA AND RHMA, DATA CORES, HMA DIKE, COLD PLANING, DETECTABLE WARNING SURFACE, MINOR CONCRETE, GUARDRAIL, ROADSIDE SIGNS, MIDWEST GUARDRAIL SYSTEM, STRIPING, RUMBLE STRIP, ELECTRICAL
Requirements: Papich Construction Company, Inc (PCI) intends to bid as a Prime for this Caltrans contract. We intend to conduct ourselves in good faith and work cooperatively with all qualified firms seeking work on this project. We are willing to break out items of work into economically feasible packages to facilitate DBE participation from certified firms. 100% performance and payment bonds will be required for the full amount of the subcontract price. We will reimburse for bond premium up to 2%. By submitting a price quote to PCI, subcontractors and suppliers affirm they have carefully examined ALL the bidding / contract documents / addenda and that from his/her own investigation, they have satisfied themselves as to the scope of the work. Please contact us for any assistance you may require for this solicitation, including obtaining bonding, insurance, equipment, materials and/or supplies. We are signatory to Operating Engineers and Laborers Unions. Any non-signatory subcontractors will be required to sign a one time agreement for trades covered under our union agreements. All project documents are available at no cost for download on the Caltrans Office Engineer Website. Project documents may also be viewed in our office by appointment. Subcontractors must posses a current contractor?s license, insurance and worker?s compensation coverage meeting project requirements and will be required to sign a standard Subcontract Agreement. If you are interested in providing pricing or if you have any questions about this project, or need any assistance from PCI to facilitate your firm?s participation on this project, please do not hesitate to contact us.
Date posted: 01/23/2018
Contractor: Papich Construction Co., Inc. Contact: Sydney Johnson
Address: 800 Farroll Rd., Grover Beach, CA 93433
Phone: 805-473-3016 Fax: 805-473-2217 Email: sjohnson@papichco.com
Services needed: We are seeking DBE/ DVBE participation from Subcontractors, Suppliers, and Consultants for the following items of work, but not limited to: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TYPE II BARRICADE, CHANNELIZER (SURFACE MOUNTED), PCMS, K-RAIL, TEMP ALT CRASH CUSHION SYSTEM, WPCP, TREATED WOOD WASTE, PREPAVE INERTIAL PROFILER, PREPAVE GRINDING, OIL FOR HMA AND RHMA, DATA CORES, HMA DIKE, COLD PLANING, GUARDRAIL, MIDWEST GUARDRAIL SYSTEM, STRIPING.
Requirements: Papich Construction Company, Inc (PCI) intends to bid as a Prime for this Caltrans contract. We intend to conduct ourselves in good faith and work cooperatively with all qualified firms seeking work on this project. We are willing to break out items of work into economically feasible packages to facilitate DBE participation from certified firms. 100% performance and payment bonds will be required for the full amount of the subcontract price. We will reimburse for bond premium up to 2%. By submitting a price quote to PCI, subcontractors and suppliers affirm they have carefully examined ALL the bidding / contract documents / addenda and that from his/her own investigation, they have satisfied themselves as to the scope of the work. Please contact us for any assistance you may require for this solicitation, including obtaining bonding, insurance, equipment, materials and/or supplies. We are signatory to Operating Engineers and Laborers Unions. Any non-signatory subcontractors will be required to sign a one time agreement for trades covered under our union agreements. All project documents are available at no cost for download on the Caltrans Office Engineer Website. Project documents may also be viewed in our office by appointment. Subcontractors must posses a current contractor?s license, insurance and worker?s compensation coverage meeting project requirements and will be required to sign a standard Subcontract Agreement. If you are interested in providing pricing or if you have any questions about this project, or need any assistance from PCI to facilitate your firm?s participation on this project, please do not hesitate to contact us.
Date posted: 01/23/2018
Contractor: Beador Construction Company, Inc. Contact: David Beador
Address: 26320 Lester Circle Corona, CA 92883
Phone: 951-674-7352 Fax: 951-674-7495 Email: roxana.quezada@beador.com
Services needed: Beador Construction is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Channelizer, K-Rail, Temp. Crash Cushions, SWPPP and Reports, Temporary BMPs, Treated Wood Waste, CIDH Piles, Sign Structure (Truss), Polyester Concrete, Bridge Removal, Detectable Warning Surface, Minor Concrete, Construction Survey, Manhole Frame and Cover, Misc. Metal, Modify Existing Signal and Lighting, Striping, Chain Link Railing Type 3, Tubular Handrailing, Concrete Barrier (Type 732SW Modified), Salvage Metal Bridge Railing, Temp. Lighting System, Modify Existing Electrical System
Requirements: Union Signatory, Subcontractors may be required to provide 100% Payment and Performance Bonds from a surety acceptable to Beador Construction, Beador will reimburse for bond premium not to exceed 1% of subcontract. Subcontractors will be required to meet Beador?s insurance requirements. Per current state regulations, please provide a current DIR number and expiration date with your quote. Plans and specifications are available from the Caltrans website or you may contact Beador for a copy to be emailed. Subcontractor scope (including any conditions or exceptions) is required via fax 24 hours prior to bid deadline to allow proper evaluation. Quotes are required to be in accordance with the plans and specifications and good for the contract duration as specified in the bid documents. Beador is an Equal Opportunity Employer. ** Please do not e-mail quotes, fax them to 951-674-7495.** DO NOT EMAIL QUOTES, PLEASE FAX TO 951-674-7495 QUOTES MUST BE FAXED 1 HOUR BEFORE BID DUE TIME.
Date posted: 01/23/2018
Contractor: Telfer Pavement Technologies, LLC Contact: Rick Arias
Address: 4522 Parker Avenue Suite 350 McClellan, CA. 95652
Phone: 916-383-1756 Fax: 916-383-4084 Email: estimating@telferpavements.com
Services needed: Telfer Pavement Technologies, LLC is seeking quotes from Qualified DVBE subcontractors and suppliers for work including but not limited to: Materials supply/delivery, Trucking, Lead Compliance Plan, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign, Job Site Management, Prepare Water Pollution Control Program, Channelizer (Surface Mounted), Temporary Railing (Type K), Temporary Alternative Crash Cushion System, temporary Concrete Washout, Concrete work, Street Sweeping, Treated Wood Waste, Shoulder Backing, Asphaltic Emulsion (Fog Seal Coat), Prepaving Inertial Profiler, Prepaving Grinding Day, Data Core, HMA Dike (Type A,C,E) and Removal, Cold Plane Asphalt Concrete Pavement, Guard Railing Delineator, Midwest Guardrail System (Steel Post), Transition railing (Type Wb-31), Alternative Flared Terminal System, Thermoplastic Pavement Markings and Removal, Thermoplastic Traffic Stripe and Removal (Enhanced Wet Night Visibility), Etc. Telfer Pavement Technologies, LLC will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. All Supplier and Subcontractor proposals shall be in strict accordance with said project plans, specifications, and any addenda issued.
Requirements: DVBE Subcontractors must possess a current contractor?s license, worker's compensation insurance coverage during the entire length of the contract. Performance and Payment bonds may be required. Plans and specification can be obtained from Cal Trans, your local plan room, or may be viewed through our office. You can contact our office if you need assistance in bonding, lines of credit, insurance, necessary equipment, supplies, materials or services required for this job.
Date posted: 01/26/2018
Contractor: CalPortland Construction Contact: David VanMuyden
Address: 1625 East Donovan Road Santa Maria, CA 93454
Phone: 805-345-3581 Fax: 805-345-3538 Email: dvanmuyden@calportland.com
Services needed: CalPortland Construction is seeking quotes from all qualified subcontractors and suppliers, including certified DVBE firms for the following items of work, including but not limited to: Lead Compliance Plan, Construction Area Signs, any Traffic Control related portion, PCMS, K-Rail, Temporary Crash Cushion, Job Site Management, Prepare Water Pollution Control Program, Concrete Washout, Street Sweeping, Striping, MBGR, Cold Plane Asphalt Concrete Pavement & Dike, Shoulder Backing, Liquid Asphalt & Delivery, RHMA Blending, HMA Dike, Tack Coat, PCC Barrier & Transition, Trucking.
Requirements: CalPortland Construction (CPC), a non-union company, intends to bid as a prime contractor. CPC will negotiate in good faith with all qualified DVBE subcontractors and suppliers for project participation. Any item of work, portion of an item, or combination thereof, will be considered. 100% Performance and Payment Bonds may be required. Bonding assistance is available. By submitting a bid for this project, subcontractors and suppliers affirm they have diligently examined all available project documentation and the project site, satisfying themselves completely of the project scope without reservation. Subcontractors must possess a valid CA contractor?s license, insurance and workers compensation coverage meeting CPC requirements, valid DIR number and will be required to sign a standard CPC Subcontract Agreement. Said agreement and insurance requirements may be obtained by calling the number listed below. CPC is an Equal Opportunity Employer. Please contact our office prior to bid date with any questions at (805) 345-3581. Bids may be emailed to:cpconstruction@calportland.com or by fax to: (805) 345-3538. For additional project details, please visit the Caltrans website at: http://www.dot.ca.gov/hq/esc/oe/weekly_ads/index.php. Documents may also be viewed at CPC?s office located at 1625 E. Donovan Rd., Santa Maria CA by appointment.
Date posted: 01/26/2018
Contractor: Peterson Chase General Engineering Construction Inc. Contact: Kali Goglanian
Address: 16351 Construction Circle West Irvine, CA 92606
Phone: 949-252-0441 Fax: 949-252-0266 Email: bids@petersonchase.com
Services needed: Peterson-Chase General Engineering Construction, Inc. is requesting quotes from all qualified subcontractors and suppliers including certified DVBE firms for the following items of work, including but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign (Ls), Job Site Management, Prepare Water Pollution Control Program, Temporary Drainage Inlet Protection, Temporary Concrete Washout, Remove Yellow Thermoplastic Traffic Stripe (Hazardous Waste), Structural Concrete, Bridge (Rsc), Clean Expansion Joint, Joint Seal (Mr 1/2"), Joint Seal (Mr 1"), Joint Seal (Mr 1 1/2"), Bonded Joint Seal (Mr 1 1/2"), Bar Reinforcing Steel (Bridge), Rapid Setting Concrete (Patch), Remove Asphalt Concrete Surfacing, Remove Unsound Concrete, Polyester Concrete Expansion Dam, Prepare Concrete Bridge Deck Surface, Treat Bridge Deck, Furnish Bridge Deck Treatment Material, Bridge Removal (Portion), Location A, Bridge Removal (Portion), Location B, Access Door Assembly, Pavement Marker (Retroreflective), 6" Permanent Tape Traffic Stripe, 8" Permanent Tape Traffic Stripe (Broken 12-3), 6" Permanent Tape Traffic Stripe (Broken 36-12), Remove Thermoplastic Traffic Stripe. Please email your quotes to Bids@petersonchase.com
Requirements: Peterson-Chase General Engineering Construction Inc. can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Dick Vogels at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Caltrans? requirements and will be required to sign the standard Peterson-Chase GEC., Inc. Subcontract Agreement. Plans and specifications are available to be viewed in our office located at 16351 Construction Circle West, Irvine, CA 92606, between 8:00 AM and 3:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Peterson-Chase GEC., Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. Peterson Chase General Engineering Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.
Date posted: 01/23/2018
Contractor: Empire Landscaping Inc Contact: Ahmet Gulcu
Address: 979 F Street Davis CA 95616
Phone: 530-400-3943 Fax: 530-231-5252 Email: gulcu@sbcglobal.net
Services needed: Services needed: Empire Landscaping Inc is looking for DBE subcontractors and suppliers including but not limited to lead compliance plan, construction area sings, traffic control system, job site management, prepare water pollution control program, temporary drainage inlet protection, temporary fiber roll, temporary contraction entrance, street sweeping, temporary concrete washout, roadway excavation, retaining wall, roadside clearing, soil amendment, organic fertilizer, plants, gravel, wood mulch, conductors, all the irrigation materials hydroseeding, retaining wall, geocomposite drain, miner concrete, maintain existing traffic management, electric service for irrigation any items of work or material you are qualified to perform or furnish.
Requirements: General liability, auto, worker compensation insurance and bonding may be required qualified subcontractors. Please contact us if you need help for obtaining bonding, insurance, equipments, materials, supplies or some other any other assistance in order to participate and doing business with us Bidder must have current contractor license, DBE certification and DIR number. Plans and specifications are available for viewing in our office or are available at Caltans website http:// www.dot.ca.gov/hq/esc/oe/weekly_ads/index.php Empire Landscaping Inc is an equal opportunity employer.
Date posted: 01/23/2018
Contractor: Granite Construction Company Contact: Joe Richardson
Address: 38000 Monroe Avenue Indio CA 92203
Phone: 760-775-7500 Fax: 760-775-8229 Email: joe.richardson@gcinc.com
Services needed: Aggregates, asphalt concrete, concrete ready mix, concrete accessories, diesel fuel, miscellaneous metals, precast concrete inlets, pipe steel, rip rap, traffic control, geosynthetics, SWPPP, AC dike, clean/grub, dust control, excavation, fence/guardrail, reinforcing steel, rock slope protection, storm pipe structures, sweeping, traffic control, trucking-bellies, well drillers, erosion control, signs-area, signs roadside, landscape & irrigation, underground pipeline
Requirements: For any bid proposal submitted on or after March 1, 2015 and any contract for public work entered into on or after April 1, 2015, the following registration requirements apply: Every Subcontractor is required to be registered to perform public work pursuant to Section 1725.5 of the Public Contract Code (Section 1725.5). No Contractor or Subcontractor shall be qualified to bid on, be listed in a bid proposal pursuant to Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, unless currently registered to perform public work pursuant to Section 1725.5. No bid shall be accepted nor any subcontract entered into without proof of the Subcontractors current registration to perform public work pursuant to Section 1725.5. Granite Construction Company (Granite) is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. 100% performance and payment bonds may be required for the full amount of subcontract price. Granite will pay for bond premium up to 1.5%. Subcontractors must possess a current contractors license, insurance and workers compensation coverage meeting Granite?s requirements and will be required to sign the standard Granite Subcontract Agreement. A copy of the insurance requirements and agreement can be obtained by contacting the estimator. Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies. Granite intends to work cooperatively with all qualified firms seeking work on this project.
Date posted: 01/23/2018
Contractor: Peterson Chase General Engineering Construction Inc. Contact: Kali Goglanian
Address: 16351 Construction Circle West Irvine, CA 92606
Phone: 949-252-0441 Fax: 949-252-0266 Email: bids@petersonchase.com
Services needed: Peterson-Chase General Engineering Construction, Inc. is requesting quotes from all qualified subcontractors and suppliers including certified DVBE firms for the following items of work, including but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign (Ls), Job Site Management, Prepare Water Pollution Control Program, Temporary Concrete Washout, Remove Yellow Thermoplastic Traffic Stripe (Hazardous Waste), Hot Mix Asphalt (Type A), Tack Coat, Cold Plane Asphalt Concrete Pavement, Structural Concrete, Approach Slab (Type R Modified), Paving Notch Extension, Clean Expansion Joint, Joint Seal (Mr 1/2"), Bonded Joint Seal (Mr 1"), Bonded Joint Seal (Mr 1 1/2"), Joint Seal (Mr 1"), Joint Seal (Mr 2"), Rapid Setting Concrete (Patch), Remove Asphalt Concrete Surfacing, Remove Unsound Concrete, Prepare Concrete Bridge Deck Surface, Furnish Polyester Concrete Overlay, Place Polyester Concrete Overlay, Treat Bridge Deck, Furnish Bridge Deck Treatment Material, Remove Pavement Marker, Pavement Marker (Retroreflective), 6" Traffic Stripe Tape (Warranty), Remove Thermoplastic Traffic Stripe, 6" Traffic Stripe Tape With Contrast (Broken 36-12) (Warranty). Please email your quotes to Bids@petersonchase.com
Requirements: Peterson-Chase General Engineering Construction Inc. can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Dick Vogels at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Caltrans? requirements and will be required to sign the standard Peterson-Chase GEC., Inc. Subcontract Agreement. Plans and specifications are available to be viewed in our office located at 16351 Construction Circle West, Irvine, CA 92606, between 8:00 AM and 3:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Peterson-Chase GEC., Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. Peterson Chase General Engineering Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.
Date posted: 01/23/2018
Contractor: Cal Valley Construction, Inc. Contact: Mike Hardy
Address: 5125 N. Gates Ave., #102 Fresno, CA 93722
Phone: 559-274-0300 Fax: 559-274-0311 Email: sales@calvalleyconstruction.com
Services needed:
Requirements:
Date posted: 01/24/2018
Contractor: Cal Valley Construction, Inc. Contact: Mike Hardy
Address: 5125 N. Gates Ave., #102 Fresno, CA 93722
Phone: 559-274-0300 Fax: 559-274-0311 Email: sales@calvalleyconstruction.com
Services needed: Cal Valley Construction (CVC) is requesting quotes from all qualified subcontractors and suppliers, including DVBE, SBE, MBE, WBE and UDBE for the above named project and items of work . Traffic Control, Lead Compliance Plan, WPCP, Prepaving Inertial Profiler, Prepave Grinding & QCQA & Data Core, Cold Plane AC, HMA Hauling, Pavement Marking & Striping, Rumble Strip, Maintain Existing Traffic Management System and Modify Existing Electrical System.
Requirements: Plans and specifications are available from the CDOT Website your local builders exchange and are available for viewing at the CVC office (5124 N Gates Ave. #102, Fresno, CA). CVC is signatory toe the Operating Engineers & Laborers Unions. 100% Performanse & Payment Bonds may be required for the full amount of the subcontractors price. CVC will pay up to 1.5% of subcontractors bond price. Subcontractors must possess a current contractors license, DIR registration number, Workers Compensation Insurance and insurance meeting CVC requirements. Cal Valley Construction is an equal opportunity employer.
Date posted: 01/24/2018
Contractor: O.C. Jones & Sons, Inc. Contact: Jean Sicard
Address: 1520 Fourth Street Berkeley, CA 94710
Phone: (510) 526-3424 Fax: (510) 526-0990 Email: jsicard@ocjones.com
Services needed: REQUEST FOR DBE SUBCONTRACTORS AND SUPPLIERS We are soliciting quotes for (including but not limited to): Trucking, Lead Compliance Plan, Develop Water Supply, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign, Temporary Creek Diversion System, SWPPP, Rain Event Action Plan, Storm Water Sampling & Analysis, Sweeping, Water Quality Sampling, Analysis and Monitoring, ADL Burial Location Report, Treated Wood Waste, Noise Monitoring, Clearing & Grubbing, Erosion Control, Roadway Excavation (Type Y-1 Aerially Deposited Lead), Structure Excavation, Structure Backfill, Concrete Backfill, Lean Concrete Backfill, Planting & Irrigation, Lean Concrete Base, Data Core, AC Dike, Tack Coat, Cold Plane AC, CIDH Concrete Pile, Minor Concrete, Fractured Rib Texture, Precast Concrete Lagging, Soldier Pile Wall, Soil Nail Wal, Concrete Retaining Walls, Precast Box Culvert, Bar Reinforcing Steel, Structural Shotcrete, Clean and Paint Steel Soldier Piling, Underground, Adjust Utilities, Rock Slope Protection, Misc. Iron & Steel, Prepare & Paint Concrete, Fencing, Pavement Marker, Object Marker, Roadside Signs, Sign Structures, Midwest Guardrail System, Double Thrie Beam Barrier, Transition Railing, Crash Cushion, Concrete Barrier, Striping & Marking, Electrical and Construction Materials
Requirements: An Equal Opportunity Employer 100% Performance & Payment Bonds may be required. Worker?s Compensation Waiver of Subrogation required. Please call OCJ for assistance with bonding, insurance, necessary equipment, material and/or supplies. OCJ is willing to breakout any portion of work to encourage DBE Participation. Plans & Specs are available for viewing at our office or through the Caltrans Website at www.dot.ca.gov/hq/esc/oe/weekly_ads/index.php.
Date posted: 01/24/2018
Contractor: Bowman Asphalt, Inc. Contact: Britt Gonzalez
Address: 3351 Fairhaven Dr. Bakersfield, CA 93308
Phone: 661-334-1356 Fax: 661-334-1879 Email: bgonzalez@bowmanasphalt.com
Services needed: Bowman Asphalt, Inc. is requesting quotes from Qualified DVBE subcontractors and suppliers for work including but not limited to: Lead Compliance Plan, Construction Area Signs, Trafic Control System, Portable Changeable Message Sign (LS), Job Site Management, Prepare Water Pollution Control Program, Prepaving Intertial Profiler, Prepaving Grinding Day, Hot Mix Asphalt (Type A), Data Core, Tack Coat, Cold Plane Asphalt Concrete Pavement, Pavement Marker (Retroreflective-Recessed), 6" Two-Component Paint Traffic Stripe, All Trucking and Materials.
Requirements: Bowman Asphalt, Inc. is an Equal Opportunity Employer. We intend to negotiate in good faith with all qualified DVBE Subcontractors and Suppliers for project participation. Any item of work, portion of an item, or combination thereof, will be considered. Please contact our office prior to bid date. If you have any questions, need assistance in obtaining plans and specs, bonding, lines of credit, insurance, equipment, supplies and materials or related assistance in services, please contact our office. Subcontractors must possess a current contractor's license, insurance and worker's compensation coverage. By submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. If you need any assistance, please do not hesitate to call our office at (661) 334-1356. Items o f work may be broken down into economically feasible packages to encourage participation. Bowman Asphalt, Inc. intends to work cooperatively with all qualified firms seeking work on this project.
Date posted: 01/24/2018
Contractor: R. Burke Corporation Contact: Rob Burke
Address: 865 Capitolio Way San Luis Obispo, CA 93401
Phone: 805-543-8568 Fax: 805-543-2521 Email: rbc@rburkecorporation.com
Services needed: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TEMPORARY PEDESTRIAN ACCESS ROUTE, PORTABLE CHANGEABLE MESSAGE SIGN (LS), JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM, TEMPORARY CONCRETE WASHOUT, TREATED WOOD WASTE, SHOULDER BACKING, PREPAVING INERTIAL PROFILER, REPLACE ASPHALT CONCRETE SURFACING, HOT MIX ASPHALT (TYPE A), RUBBERIZED HOT MIX ASPHALT (GAP GRADED), DATA CORE, PLACE HOT MIX ASPHALT DIKE (TYPE E), TACK COAT, REMOVE ASPHALT CONCRETE DIKE, COLD PLANE ASPHALT CONCRETE PAVEMENT, REMOVE BRIDGE MOUNTED SIGN, DETECTABLE WARNING SURFACE, MINOR CONCRETE (CURB AND CURB RAMP), REMOVE CONCRETE CURB AND SIDEWALK (SQYD), SURVEY MONUMENT (TYPE D), PAVEMENT MARKER (RETROREFLECTIVE), REMOVE ROADSIDE SIGN, FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-FRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-FRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI), RETROREFLECTIVE SHEETING (TYPE XI), ROADSIDE SIGN - ONE POST, ROADSIDE SIGN - TWO POST, INSTALL FRAMED SIGN PANEL, 6" TRAFFIC STRIPE (WARRANTY), 6" TRAFFIC STRIPE (WARRANTY) (BROKEN 8-4), PAVEMENT MARKING (WARRANTY),TRAFFIC MONITORING STATION SYSTEM, MOBILIZATION
Requirements: ANTI-GRAFFITI COATING, FENCE (TYPE WM, METAL POST), REMOVE FENCE, DELINEATOR (CLASS 1), PAVEMENT MARKER (RETROREFLECTIVE), MARKER (CULVERT), OBJECT MARKER (TYPE K-1), REMOVE SIGN, REMOVE ROADSIDE SIGN PANEL, RELOCATE ROADSIDE SIGN, FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED), ROADSIDE SIGN - ONE POST, ROADSIDE SIGN - TWO POST, INSTALL ROADSIDE SIGN PANEL ON EXISTING POST, FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-FRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI), RETROREFLECTIVE SHEETING (TYPE XI), MIDWEST GUARDRAIL SYSTEM, VEGETATION CONTROL (MINOR CONCRETE), TRANSITION RAILING (TYPE WB-31), END ANCHOR ASSEMBLY (TYPE SFT), ALTERNATIVE IN-LINE TERMINAL SYSTEM, ALTERNATIVE FLARED TERMINAL SYSTEM, REMOVE GUARDRAIL, 6" THERMOPLASTIC TRAFFIC STRIPE, 8" THERMOPLASTIC TRAFFIC STRIPE, 8" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 4-2), THERMOPLASTIC PAVEMENT MARKING, 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 12-3), REMOVE THERMOPLASTIC PAVEMENT MARKING, LIGHTING SYSTEM, TRAFFIC MONITORING STATION SYSTEM, MOBILIZATION
Date posted: 01/24/2018
Contractor: Sukut Construction, LLC Contact: Jerry Pabbruwee
Address: 4010 W. Chandler Avenue Santa Ana, CA 92704
Phone: 714-540-5351 Fax: 714-545-2003 Email: estimating@sukut.com; jpabbruwee@sukut.com
Services needed: Qualified and certified DBE Subcontractors, Suppliers, and Service Providers for the following (but not limited to) work: Signs, Erosion Control, Fencing, Landscape, Trucking, Rip Rap, Guardrail, Traffic Control, Treated Wood Waste, Rebar, Steel Pipe Arch, Corrugated Steel Pipe
Requirements: Plans/specs are available for viewing at our office by appointment, via Sukut's FTP site, or may be obtained from Owner. Subcontractors must be prepared to furnish 100% performance and payment bonds and possess current insurance, workers' comp coverage, DIR registration, and current contractor's license. Subcontractors must be prepared to furnish 100% performance and payment bonds and possess current insurance, workers' comp coverage, DIR registration, and contractor's license. Sukut's listing of a Subcontractor in its bid to the agency is not to be construed as an acceptance of all of the Subcontractor's conditions or exceptions included with Subcontractor's price quotes. Quotations must be valid for the same duration as specified by Owner for contract award. Sukut will work supportively with all qualified subs and vendors seeking work on this project. Please contact Sukut for assistance in responding to this solicitation including obtaining bonds, insurance, and/or lines of credit. Subcontractors/Vendors will be required to sign Sukut's Standard Subcontract/Purchase Order. Copies are available for examination. Sukut Construction, LLC is an Equal Opportunity Employer.
Date posted: 01/24/2018
Contractor: SnL Group Inc. Contact: Tim Lewis
Address: 9818 Holton Way Redding CA 96003
Phone: 530-222-5045 Fax: 530-222-5140 Email: tlewis@snlinc.com
Services needed: SnL Group Inc. is seeking certified DVBE & DBEsubcontractors and vendors to provide services and materials for the following project: Construction on State Highway in Butte and Plumas County at various locations, Contract No. 02-0H0304. The work will consist of Upgrading Drainage System. SnL Group Inc. is requesting quotes from all certified DVBE & DBE subcontractors and vendors for all items of work, including but not limited to the following bid items: Lead Compliance Plan, Construction Area Signs Traffic Control, Portable Changeable Message Boards, Job Site Management, Prepare Water Pollution Control Program, Temporary Concrete Washout, Treated Wood Waste, Contractor Supplied Biologist , Erosion Control and any/all items in contract.. Bids open Thursday, 2/15/18. The Department will receive bids until 2:00pm on 2/15/18. The estimated cost of the project is $540,000. The DVBE Contract goal is 5 percent. . SnL Group Inc will work with qualified DVBE & DBE subcontractors and vendors to develop custom scopes of work and supply. DVBE & DBE subcontractors and vendors must provide current certification. All subcontractors must have a current contractor?s license, insurance coverage, and workers compensation for the entire duration of the contract. All subcontractors will be required to enter a subcontractor agreement with SnL Group Inc.. Project plans and specifications can be viewed at our office location. We are an equal opportunity employer, Interested subcontractors and vendors are encouraged to contact us at SnL Group Inc.,9818 Holton Way, Redding, CA 96003, Phone: 530-222-5048, Fax 530-222-5140.
Requirements:
Date posted: 01/24/2018
Contractor: DMZ Builders Contact: Adam Sheldon
Address: 4070 Nelson Ave, Suite A Concord, CA 94520
Phone: 925-826-5387 Fax: 925-826-5766 Email: asheldon@dmzbuilders.com
Services needed: DMZ Builders is requesting quotes from all qualified subcontractors and suppliers, including DISADVANTAGED VETERAN BUSINESS ENTERPRISES (DVBE) and Department of General Services certified SMALL BUSINESSES (SB) for all items of work, including but not limited to the following: Lead Compliance Plan, Construction Area Signs, Traffic Control Systems, Portable Changeable Message Signs, Job Site Management, Prepare Water Pollution Control Program, QSD/QSP Services and SWPPP Support, Core & Bond Dowel (Chemical Adhesive), Furnish Structural Steel (Bridge), Erect Structural Steel (Bridge), Reconstruct Damper Brackets, Furnish Viscous Dampers, Install Viscous Dampers, High Strength Threaded Rods, Clean and Paint Structural Steel, Spot Blast Clean And Paint Undercoat, Steam Cleaning Existing Dampers Fluid Leakage, Bridge Removal (Portion), Access Equipment and Services, Hoisting and Material Handling, and Safety Supplies/Equipment.
Requirements: DMZ Builders An Equal Opportunity Employer is requesting quotations from all qualified DVBE and SB subcontractors and suppliers for Caltrans Project 04-3G4424. DMZ Builders is a union signatory contractor. Quotations must be valid for the same duration as specified by the Owner for contract award. Subcontractors must provide contractor?s license number and Department of Industrial Relations (DIR) registration number with their quote. Subcontractors must possess a current contractor?s license, worker?s compensation and insurance coverage during the entire length of the prime contract. Subcontractors will be required to execute DMZ Builders Standard Subcontract Terms and Conditions and meet insurance requirements, including Worker's Compensation Waiver of Subrogation. A copy of our Standard Subcontract Terms and Conditions and Purchase Order Agreement (for suppliers) are available for review in electronic format, upon request. Subcontractor will be required to provide payment and performance bonds assuring bidder?s obligations to DMZ Builders in the amount of 100 percent of Subcontract value. DMZ Builders will reimburse Subcontractor for bond premium at actual cost, not to exceed 1.5%. Plans and specifications are available at no cost to interested firms via the Caltrans Website using the Project ID # 04-3G4424 and/or can be viewed at DMZ Builders Concord, CA office, by contacting DMZ office to make an appointment. For any assistance in obtaining bonding, lines of credit, insurance, equipment, supplies and materials, technical assistance, and/or any other coordination required for the project, please contact Adam Sheldon: Phone # 925-826-5387, Fax # 925-826-5766, or Email estimating@dmzbuilders.com. DMZ will work with interested subcontractors and suppliers to identify opportunities to break down items/work into economically feasible packages. Quotations will be broken down into comparable packages as reasonably necessary to increase overall DVBE and SBE participation. DMZ Builders intends to work cooperatively with all qualified firms seeking work on this project.
Date posted: 01/24/2018
Contractor: Ghilotti Construction Company, Inc. Contact: Mark Mahboubi
Address: 246 Ghilotti Avenue Santa Rosa, CA 95407
Phone: 707-585-1221 Fax: 707-585-1601 Email: markm@ghilotti.com
Services needed: Ghilotti Construction Company, Inc. is seeking certified DBE subcontractors, suppliers & truckers for quotes including, but not limited to, the following scopes of work: CONSTRUCTION AREA SIGNS, ROADSIDE SIGNS, SIGNAL, TRAFFIC CONTROL, MODIFYING EXISTING ELECTRICAL SYSTEM, RESET-ADJUST ROADWAY ITEMS, COLD PLANE ASPHALT CONCRETE PAVEMENT, CLEAR & GRUB, FABRIC & OILS, STRUCTURAL CONCRETE, MINOR CONCRETE STRUCTURE, AC DIKE, REINFORCING STEEL, SOIL NAIL, AIR BLOWN MORTAR-SHOTCRETE, PREPARE & STAIN SHOTCRETE, CONCRETE CURB & SIDEWALK - MISC., CONCRETE BARRIER, METAL BEAM GUARD RAILING, CABLE RAILING, THERMOPLASTIC STRIPING & PAVEMENT MARKINGS, PAINTED TRAFFIC STRIPING & PAVEMENT MARKINGS, PAVEMENT MARKING, EROSION CONTROL, STORM DRAIN (UNDERGROUND), STREET SWEEPING, MATERIAL SUPPLIER & TRUCKING. Submit quotes by Noon on bid date. Contact our estimator for more information. GCC is available to discuss breaking out any portion of work to encourage minority participation.
Requirements: Mr. Mark Mahboubi (707/585-1221 or markm@ghilotti.com) is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. GCC may also assist in obtaining any necessary equipment, supplies, materials or related services. (Please note: G.C.C. may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108. G.C.C. will pay bond premiums up to 1 1/2% of contract cost. G.C.C. is a UNION CONTRACTOR. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.) Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. Plans may also be viewed or purchased through local plan rooms, builder's exchanges, or Dodge Scan. Ghilotti Construction Company encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project. Req: By submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. GCC's written subcontract document execution is required of all successful subcontract bidders. A copy is available for inspection on GCC's website (www.ghilotti.com/subcontractors/documents) and/or can be provided upon written request prior to bid submission. Inconsistent bid terms and conditions shall be void. Insurance: As per our insurance requirements, your bid must include the cost of naming GCC as additional insured; including completed operations coverage; Use form CG-2010-1185 or equivalent; include Primary and Non-Contributing wording on your certificate of insurance and waiver of subrogation is required. We are an equal opportunity employer.
Date posted: 01/25/2018
Contractor: Brosamer & Wall, Inc Contact: Robert Rosas
Address: 1777 Oakland Blvd., Suite 300 Walnut Creek, CA 94596
Phone: 925-932-7900 Fax: 925-279-2269 Email: rrosas@brosamerwall.com
Services needed: Brosamer & Wall Inc., is requesting quotes from all qualified subcontractors and suppliers including but not limited certified DBE/SBE firms for the following scopes of work 1- LEAD COMPLIANCE PLAN, 2- PROGRESS SCHEDULE (CRITICAL PATH METHOD), 3- TIME-RELATED OVERHEAD (LS), 4- DEVELOP WATER SUPPLY, 5- CONSTRUCTION AREA SIGNS, 6- TRAFFIC CONTROL SYSTEM, 7- TEMPORARY PAVEMENT MARKING (PAINT), 8- TEMPORARY TRAFFIC STRIPE (PAINT), 9- CHANNELIZER (SURFACE MOUNTED), 10- TEMPORARY PAVEMENT MARKER, 11- PORTABLE CHANGEABLE MESSAGE SIGN (LS), 12- TEMPORARY RAILING (TYPE K), 13- TEMPORARY CRASH CUSHION MODULE, 14- TEMPORARY ALTERNATIVE CRASH CUSHION, 15- JOB SITE MANAGEMENT, 16- TEMPORARY CREEK DIVERSION SYSTEM, 17- PREPARE STORM WATER POLLUTION PREVENTION PLAN, 18- RAIN EVENT ACTION PLAN, 19- STORM WATER SAMPLING AND ANALYSIS DAY, 20- STORM WATER ANNUAL REPORT, 21- MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL), 22- TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX), 23- TEMPORARY COVER, 24- TEMPORARY CHECK DAM, 25- TEMPORARY DRAINAGE INLET PROTECTION, 26- TEMPORARY FIBER ROLL, 27- TEMPORARY SILT FENCE, 28- TEMPORARY CONSTRUCTION ENTRANCE, 29- STREET SWEEPING, 30- TEMPORARY CONCRETE WASHOUT, 31- WATER QUALITY SAMPLING AND ANALYSIS DAY, 32- WATER QUALITY MONITORING REPORT, 33- WATER QUALITY ANNUAL REPORT, 34- REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE), 35- ADL BURIAL LOCATION REPORT, 36- TREATED WOOD WASTE, 37- NOISE MONITORING, 38- REMOVE CONCRETE (CY), 39- TEMPORARY HIGH-VISIBILITY FENCE, 40- CLEARING AND GRUBBING (LS), 41- ROADWAY EXCAVATION, 42- ROADWAY EXCAVATION (TYPE Y-1) (AERIALLY DEPOSITED LEAD), 43(F)- STRUCTURE EXCAVATION (TYPE D), 44(F)- STRUCTURE EXCAVATION (RETAINING WALL), 45(F)- STRUCTURE EXCAVATION (SOLDIER PILE WALL), 46(F)- STRUCTURE EXCAVATION (SOIL NAIL WALL), 47(F)- STRUCTURE BACKFILL (SLURRY CEMENT), 48(F)- STRUCTURE BACKFILL (RETAINING WALL), 49(F)- STRUCTURE BACKFILL (SOIL NAIL WALL), 50(F)- STRUCTURE BACKFILL (SOLDIER PILE WALL), 51(F)- PERVIOUS BACKFILL MATERIAL (RETAINING WALL), 52(F)- CONCRETE BACKFILL (SOLDIER PILE WALL), 53- CONCRETE BACKFILL, 54(F)- LEAN CONCRETE BACKFILL, 55- ROADSIDE CLEARING, 56- PRUNE EXISTING PLANTS, 57- IRON SULFATE (LB), 58- SOIL AMENDMENT, 59- PACKET FERTILIZER, 60- SLOW-RELEASE FERTILIZER, 61- PLANT (GROUP I), 62- PLANT (GROUP B), 63- MAINTAIN EXISTING PLANTED AREAS, 64- PLANT ESTABLISHMENT WORK, 65- WOOD MULCH, 66- FOLIAGE PROTECTOR, 67- CHECK AND TEST EXISTING IRRIGATION FACILITIES, 68- 2" WYE STRAINER ASSEMBLY, 69- RISER SPRINKLER ASSEMBLY, 70- CAM COUPLER ASSEMBLY, 71(F)- 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 72(F)- 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 73(F)- 1 1/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 74(F)- 1 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 75(F)- 2" PLASTIC PIPE (CLASS 315) (SUPPLY LINE), 76- QUICK COUPLING VALVE, 77- BALL VALVE, 78- MOVE-IN/MOVE-OUT (EROSION CONTROL), 79- IMPORTED BIOFILTRATION TOPSOIL, 80- ROLLED EROSION CONTROL PRODUCT (NETTING), 81- HYDROMULCH, 82- FIBER ROLLS, 83- STRAW, 84- HYDROSEED, 85- COMPOST (CY), 86- INCORPORATE MATERIALS, 87- CLASS 4 AGGREGATE SUBBASE, 88- CLASS 2 AGGREGATE BASE (CY), 89- LEAN CONCRETE BASE, 90- HOT MIX ASPHALT (TYPE A), 91- RUBBERIZED HOT MIX ASPHALT (GAP GRADED), 92- HOT MIX ASPHALT-OPEN GRADED (OPEN GRADED FRICTION COURSE), 93- DATA CORE, 94- PLACE HOT MIX ASPHALT DIKE (TYPE C), 95- PLACE HOT MIX ASPHALT DIKE (TYPE E), 96- PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA), 97- TACK COAT, 98- COLD PLANE ASPHALT CONCRETE PAVEMENT, 99- REMOVE BASE AND SURFACING, 100- REMOVE CONCRETE PAVEMENT (CY), 101- SOIL NAIL, 102- STEEL SOLDIER PILE (HP 14 X 102), 103- 30" DRILLED HOLE, 104- 60" CAST-IN-DRILLED-HOLE CONCRETE PILE (SIGN FOUNDATION), 105(F)- STRUCTURAL CONCRETE, RETAINING WALL, 106(F)- STRUCTURAL CONCRETE, BOX CULVERT, 107(F)- STRUCTURAL CONCRETE, HEADWALL, 108(F)- STRUCTURAL CONCRETE, DRAINAGE INLET, 109(F)- MINOR CONCRETE (BACKFILL), 110(F)- FRACTURED RIB TEXTURE, 111(F)- PRECAST CONCRETE LAGGING, 112(F)- BAR REINFORCING STEEL (RETAINING WALL), 113(F)- BAR REINFORCING STEEL (BOX CULVERT), 114- BAR REINFORCING STEEL (HEADWALL), 115(F)- STRUCTURAL SHOTCRETE, 116- RELOCATE SIGN STRUCTURE, 117- CLEAN AND PAINT STEEL SOLDIER PILING, 118- SPOT BLAST CLEAN AND PAINT UNDERCOAT, 119- REMOVE RETAINING WALL (PORTION) (CY), 120- 18" ALTERNATIVE PIPE CULVERT, 121- 18" ALTERNATIVE PIPE CULVERT (TYPE B), 122- 30" ALTERNATIVE PIPE CULVERT, 123- 36" ALTERNATIVE PIPE CULVERT (TYPE B), 124- 48" ALTERNATIVE PIPE CULVERT, 125- 60" ALTERNATIVE PIPE CULVERT, 126- CONCRETE BACKFILL(RAPID STRENGTH CONCRETE), 127- 6" PLASTIC PIPE, 128- 6" PERFORATED PLASTIC PIPE UNDERDRAIN, 129- 8" PERFORATED PLASTIC PIPE UNDERDRAIN, 130- 18" CORRUGATED STEEL PIPE DOWNDRAIN (.064" THICK), 131- 24" PLASTIC PIPE DOWNDRAIN, 132- DRAINAGE INLET MARKER, 133- 18" ALTERNATIVE FLARED END SECTION, 134- 36" ALTERNATIVE FLARED END SECTION, 135- INLET DEPRESSION, 136- ABANDON CULVERT (LF), 137- ABANDON INLET, 138- REMOVE PIPE (LF), 139- REMOVE INLET, 140- REMOVE HEADWALL, 141- REMOVE MANHOLE, 142- REMOVE FLARED END SECTION (EA), 143- ADJUST INLET, 144- ADJUST MANHOLE, 145- CAP INLET, 146(F)- ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY), 147- CONCRETE (DITCH LINING), 148- ROCK SLOPE PROTECTION FABRIC (CLASS 8), 149- MINOR CONCRETE (GUTTER) (LF), 150- MINOR CONCRETE (MISCELLANEOUS CONSTRUCTION), 151- MINOR CONCRETE (TEXTURED PAVING), 152(F)- MISCELLANEOUS IRON AND STEEL, 153- PREPARE AND PAINT CONCRETE, 154- CHAIN LINK FENCE (TYPE CL-4, VINYL-CLAD), 155- CHAIN LINK FENCE (TYPE CL-6), 156- 12' CHAIN LINK GATE (TYPE CL-6), 157- REMOVE CHAIN LINK FENCE, 158- REMOVE PAVEMENT MARKER, 159- DELINEATOR (CLASS 1), 160- PAVEMENT MARKER (RETROREFLECTIVE), 161- OBJECT MARKER (TYPE P), 162- OBJECT MARKER (TYPE L-1), 163- SPECIAL MARKER, 164- REMOVE ROADSIDE SIGN, 165- REMOVE ROADSIDE SIGN PANEL, 166- REMOVE SIGN PANEL, 167- RESET ROADSIDE SIGN, 168- RELOCATE ROADSIDE SIGN-ONE POST, 169- RELOCATE ROADSIDE SIGN-TWO POST, 170- FURNISH FORMED PANEL SIGN (OVERHEAD), 171- FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED), 172- FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED), 173- FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-FRAMED), 174- METAL (BARRIER MOUNTED SIGN), 175- ROADSIDE SIGN - ONE POST, 176- ROADSIDE SIGN - TWO POST, 177- INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD), 178- INSTALL ROADSIDE SIGN PANEL ON EXISTING POST, 179- INSTALL ROADSIDE SIGN (LAMINATED WOOD BOX POST), 180- MIDWEST GUARDRAIL SYSTEM (WOOD POST), 181- VEGETATION CONTROL (MINOR CONCRETE), 182- DOUBLE THRIE BEAM BARRIER, 183- TRANSITION RAILING (TYPE WB-31), 184- END ANCHOR ASSEMBLY (TYPE SFT), 185- ALTERNATIVE IN-LINE TERMINAL SYSTEM, 186- ALTERNATIVE FLARED TERMINAL SYSTEM, 187- ALTERNATIVE CRASH CUSHION SYSTEM, 188- CONCRETE BARRIER (TYPE 60P), 189- CONCRETE BARRIER (TYPE 60), 190- CONCRETE BARRIER (TYPE 60C), 191- CONCRETE BARRIER (TYPE 60D), 192- CONCRETE BARRIER (TYPE 60D MODIFIED), 193(F)- CONCRETE BARRIER (TYPE 736A), 194- CONCRETE BARRIER (TYPE 736B), 195- REMOVE GUARDRAIL, 196- REMOVE DOUBLE THRIE BEAM BARRIER, 197- REMOVE CONCRETE BARRIER, 198- THERMOPLASTIC PAVEMENT MARKING, 199- 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 6-1), 200- 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 36-12), 201- 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 17-7), 202- PAINT PAVEMENT MARKING (2-COAT), 203- 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 8-4), 204- 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), 205- 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN BLACK 18-12), 206- REMOVE PAINTED TRAFFIC STRIPE, 207- REMOVE PAINTED PAVEMENT MARKING, 208- REMOVE THERMOPLASTIC TRAFFIC STRIPE, 209- REMOVE THERMOPLASTIC PAVEMENT MARKING, 210- MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, 211- TEMPORARY RAMP METERING SYSTEM, 212- TEMPORARY TRAFFIC MONITORING STATION SYSTEM, 213- TEMPORARY LIGHTING SYSTEM, 214- MODIFYING EXISTING ELECTRICAL SYSTEM, 215- MOBILIZATION, GENERAL TRUCKING, SWEEPING, WATER TRUCKS, EROSION CONTROL MATERIALS, AGGREGATE SUBBASE MATERIAL, AGGREGATE BASE, ASPHALT OIL SUPPLY, RUBBER ASPHLAT OIL SUPPLY AND TACK COAT MATERIAL SUPPLY.
Requirements: Requirements: Brosamer & Wall, Inc. will work with interested subcontractors/suppliers to identify opportunities to break down items into economically feasible packages to facilitate DBE Participation. Brosamer & Wall, Inc. is a union signatory contractor. Subcontractors must possess a current contractor?s license, insurance coverage and worker?s compensation for the entire length of the contract. All subcontractors will be required to sign our standard Subcontract Agreement. 100% payment and performance bonds may be required. If you have any questions regarding this project or need assistance in obtaining/waiving insurance, bonding, equipment, materials and/or supplies please call or email Robert Rosas contact information below. Plans and specifications can be viewed at our office located at 1777 Oakland Blvd Suite 300, Walnut Creek, Ca. 94596 or at no cost from Caltrans website. B&W will also make plans electronically please email rrosas@brosamerwall.com for free online link. Brosamer & Wall INC., intends to work cooperatively with all qualified firms seeking work on this project. If you are interested in submitting a subcontractor bid for this project, you may contact Robert Rosas Chief Estimator at 925-932-7900 or fax us your quote at 925-279-2269. PLEASE SUBMIT A COPY OF YOUR CURRENT DBE CERTIFICATION WITH YOUR BID. Subcontractors, Dealers/Suppliers and Brokers please provide your designation code to us on or before the bid date. B&W, INC., IS AN EQUAL OPPORTUNITY EMPLOYER.
Date posted: 01/25/2018
Contractor: Bortolussi & Watkin,Inc. Contact: Laura Canas
Address: 77 Larkspur Street San Rafael, CA 94901
Phone: 415-453-4675 Fax: 415-453-2978 Email: laura@bwatkin.com
Services needed: Bortolussi & Watkin, Inc. is seeking quotes from DBE subcontractors and suppliers: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign, Job Site Management, Prepare Storm Water Pollution Prevention Plan, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Street Sweeping, Temporary Concrete Washout, Roadway Excavation, Structure Excavation (Retaining Wall), Structure Backfill (Retaining Wall), Roadside Clearing, Edging, 12? Corrugated High Density Polyethylene Pipe Conduit, Hydromulch, Straw, Hydroseed, Class 2 Aggregate Base, Structural Concrete Retaining Wall, Architectural Treatment, Bar Reinforcing Steel (Retaining Wall), Asphalt Membrane Waterproofing, Geocomposite Drain, Minor Concrete (Miscellaneous Construction), Miscellaneous Metal (Retaining Wall), Maintaining Existing Traffic Management System Elements During Construction and Electric Service for Irrigation.
Requirements: Bortolussi & Watkin, Inc. is an Equal Opportunity Employer is willing to breakout any portion of work to encourage DBE participation. Please Include Your License Number and DIR Number on All Quotes Submitted. Please call for assistance in bonding, insurance, lines of credit, technical info, equipment and supplies or if any other assistance is needed.Please fax quotes no later than 10:00am on bid day
Date posted: 01/25/2018
Contractor: George Reed, Inc. Contact: Stephanie Fuller
Address: 140 Empire Avenue Modesto, CA 95354
Phone: 209-557-3149 Fax: 209-523-4927 Email: stephanie.fuller@georgereed.com
Services needed: DVBE Subcontractors/Suppliers needed for, including but not limited to ? CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PLANE ASPHALT CONCRETE, TRAFFIC STRIPING & MARKING, SIGNAL & LIGHTING, SWPPP, WATER TRUCK, STREET SWEEPING TRUCK, OIL SUPPLIERS & RUMBLE STRIPS; or any item of work or material you are qualified to perform or furnish.
Requirements: Plans and specifications are available for viewing in our office, or are available at the CALTRANS website, http://www.dot.ca.gov/hq/esc/oe/weekly_ads/index.php. - - - GEORGE REED, INC. is signatory to Operating Engineers, Laborers, and Cement Masons Unions. - - - 100% Performance and Payment Bonds may be required for the full amount of subcontract price. GEORGE REED, INC. will pay bond premium up to 2%. - - - Subcontractor must possess current insurance and workers compensation coverage meeting GRI?s insurance requirements. Insurance waiver of subrogation is also required. - - - Please call if you need assistance with bonding, insurance, equipment, materials and/or supplies, or any related services. - - - GEORGE REED, INC. is an Equal Opportunity Employer.
Date posted: 01/25/2018
Contractor: JJ NGUYEN, INC Contact: Vivian Tran
Address: 3172 Salem Dr San Jose Ca 95127
Phone: 408-899-6841 Fax: 408-982-3977 Email: vtran@jjnguyeninc.com
Services needed: JJ Nguyen, Inc. is seeking qualified DBE contractors and suppliers for the following items of work: Lead compliance plan, construction area signs, traffic control systems, portable changeable message signs, prepare storm water pollution prevention program, temporary drainage inlet protection, temporary fiber roll, temporary construction entrance, street sweeping, temporary concrete washout, irrigation materials, structural concrete retaining wall, architectural treatment, bar reinforcing steel (retaining wall), asphalt membrane waterproofing, geocomposite drain, minor concrete (miscellaneous construction), miscellaneous metal (retaining wall), maintaining existing traffic management systems elements during construction, electric service for irrigation.
Requirements: Please include your license number and DIR number on all quotes submitted and fax quotes no later than 10:00am on bid day. Please contact us if you need assistance in obtaining bonding and insurance. We are an equal opportunity employer.
Date posted: 01/25/2018
Contractor: Granite Construction Company Contact: Rick Spielman
Address: 2716 Granite Court Fresno, CA 93706
Phone: 559-441-5700 Fax: 559-441-5791 Email: rick.spielman@gcinc.com
Services needed: Granite Construction Company is requesting quotes from all qualified subcontractors and suppliers including certified DVBE firms for the following items of work, including but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Portable CMS, Job Site Management, Prepare Water Pollution Control Plan, Shoulder Backing, Prepave Inertial Profiler, Prepaving Grinding Day, HMA (Type A), RHMA (Gap Graded), Data Core, Tack Coat, Cold Plane Asphalt Concrete Pavement, Adjust Manhole to Grade, Survey Monument, Adjust Monument Cover to Grade, Pavement Delineation, Rumble Strip, Maintain Existing TMS, Modify Existing Electrical System, Street Sweeping, Material Supplier and Trucking. Quotations will be broken down into comparable packages as reasonably necessary. Granite will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Portions of work can be made available upon request prior to bid date. Please call if any assistance is needed.
Requirements: Plans and specifications are available at your local Builders Exchange and/ or on the CDOT website: http://www.dot.ca.gov/hq/esc/oe/weekly_ads/index.php. They are also available for viewing at our office located at 2716 Granite Court, Fresno CA. Requirements: Granite is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. This will be a prevailing wage job. 100% performance and payment bonds may be required for the full amount of subcontract price. Granite will pay for bond premium up to 1.5%. Subcontractors must possess a current contractor?s license, DIR registration number, insurance and worker?s compensation coverage meeting Granite?s requirements and will be required to sign the standard Granite Subcontract Agreement. A copy of the insurance requirements and agreement can be obtained by contacting the estimator. Granite intends to work cooperatively with all qualified firms seeking work on this project. If you need services and or assistance in obtaining bonds, lines of credit, insurance, necessary equipment, materials and/or supplies, for this project call the Estimator, or contact your local Small Business Development Center Network (http://californiasbdc.org), Minority Business Development Center (www.mbda.gov) or contact the California Southwest Transportation Resource Center (https://www.transportation.gov/osdbu/sw-region-sbtrc). Please call or email if any assistance is needed. Granite Construction Company Is An Equal Opportunity Business Employer
Date posted: 01/25/2018
Contractor: Pave-Tech Inc. Contact: Daniel Zavalani
Address: 2231 La Mirada Drive Vista, CA 92081
Phone: 760-727-8700 Fax: 760-727-8702 Email: mainoffice@pave-tech.com
Services needed: Pave-Tech Inc. is seeking certified and qualified DVBE subcontractors and/or supplier for services to all items of work including: lead compliance plan, construction area signs, traffic control, portable CMS, job site management, water pollution control program, sweeping, trucking/hauling, disposal and material suppliers for Caltrans Contract 03-1G1304, for construction on state highway in Yolo, Sacramento and Placer Counties from Solano County Line to 0.2 mile East of Route 80/174 separation. Pave-Tech Inc. is an Equal Opportunity Employer. Pave-Tech has union labor agreements. Assistance is available in obtaining bonds, lines of credit, insurance or other technical information. Plans and Specifications are available from owner. Please contact our office at 760-727-8700 for more information. Certification must be faxed to 760-727-8702. Sub-contractors must be registered with the Department of Industrial relations and have a DIR number prior to the bid.
Requirements:
Date posted: 01/25/2018
Contractor: Pave-Tech Inc. Contact: Daniel Zavalani
Address: 2231 La Mirada Drive Vista, CA 92081
Phone: 760-727-8700 Fax: 760-727-8702 Email: mainoffice@pave-tech.com
Services needed: Pave-Tech Inc. is seeking certified and qualified DVBE subcontractors and/or supplier for services to all items of work including: lead compliance plan, construction area signs, traffic control, portable CMS, job site management, water pollution control program, sweeping, trucking/hauling, disposal and material suppliers for Caltrans Contract 10-1H8404, for construction on state highway in Stanislaus County in and near Turlock and Modesto from Merced County line to San Joaquin County line. Pave-Tech Inc. is an Equal Opportunity Employer. Pave-Tech has union labor agreements. Assistance is available in obtaining bonds, lines of credit, insurance or other technical information. Plans and Specifications are available from owner. Please contact our office at 760-727-8700 for more information. Certification must be faxed to 760-727-8702. Sub-contractors must be registered with the Department of Industrial relations and have a DIR number prior to the bid.
Requirements:
Date posted: 01/25/2018
Contractor: Pave-Tech Inc. Contact: Daniel Zavalani
Address: 2231 La Mirada Drive Vista, CA 92081
Phone: 760-727-8700 Fax: 760-727-8702 Email: mainoffice@pave-tech.com
Services needed: Pave-Tech Inc. is seeking certified and qualified DVBE subcontractors and/or supplier for services to all items of work including: lead compliance plan, construction area signs, traffic control, portable CMS, job site management, water pollution control program, sweeping, trucking/hauling, disposal and material suppliers for Caltrans Contract 03-1G1204, for construction on state highway in Colusa, Glenn, Sacramento and Yolo Counties at various locations. Pave-Tech Inc. is an Equal Opportunity Employer. Pave-Tech has union labor agreements. Assistance is available in obtaining bonds, lines of credit, insurance or other technical information. Plans and Specifications are available from owner. Please contact our office at 760-727-8700 for more information. Certification must be faxed to 760-727-8702. Sub-contractors must be registered with the Department of Industrial relations and have a DIR number prior to the bid.
Requirements:
Date posted: 01/25/2018
Contractor: Pave-Tech Inc. Contact: Daniel Zavalani
Address: 2231 La Mirada Drive Vista, CA 92081
Phone: 760-727-8700 Fax: 760-727-8702 Email: mainoffice@pave-tech.com
Services needed: Pave-Tech Inc. is seeking certified and qualified DVBE subcontractors and/or supplier for services to all items of work including: lead compliance plan, construction area signs, traffic control, portable CMS, job site management, water pollution control program, sweeping, trucking/hauling, disposal and material suppliers for Caltrans Contract 12-0R0704, for construction on state highway in Orange County in San Clemente, San Juan Capistrano, Mission Viejo, Laguna Niguel, Laguna Hills, Lake Forest, Irvine, Tustin, Santa Ana, Anaheim, Fullerton and Buena Park from San Diego to Los Angeles County line. Pave-Tech Inc. is an Equal Opportunity Employer. Pave-Tech has union labor agreements. Assistance is available in obtaining bonds, lines of credit, insurance or other technical information. Plans and Specifications are available from owner. Please contact our office at 760-727-8700 for more information. Certification must be faxed to 760-727-8702. Sub-contractors must be registered with the Department of Industrial relations and have a DIR number prior to the bid.
Requirements:
Date posted: 01/25/2018
Contractor: Pave-Tech Inc. Contact: Daniel Zavalani
Address: 2231 La Mirada Drive Vista, CA 92081
Phone: 760-727-8700 Fax: 760-727-8702 Email: mainoffice@pave-tech.com
Services needed: Pave-Tech Inc. is seeking certified and qualified DVBE subcontractors and/or supplier for services to all items of work including: lead compliance plan, construction area signs, traffic control, portable CMS, job site management, water pollution control program, sweeping, trucking/hauling, disposal and material suppliers for Caltrans Contract 03-1G1404, for construction on state highway in Sacramento and Sutter Counties at various locations. Pave-Tech Inc. is an Equal Opportunity Employer. Pave-Tech has union labor agreements. Assistance is available in obtaining bonds, lines of credit, insurance or other technical information. Plans and Specifications are available from owner. Please contact our office at 760-727-8700 for more information. Certification must be faxed to 760-727-8702. Sub-contractors must be registered with the Department of Industrial relations and have a DIR number prior to the bid.
Requirements:
Date posted: 01/25/2018
Contractor: Pave-Tech Inc. Contact: Daniel Zavalani
Address: 2231 La Mirada Drive Vista, CA 92081
Phone: 760-727-8700 Fax: 760-727-8702 Email: mainoffice@pave-tech.com
Services needed: Pave-Tech Inc. is seeking certified and qualified DVBE subcontractors and/or supplier for services to all items of work including: lead compliance plan, construction area signs, traffic control, portable CMS, job site management, water pollution control program, sweeping, trucking/hauling, disposal and material suppliers for Caltrans Contract 06-0X5004, for construction on state highway in Fresno, Madera and Tulare Counties at various locations. Pave-Tech Inc. is an Equal Opportunity Employer. Pave-Tech has union labor agreements. Assistance is available in obtaining bonds, lines of credit, insurance or other technical information. Plans and Specifications are available from owner. Please contact our office at 760-727-8700 for more information. Certification must be faxed to 760-727-8702. Sub-contractors must be registered with the Department of Industrial relations and have a DIR number prior to the bid.
Requirements:
Date posted: 01/25/2018
Contractor: Pave-Tech Inc. Contact: Daniel Zavalani
Address: 2231 La Mirada Drive Vista, CA 92081
Phone: 760-727-8700 Fax: 760-727-8702 Email: mainoffice@pave-tech.com
Services needed: Pave-Tech Inc. is seeking certified and qualified DVBE subcontractors and/or supplier for services to all items of work including: lead compliance plan, construction area signs, traffic control, portable CMS, job site management, water pollution control program, sweeping, trucking/hauling, disposal and material suppliers for Caltrans Contract 06-0X4604, for construction on state highway in Kern County near Lebec from Los Angeles County line to 0.4 mile North of Route 5/99 separation and from Kern River utility road overcrossing to Kings County line. Pave-Tech Inc. is an Equal Opportunity Employer. Pave-Tech has union labor agreements. Assistance is available in obtaining bonds, lines of credit, insurance or other technical information. Plans and Specifications are available from owner. Please contact our office at 760-727-8700 for more information. Certification must be faxed to 760-727-8702. Sub-contractors must be registered with the Department of Industrial relations and have a DIR number prior to the bid.
Requirements:
Date posted: 01/25/2018
Contractor: Pave-Tech Inc. Contact: Daniel Zavalani
Address: 2231 La Mirada Drive Vista, CA 92081
Phone: 760-727-8700 Fax: 760-727-8702 Email: mainoffice@pave-tech.com
Services needed: Pave-Tech Inc. is seeking certified and qualified DVBE subcontractors and/or supplier for services to all items of work including: lead compliance plan, construction area signs, traffic control, portable CMS, job site management, water pollution control program, sweeping, trucking/hauling, disposal and material suppliers for Caltrans Contract 03-1G1904, for construction on state highway in Placer, Nevada and Sierra Counties from 0.2 mile East of route 80/174 separation to Nevada State line. Pave-Tech Inc. is an Equal Opportunity Employer. Pave-Tech has union labor agreements. Assistance is available in obtaining bonds, lines of credit, insurance or other technical information. Plans and Specifications are available from owner. Please contact our office at 760-727-8700 for more information. Certification must be faxed to 760-727-8702. Sub-contractors must be registered with the Department of Industrial relations and have a DIR number prior to the bid.
Requirements:
Date posted: 01/25/2018
Contractor: Myers and Sons Construction, LP Contact: Joe Goehring
Address: 4600 Northgate Blvd., Suite 100 Sacramento, CA 95834
Phone: 916-283-9950 Fax: 916-614-9520 Email: jgoehring@myers-sons.com
Services needed:
Requirements:
Date posted: 01/26/2018
Contractor: Myers and Sons Construction, LP Contact: Joe Goehring
Address: 4600 Northgate Blvd., Suite 100 Sacramento, CA 95834
Phone: 916-283-9950 Fax: 916-614-9520 Email: jgoehring@myers-sons.com
Services needed:
Requirements:
Date posted: 01/26/2018
Contractor: Myers and Sons Construction, LP Contact: Joe Goehring
Address: 4600 Northgate Blvd., Suite 100 Sacramento, CA 95834
Phone: 916-283-9950 Fax: 916-614-9520 Email: jgoehring@myers-sons.com
Services needed:
Requirements:
Date posted: 01/26/2018
Contractor: Myers and Sons Construction, LP Contact: Joe Goehring
Address: 4600 Northgate Blvd., Suite 100 Sacramento, CA 95834
Phone: 916-283-9950 Fax: 916-614-9520 Email: jgoehring@myers-sons.com
Services needed:
Requirements:
Date posted: 01/26/2018
Contractor: Myers and Sons Construction, LP Contact: Joe Goehring
Address: 4600 Northgate Blvd., Suite 100 Sacramento, CA 95834
Phone: 916-283-9950 Fax: 916-614-9520 Email: jgoehring@myers-sons.com
Services needed:
Requirements:
Date posted: 01/26/2018
Contractor: Ames Construction, Inc. Contact: Chris Acosta
Address: 391 N. Main Street, Suite 302 Corona, CA 92880
Phone: 951-356-1275 Fax: 951-549-9003 Email: jenniferlewis@amesco.com
Services needed: DBE Subs/Suppliers required include but are not limited to: Lead compliance plan, develop water supply, construction area signs, traffic control, objects and markers, PCMS, traffic screen, SWPPP, REAP, soil amendments, erosion control, street sweep, treated wood base, Biologist, demo, clear & grub, aggregates, concrete supply, dust palliative, excavation, imported borrow, plant establishment, duff, HMA dike, A.C. paving, structural concrete, rebar, pipe supply, CSP/BCCSP, structural steel, steel flared end section, rock slope protection, minor concrete, survey monument, fencing, vegetation control, survey, guardrail, misc. iron & steel, cable and transition railing. Ames intends to conduct itself in good faith with DBE firms for participation on this project. Ames will work with subcontractors to breakdown items into economical feasible packages.
Requirements: Ames will require bidder to provide performance and payment bonds for the full amount of the Subcontract values. Costs of the bonds are to be provided as a separate line item. Please call to discuss how Ames Construction, Inc. can assist you in your bonding, credit and/or insurance needs. Also, let us know if you need assistance in obtaining necessary equipment, supplies, or materials for this project. We are an equal opportunity employer. Ames? Subcontract terms and conditions will apply to any contracts resulting from this request. The Subcontractor, by submission of its bid, agrees to the ?Terms and Conditions? including all Exhibits and Attachments of Ames Subcontract Agreement. Ames reserves the right to accept or reject any or all quotations. Pricing submitted to Ames construction, Inc. for this project must be valid for the same duration as specified by Owner for award of contract. Our contact for this project is Chris Acosta. He can be reached at (951) 356-1275. Please fax quotes to (951) 549-9003.He will also be the contact if you need assistance downloading plans and specifications.
Date posted: 01/26/2018
Contractor: YAKAR Contact: Joseph
Address: 689 East San bernardio Rd Covina, CA 91723
Phone: 909-599-1612 Fax: 800-750-9094 Email: joseph@yakarinc.com
Services needed: YAKAR is requesting quotes from all qualified subcontractors and suppliers including certified DBE/SBE/DVBE firms for the following items of work including but not limited to: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TEMPORARY PAVEMENT MARKING (PAINT), TEMPORARY TRAFFIC STRIPE (PAINT), CHANNELIZER (SURFACE MOUNTED), TEMPORARY PAVEMENT MARKER, TEMPORARY RAILING (TYPE K), TEMPORARY CRASH CUSHION MODULE, ALTERNATIVE TEMPORARY CRASH CUSHION, JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM, RAIN EVENT ACTION PLAN, STORM WATER ANNUAL REPORT, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY GRAVEL BAG BERM, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, TREATED WOOD WASTE, 60" CAST-IN-DRILLED-HOLE CONCRETE PILE (SIGN FOUNDATION), FURNISH SIGN STRUCTURE (TRUSS), INSTALL SIGN STRUCTURE (TRUSS), REMOVE BRIDGE MOUNTED SIGN, REMOVE ASPHALT CONCRETE SURFACING, REMOVE CONCRETE DECK SURFACE, PREPARE CONCRETE BRIDGE DECK SURFACE, FURNISH POLYESTER CONCRETE OVERLAY, PLACE POLYESTER CONCRETE OVERLAY, BRIDGE REMOVAL (PORTION), LOCATION A, BRIDGE REMOVAL (PORTION), LOCATION B, DETECTABLE WARNING SURFACE, MINOR CONCRETE (CURB, SIDEWALK AND CURB RAMP), REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY), PRE/POST CONSTRUCTION SURVEYS, MANHOLE FRAME AND COVER, MISCELLANEOUS METAL (BRIDGE), MODIFYING EXISTING SIGNAL AND LIGHTING SYSTEM (CITY), REMOVE PAVEMENT MARKER, PAVEMENT MARKER (RETROREFLECTIVE), REMOVE ROADSIDE SIGN, FURNISH FORMED PANEL SIGN(OVERHEAD) FOR RETROREFLECTIVE SHEETING(TYPE XI), FURNISH LAMINATED PANEL SIGN(1"-TYPE A) FOR RETROREFLECTIVE SHEETING(TYPE XI), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED) FOR RETROREFLECTIVE SHEETING(TYPE XI), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-FRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI), RETROREFLECTIVE , SHEETING (TYPE XI), ROADSIDE SIGN - ONE POST, ROADSIDE SIGN - TWO POST, INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD), INSTALL SIGN PANEL ON EXISTING FRAME, INSTALL ROADSIDE SIGN PANEL ON EXISTING POST, CHAIN LINK RAILING TYPE 3, TUBULAR HANDRAILING, CONCRETE BARRIER (TYPE 732SW MODIFIED), SALVAGE METAL BRIDGE RAILING, 6" THERMOPLASTIC TRAFFIC STRIPE, 8" THERMOPLASTIC TRAFFIC STRIPE, THERMOPLASTIC PAVEMENT MARKING, 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 6-1), 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 17-7), REMOVE THERMOPLASTIC TRAFFIC STRIPE, REMOVE THERMOPLASTIC PAVEMENT MARKING, TEMPORARY LIGHTING SYSTEM, MODIFYING EXISTING ELECTRICAL SYSTEM, & MOBILIZATION.
Requirements: Plans and Specifications (Contract documents) are available in electronic format at: Caltrans Website http://www.dot.ca.gov/hq/esc/oe/weekly_ads/index.php under Advertised Projects. We can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, line of credit, insurance, equipment, supplies, materials or related assistance in services, please contact our office. Subcontractors must possess a current contractor's license, insurance and worker's compensation coverage meeting Caltrans requirements and may be required to sign YAKAR Subcontract Agreement. Subcontractors must also be registered with the Department of Industrial Relations (DIR) pursuant to the Labor Code section 1725.5. YAKAR is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color. creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. YAKAR intends to work cooperatively with all qualified firms seeking work on this project. Please use the following page to respond, indicating your interest in the project. This will aid in completing the good faith effort required for this project. If you have any questions or need any additional Information, please contact our office at (909)599-1612 or email joseph@yakarinc.com Date posted: 1-29-18
Date posted: 01/29/2018
Contractor: Pave-Tech Inc. Contact: Daniel Zavalani
Address: 2231 La Mirada Drive Vista, CA 92081
Phone: 760-727-8700 Fax: 760-727-8702 Email: mainoffice@pave-tech.com
Services needed: Pave-Tech Inc. is seeking certified and qualified DVBE subcontractors and/or supplier for services to all items of work including: lead compliance plan, construction area signs, traffic control, portable CMS, job site management, water pollution control program, sweeping, trucking/hauling, disposal and material suppliers for Caltrans Contract 11-2N0154, In San Diego County from Main Street undercrossing to 0.3 mile North or Route 56. Pave-Tech Inc. is an Equal Opportunity Employer. Pave-Tech has union labor agreements. Assistance is available in obtaining bonds, lines of credit, insurance or other technical information. Plans and Specifications are available from owner. Please contact our office at 760-727-8700 for more information. Certification must be faxed to 760-727-8702. Sub-contractors must be registered with the Department of Industrial relations and have a DIR number prior to the bid.
Requirements:
Date posted: 01/29/2018
Contractor: Pave-Tech Inc. Contact: Daniel Zavalani
Address: 2231 La Mirada Drive Vista, CA 92081
Phone: 760-727-8700 Fax: 760-727-8702 Email: mainoffice@pave-tech.com
Services needed: Pave-Tech Inc. is seeking certified and qualified DVBE subcontractors and/or supplier for services to all items of work including: lead compliance plan, construction area signs, traffic control, portable CMS, job site management, water pollution control program, sweeping, trucking/hauling, disposal and material suppliers for Caltrans Contract 08-1J3504, In Riverside and San Bernardino County from San Diego County line to 0.4 mile North of El Cerrito Road and from Route 15/60 separation to Nevada State line. Pave-Tech Inc. is an Equal Opportunity Employer. Pave-Tech has union labor agreements. Assistance is available in obtaining bonds, lines of credit, insurance or other technical information. Plans and Specifications are available from owner. Please contact our office at 760-727-8700 for more information. Certification must be faxed to 760-727-8702. Sub-contractors must be registered with the Department of Industrial relations and have a DIR number prior to the bid.
Requirements:
Date posted: 01/29/2018
Contractor: Myers and Sons Construction, LP Contact: Joe Goehring
Address: 4600 Northgate Blvd., Suite 100 Sacramento, CA 95834
Phone: 916-283-9950 Fax: 916-614-9520 Email: jgoehring@myers-sons.com
Services needed:
Requirements:
Date posted: 01/29/2018
Contractor: Steelhead Constructors, Inc Contact: Kelly Knight
Address: 2940 Innsbruck Drive Redding, CA 96003
Phone: 5302266400 Fax: 5302266401 Email: kelly@steelheadconstructors.com
Services needed: We are requesting quotes from all qualified subcontractors and suppliers, including all certified DVBE/DBE/MBE/WBE/MB subcontractors. We are soliciting quotes for (including but not limited to): Hot Mix Asphalt (Type A), Soil Nail, Bar Reinforcing Steel, Sculpted Shotcrete, Structural Shotcrete, Prepare and Stain Shotcrete, Midwest Guardrail System (Steel Post), Vegetation Control (Minor Concrete), Cable Railing, Alternative Flared Terminal System, Type Soft Stop Terminal System, and Concrete Barrier (Type 60D Modified). The quotations may be broken down into comparable units as reasonably necessary. Steelhead will work with suppliers and subcontractors to identify opportunities and break down items into economically feasible units.
Requirements: Steelhead Constructors, Inc. (Steelhead) will be bidding the referenced project as a prime contractor. Plans and specifications for this project may be viewed on the Caltrans Site, at your local builder?s exchange and are available for review in our office. If you require additional information regarding the requirements of the contract, please don?t hesitate to call our office. In order that we may give your bid maximum consideration, please supply us with an email or FAX letter prior to the bid describing the scope of your work. Steelhead is an Equal Employment Opportunity Employer. We encourage and actively solicit proposals from DVBE, DBE, MBE, WBE, DBE and MB subcontractors and suppliers on all our projects. All qualified DVBE, DBE, MBE, WBE, and MB subcontractors must be registered and certified by the California Department of Transportation. Steelhead is signatory to Operating Engineers, Laborers, Carpenters and Cement Masons Unions. All subcontractors must possess a current contractor?s license, insurance, and workers? compensation coverage meeting Steelhead?s requirements and will be required to sign Steelhead?s Subcontract Agreement. Performance and payment bonds up to 100% may be required for the full amount of the subcontract price. Prior to the bid, upon request, you can contact our office if you require assistance in bonding, lines of credit, insurance, obtaining necessary equipment, supplies, materials or services, establishing delivery schedules, etc., which may be required by the Owner. Please contact our office and advise us if you are interested in this project. When submitting any bid on a public works project, please prominently include, on your quote, your California Contractors License Number and Department of Industrial Relations Number. More information regarding California Contractors License and DIR Numbers can be found at http://www.cslb.ca.gov/ and http://www.dir.ca.gov/Public-Works/PublicWorks.html Sincerely, STEELHEAD CONSTRUCTORS, INC.
Date posted: 01/29/2018
Contractor: Agee Construction Corporation Contact: Marcie Daves
Address: 1039 Hoblitt Ave. Clovis, CA 93612
Phone: 559-299-3290 Fax: 559-299-3503 Email: marcied@ageeconstruction.com
Services needed: Agee Construction is requesting bids from all qualified subcontractors and suppliers including certified DVBE subcontractors for, but not limited to: Lead Compliance Plan, SWPPP Materials, Water Pollution Control Plan, AC Grindings, Cold Plane Asphalt, Street Sweeping, Material Testing, Construction Area Signs (CAS), Delineator, Striping, Striping Removal, Traffic Control, Traffic Loops, Survey Monuments and Trucking. For a complete bid schedule, call or email as noted above. Please contact our office if further assistance is needed or to view Plans and Specification and Drawings at our Clovis office.
Requirements: Subcontractors may be required to obtain 100% Payment and 100% Performance with bond premiums paid up to 1.5%. Appropriate license will be required as well as insurance, including workers compensation. Agee Construction will assist with obtaining bonds and reviewing other subcontractor requirements such as safety policies, insurance, certified payroll, prevailing wage requirements, and union requirements. Agee Construction is an Equal Opportunity Employer.
Date posted: 01/29/2018
Contractor: Pave-Tech Inc. Contact: Daniel Zavalani
Address: 2231 La Mirada Drive Vista, CA 92081
Phone: 760-727-8700 Fax: 760-727-8702 Email: mainoffice@pave-tech.com
Services needed: Pave-Tech Inc. is seeking certified and qualified DVBE subcontractors and/or supplier for services to all items of work including: lead compliance plan, construction area signs, traffic control, portable CMS, job site management, water pollution control program, sweeping, trucking/hauling, disposal and material suppliers for Caltrans Contract 01-0H7304, In Del Norte and Humboldt Counties at various locations. Pave-Tech Inc. is an Equal Opportunity Employer. Pave-Tech has union labor agreements. Assistance is available in obtaining bonds, lines of credit, insurance or other technical information. Plans and Specifications are available from owner. Please contact our office at 760-727-8700 for more information. Certification must be faxed to 760-727-8702. Sub-contractors must be registered with the Department of Industrial relations and have a DIR number prior to the bid.
Requirements:
Date posted: 01/29/2018
Contractor: Agee Construction Corporation Contact: Marcie Daves
Address: 1039 Hoblitt Ave. Clovis, CA 93612
Phone: 559-299-3290 Fax: 559-299-3503 Email: marcied@ageeconstruction.com
Services needed: Agee Construction is requesting bids from all qualified subcontractors and suppliers including certified DBE subcontractors for, but not limited to: Clearing and Grubbing, Saw Cutting, Chain Link Fence (CL Fence), SWPPP, SWPPP Materials, Erosion Control, Hydroseed, AC Grindings, Material Testing, Jointed Plane Concrete Pavement, Reinforcing Steel, Channelizer, Construction Area Signs (CAS), K-Rail, Striping, Striping Removal, Traffic Control, Type III Barricade, Electrical and Trucking. For a complete bid schedule, call or email as noted above. Please contact our office if further assistance is needed or to view Plans and Specification and Drawings at our Clovis office.
Requirements: Subcontractors may be required to obtain 100% Payment and 100% Performance with bond premiums paid up to 1.5%. Appropriate license will be required as well as insurance, including workers compensation. Agee Construction will assist with obtaining bonds and reviewing other subcontractor requirements such as safety policies, insurance, certified payroll, prevailing wage requirements, and union requirements. Agee Construction is an Equal Opportunity Employer.
Date posted: 01/29/2018
Contractor: Peterson Chase General Engineering Construction Inc. Contact: Kali Goglanian
Address: 16351 Construction Circle West Irvine, CA 92606
Phone: 949-252-0441 Fax: 949-252-0266 Email: bids@petersonchase.com
Services needed: Peterson-Chase General Engineering Construction, Inc. is requesting quotes from all qualified subcontractors and suppliers including certified DVBE firms for the following items of work, including but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign (Ls), Job Site Management, Prepare Water Pollution Control Program, Street Sweeping, Temporary Concrete Washout, Remove Yellow Thermoplastic Traffic Stripe (Hazardous Waste), Noise Monitoring, Hot Mix Asphalt (Type A), Tack Coat, Cold Plane Asphalt Concrete Pavement, Structural Concrete, Approach Slab (Type R), Structural Concrete, Approach Slab (Repair), Paving Notch Extension, Clean Expansion Joint, Joint Seal (Mr 1"), Remove Concrete Deck Surface, Remove Unsound Concrete, Prepare Concrete Bridge Deck Surface, Furnish Polyester Concrete Overlay, Place Polyester Concrete Overlay, Treat Bridge Deck, Furnish Bridge Deck Treatment Material, Paint Bridge Identification, Remove Pavement Marker, Pavement Marker (Retroreflective), Thermoplastic Pavement Marking (Enhanced Wet Night Visibility), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 36-12), 2" Paint Traffic Stripe (2-Coat), 6" Paint Traffic Stripe (2-Coat), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), 8" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), 8" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 12-3), Remove Thermoplastic Traffic Stripe, Remove Thermoplastic Pavement Marking. Please email your quotes to Bids@petersonchase.com
Requirements: Peterson-Chase General Engineering Construction Inc. can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Dick Vogels at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Caltrans? requirements and will be required to sign the standard Peterson-Chase GEC., Inc. Subcontract Agreement. Plans and specifications are available to be viewed in our office located at 16351 Construction Circle West, Irvine, CA 92606, between 8:00 AM and 3:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Peterson-Chase GEC., Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. Peterson Chase General Engineering Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.
Date posted: 01/29/2018
Contractor: Future DB International Inc. Contact: Future DB International Inc.
Address: 20941 Bake Pkwy, Suite 102 Lake Forest, CA 92630
Phone: 949-390-2110 Fax: 949-732-4355 Email: estimating@futuredbi.com
Services needed: Future DB is requesting bids from qualified subcontractors and suppliers including DBEs for the following items of work, including but not limited to: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TEMPORARY PAVEMENT MARKING (PAINT), TEMPORARY TRAFFIC STRIPE (PAINT), CHANNELIZER (SURFACE MOUNTED), TEMPORARY PAVEMENT MARKER, TEMPORARY RAILING (TYPE K), TEMPORARY CRASH CUSHION MODULE, ALTERNATIVE TEMPORARY CRASH CUSHION, JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM, RAIN EVENT ACTION PLAN, STORM WATER ANNUAL REPORT, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY GRAVEL BAG BERM, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, TREATED WOOD WASTE, 60" CAST-IN-DRILLED-HOLE CONCRETE PILE (SIGN FOUNDATION), FURNISH SIGN STRUCTURE (TRUSS), INSTALL SIGN STRUCTURE (TRUSS), REMOVE BRIDGE MOUNTED SIGN, REMOVE ASPHALT CONCRETE SURFACING, REMOVE CONCRETE DECK SURFACE, PREPARE CONCRETE BRIDGE DECK SURFACE, FURNISH POLYESTER CONCRETE OVERLAY, PLACE POLYESTER CONCRETE OVERLAY, BRIDGE REMOVAL (PORTION), DETECTABLE WARNING SURFACE, MINOR CONCRETE (CURB, SIDEWALK AND CURB RAMP), REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY), PRE/POST CONSTRUCTION SURVEYS, MANHOLE FRAME AND COVER, MISCELLANEOUS METAL (BRIDGE), MODIFYING EXISTING SIGNAL AND LIGHTING SYSTEM (CITY), REMOVE PAVEMENT MARKER, PAVEMENT MARKER (RETROREFLECTIVE), REMOVE ROADSIDE SIGN, FURNISH FORMED PANEL SIGN(OVERHEAD) FOR RETROREFLECTIVE SHEETING(TYPE XI), FURNISH LAMINATED PANEL SIGN(1"-TYPE A) FOR RETROREFLECTIVE SHEETING(TYPE XI), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED) FOR RETROREFLECTIVE SHEETING(TYPE XI), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-FRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI), RETROREFLECTIVE SHEETING (TYPE XI), ROADSIDE SIGN - ONE POST, ROADSIDE SIGN - TWO POST, INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD), INSTALL SIGN PANEL ON EXISTING FRAME, INSTALL ROADSIDE SIGN PANEL ON EXISTING POST, CHAIN LINK RAILING TYPE 3, TUBULAR HANDRAILING, CONCRETE BARRIER (TYPE 732SW MODIFIED), SALVAGE METAL BRIDGE RAILING, 6" THERMOPLASTIC TRAFFIC STRIPE, 8" THERMOPLASTIC TRAFFIC STRIPE, THERMOPLASTIC PAVEMENT MARKING, 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 6-1), 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 17-7), REMOVE THERMOPLASTIC TRAFFIC STRIPE, REMOVE THERMOPLASTIC PAVEMENT MARKING, TEMPORARY LIGHTING SYSTEM, MODIFYING EXISTING ELECTRICAL SYSTEM, MOBILIZATION
Requirements: We are an equal opportunity employer. Subcontractors must possess a current contractor's license, insurance and Worker's Compensation Insurance coverage meeting the requirements and will be required to sign a subcontract agreement. 100% Payment and Performance Bonds may be required. Future DB will provide assistance in Bonding, Insurance, Equipment, Supplies and Material if necessary. Plans and specifications are available for viewing at: https://futuredbinternationalinc.box.com/s/0n1s59s26vlnz8s7dw0igftl6xylsd22
Date posted: 01/29/2018
Contractor: HighLand Construction, Inc. Contact: Erin Richardson
Address: 133 N. Pixley St., Orange, CA 92868
Phone: 714-538-5156 Fax: 714-538-5157 Email: highlandinc@att.net
Services needed: HighLand Construction is requesting quotes from all qualified subcontractors and suppliers including certified DBE/SBE/DVBE firms for the following items of work, including but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, CPM, Temporary BMPs, WPCP, Roadway Excavation, LCB Rapid Set, Prepaving Inertial Profiler, HMA(Type A), Data Core, Place HMA, Tack Coat, Cold Plane AC Pavement, Minor Concrete (RSC), Detectable Warning Surface, Minor Concrete, Remove Concrete, Pre/Post Construction Survey, Object Marker, Pavement Marker, Relocate Signs, Midwest Guardrail, Vegetation Control, Thermoplastic Striping, Modify Existing Electrical System.
Requirements: We can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact our office. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Owners? requirements and will be required to sign HighLand Construction?s Subcontract Agreement. Plans and specifications are available to be viewed in our office located at 133 North Pixley Street, Orange, CA 92868, between 8:00 AM and 3:00 PM Monday through Friday by appointment. Please call Erin Richardson at 714-538-5156. HighLand Construction, Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. HighLand Construction intends to work cooperatively with all qualified firms seeking work on this project.
Date posted: 01/29/2018
Contractor: Peterson Chase General Engineering Construction Inc. Contact: Kali Goglanian
Address: 16351 Construction Circle West Irvine, CA 92606
Phone: 949-252-0441 Fax: 949-252-0266 Email: bids@petersonchase.com
Services needed: Peterson-Chase General Engineering Construction, Inc. is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Channelizer (Surface Mounted), Temporary Railing (Type K), Temporary Crash Cushion Module, Job Site Management, Prepare Water Pollution Control Program, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Gravel Bag Berm, Temporary Impermeable Membrane,Temporary Construction Entrance, Temporary Concrete Washout, Water Quality Sampling And Analysis Day, Water Quality Monitoring Report, Water Quality Annual Report, Remove Yellow Thermoplastic Traffic Stripe (Hazardous Waste), Work Area Monitoring (Bridge), Treated Wood Waste, Clearing And Grubbing (Ls), Roadway Excavation, Roadway Excavation (Type Z-2) (Aerially Deposited Lead), Structure Excavation (Bridge), Structure Excavation (Retaining Wall), Structure Excavation (Type Z-2) (Aerially Deposited Lead), Structure Backfill (Bridge), Structure Backfill (Retaining Wall), Subgrade Enhancement Geogrid, Roadside Clearing, Prune Existing Plants, Packet Fertilizer, Plant (Group A), Plant (Group B), Plant (Group U), Plant Establishment Work, Wood Mulch, Control And Neutral Conductors, 1 1/2" Remote Control Valve, 2" Galvanized Steel Pipe (Supply Line On Bridge), Riser Sprinkler Assembly, 2" Gate Valve, 3/4" Plastic Pipe (Schedule 40) (Supply Line), 1" Plastic Pipe (Schedule 40) (Supply Line), 1 1/4" Plastic Pipe (Schedule 40) (Supply Line), 1 1/2" Plastic Pipe (Schedule 40) (Supply Line), 2" Plastic Pipe (Schedule 40) (Supply Line), 2 1/2" Plastic Pipe (Schedule 40) (Supply Line), Ball Valve, 8" Corrugated High Density Polyethylene Pipe Conduit, Class 3 Aggregate Base (Cy), Lean Concrete Base, Hot Mix Asphalt (Type A), Rubberized Hot Mix Asphalt (Gap Graded), Tack Coat, Furnish Steel Piling (Hp 10 X 57), Drive Steel Pile (Hp 10 X 57), 16" Cast-In-Drilled-Hole Concrete Piling, Structural Concrete, Bridge Footing, Structural Concrete, Bridge, Structural Concrete, Bridge (Polymer Fiber), Structural Concrete, Retaining Wall, Structural Concrete, Drainage Inlet, Minor Concrete (Backfill), Drill And Bond Dowel, Clean Expansion Joint, Joint Seal (Mr 1"), Bar Reinforcing Steel (Bridge), Bar Reinforcing Steel (Retaining Wall), Furnish Structural Steel (Bridge), Erect Structural Steel (Bridge), Clean And Paint Structural Steel, Spot Blast Clean And Paint Undercoat, Bridge Removal (Portion), 18" Reinforced Concrete Pipe, 24" Reinforced Concrete Pipe, 18" Slotted Corrugated Steel Pipe (.079" Thick), Grated Line Drain, Remove Pipe (Lf), Remove Inlet, Remove Concrete Sidewalk (Sqyd), Remove Concrete (Curb And Gutter), Miscellaneous Iron And Steel, Miscellaneous Metal (Bridge), Miscellaneous Metal (Retaining Wall), Lighting (City Street), Chain Link Fence (Type Cl-6), Remove Fence, Remove Pavement Marker, Guard Railing Delineator, Pavement Marker (Retroreflective), Remove Roadside Sign, Furnish Single Sheet Aluminum Sign (0.063"-Unframed) For Retroreflective Sheeting(Type Xi), Retroreflective Sheeting (Type Xi), Roadside Sign - One Post, Midwest Guardrail System (Wood Post), Vegetation Control (Minor Concrete), Transition Railing (Type Wb-31), Alternative Flared Terminal System, Concrete Barrier (Type 736a Modified), Concrete Barrier (Type 736b), Concrete Barrier (Type 736b Mod), Concrete Barrier (Type 736sv Mod), California St-10 Bridge Rail (Modified), Remove Guardrail, Salvage Metal Bridge Railing, Remove Concrete Barrier, 6" Thermoplastic Traffic Stripe, 8" Thermoplastic Traffic Stripe, Thermoplastic Pavement Marking, Paint Traffic Stripe (2-Coat), Remove Thermoplastic Traffic Stripe, Maintaining Existing Traffic Management System Elements During Construction, Modifying Existing Electrical System. Please email your quotes to Bids@petersonchase.com
Requirements: Peterson-Chase General Engineering Construction Inc. can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Dick Vogels at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Caltrans? requirements and will be required to sign the standard Peterson-Chase GEC., Inc. Subcontract Agreement. Plans and specifications are available to be viewed in our office located at 16351 Construction Circle West, Irvine, CA 92606, between 8:00 AM and 3:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Peterson-Chase GEC., Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. Peterson Chase General Engineering Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.
Date posted: 01/29/2018
Contractor: Future DB International Inc. Contact: Future DB International Inc.
Address: 20941 Bake Pkwy, Suite 102 Lake Forest, CA 92630
Phone: 949-390-2110 Fax: 949-732-4355 Email: estimating@futuredbi.com
Services needed: Future DB is requesting bids from qualified subcontractors and suppliers including DVBEs for the following items of work, including but not limited to: CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN (LS), JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM, REMOVE PAVEMENT MARKER, PAVEMENT MARKER (RETROREFLECTIVE), CONCRETE BARRIER MARKER, THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12), PAINT TRAFFIC STRIPE (2-COAT), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3), REMOVE THERMOPLASTIC TRAFFIC STRIPE, REMOVE THERMOPLASTIC PAVEMENT MARKING, 6" TRAFFIC STRIPE TAPE (BROKEN 17-7) (WARRANTY), 6" TRAFFIC STRIPE TAPE (BROKEN 36-12) (WARRANTY), 8" TRAFFIC STRIPE TAPE (BROKEN 12-3) (WARRANTY), 8" TRAFFIC STRIPE TAPE (BROKEN 36-12) (WARRANTY), MOBILIZATION.
Requirements: We are an equal opportunity employer. Subcontractors must possess a current contractor's license, insurance and Worker's Compensation Insurance coverage meeting the requirements and will be required to sign a subcontract agreement. 100% Payment and Performance Bonds may be required. Future DB will provide assistance in Bonding, Insurance, Equipment, Supplies and Material if necessary. Plans and specifications are available for viewing at: https://futuredbinternationalinc.box.com/s/84kvlf8sb94cssdfxtfyi1x5b8hqqwvs
Date posted: 01/29/2018
Contractor: HighLand Construction, Inc. Contact: Erin Richardson
Address: 133 N. Pixley St., Orange, CA 92868
Phone: 714-538-5156 Fax: 714-538-5157 Email: highlandinc@att.net
Services needed: HighLand Construction is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, CPM, Temporary BMPs, WPCP, Water Quality Reports, Remove Striping, K-Rail, Treated Wood Waste, Clearing and Grubbing, Roadway Excavation, Roadway Ex- ADL, Structure Ex, Structure Backfill, Roadside Clearing, Prune Existing Plans, Plants (Group A, B and U), Plant Establishment, Wood Mulch, Irrigation, Class 3 Aggregate Base, Lean Concrete Base, HMA (Type A), Rubberized HMA, Tack Coat, Steel Pile, CIDH Piles, Structural Concrete, Minor Concrete, Joint Seal, Drill and Bond Dowel, Rebar, Structural Steel, Clean and Paint Structural Steel, Spot Blast Clean and Paint Undercoat, Reinforced Concrete Pipe, Slotted Corrugated Steel Pipe, Grated Line Drain, Misc. Iron and Steel, Lighting, Chain Link Fence, Guard Railing Delineator, Pavement Marking and Striping, Midwest Guardrail System, Vegetation Control, Transition Railing (Type WB-31), Alternative Flared Terminal System, Concrete Barrier (Type 736A Modified, 736B, 736B MOD, 736SV MOD), CA St-10 Bridge Rail and Modify Existing Electrical System.
Requirements: We can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact our office. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Owners? requirements and will be required to sign HighLand Construction?s Subcontract Agreement. Plans and specifications are available at the following link: http://www.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php and then select the contract # from the drop down menu. Or, they may be viewed in our office. Please call Erin Richardson at 714-538-5156. HighLand Construction, Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. HighLand Construction intends to work cooperatively with all qualified firms seeking work on this project.
Date posted: 01/29/2018
Contractor: Golden State Bridge, Inc. Contact: David Riccitiello
Address: 3701 Mallard Drive Benicia, CA 94510
Phone: 925-372-8000 Fax: 925-372-8001 Email: dave@gsbridge.com
Services needed: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign, Prepare Water Pollution Control Program, Street Sweeping, Temp. Concrete Washout, Remove Yellow Thermoplastic Traffic Stripe, Noise Monitoring, Hot Mix Asphalt (Type A), Tack Coat, Cold Plane Asphalt Concrete Pavement, Structural Concrete, Paving Notch Extension, Clean Expansion Joint, Joint Seal, Remove Concrete Deck Surface, Remove Unsound Concrete, Prepare Concrete Bridge Deck Surface, Furnish and Place Polyester Concrete Overlay, Treat Bridge Deck, Furnish Bridge Deck Treatment Material, Paint Bridge Identification, Remove Pavement marker, Pavement Marker (Retroreflective), Thermoplastic Pavement Marking, 6 in. Thermoplastic Traffic Stripe, 2 in. and 6 in. Paint Traffic Stripe (2-Coat), 6 in. and 8 in. Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), Remove Thermoplastic Traffic Stripe, Remove Thermoplastic Pavement Marking.
Requirements: Please call to discuss how Golden State Bridge, Inc. can assist you in your bonding, credit, and/or insurance needs. Also, let us know if you need assistance in obtaining necessary equipment, supplies, or materials for this project. If you are interested in submitting a subcontractor bid for this project, please fax us your quote at 925-372-8001. Should you have any questions regarding this bid, you may contact David Riccitiello at 925-372-8000 or dave@gsbridge.com. Please be advised, Contractors and subcontractors must register with The D.I.R. (Department of Industrial Relations) in order to bid on public works projects. Registration with The D.I.R. costs $300 and covers the fiscal year (July 1?June 30th). To verify the status of your DIR number, please visit http://www.dir.ca.gov/Public-Works/Contractors.html.
Date posted: 01/29/2018
Contractor: Peterson Chase General Engineering Construction Inc. Contact: Kali Goglanian
Address: 16351 Construction Circle West Irvine, CA 92606
Phone: 949-252-0441 Fax: 949-252-0266 Email: bids@petersonchase.com
Services needed: Peterson-Chase General Engineering Construction, Inc. is requesting quotes from all qualified subcontractors and suppliers including certified DVBE firms for the following items of work, including but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Job Site Management, Prepare Water Pollution Control Program, Remove Sign Structure Walkway (Ea), Remove Roadside Sign (Strap And Saddle Bracket Method), Remove Sign From Sign Frame, Furnish Formed Panel Sign (Overhead) For Retroreflective Sheeting (Type Xi), Furnish Laminated Panel Sign (1"-Type A) For Retroreflective Sheeting (Type Xi), Furnish Single Sheet Aluminum Sign (0.080"-Unframed) For Retroreflective Sheeting (Type Xi), Retroreflective Sheeting (Type Xi), Install Sign (Strap And Saddle Bracket Method), Install Sign Panel On Existing Frame, Maintaining Existing Traffic Management System Elements During Construction, Modifying Existing Electrical System. Please email your quotes to Bids@petersonchase.com
Requirements: Peterson-Chase General Engineering Construction Inc. can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Dick Vogels at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Caltrans? requirements and will be required to sign the standard Peterson-Chase GEC., Inc. Subcontract Agreement. Plans and specifications are available to be viewed in our office located at 16351 Construction Circle West, Irvine, CA 92606, between 8:00 AM and 3:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Peterson-Chase GEC., Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. Peterson Chase General Engineering Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.
Date posted: 01/29/2018
Contractor: Golden State Bridge, Inc. Contact: David Riccitiello
Address: 3701 Mallard Drive Benicia, CA 94510
Phone: 925-372-8000 Fax: 925-372-8001 Email: dave@gsbridge.com
Services needed: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign, Prepare Water Pollution Control Program, Temp. Drainage Inlet Protection, Temp. Concrete Washout, Remove Yellow Thermoplastic Traffic Stripe (Haz. Waste), Structural Concrete; Bridge, Clean Expansion Joint, Joint Seal, Bonded Joint Seal, Bar Reinforcing Steel (Bridge), Rapid Setting Concrete (Patch), Remove Asphalt Concrete Surfacing, Remove Unsound Concrete, Polyester Concrete Expansion Dam, Prepare Concrete Bridge Deck Surface, Treat Bridge Deck, Furnish Bridge Deck Treatment Material, Bridge Removal, Access Door Assembly, Pavement Marker (Retroreflective), 6 in. Permanent Tape Traffic Stripe, 8 in. and 6 in. Permanent Tape Traffic Stripe, Remove Thermoplastic Traffic Stripe.
Requirements: Please call to discuss how Golden State Bridge, Inc. can assist you in your bonding, credit, and/or insurance needs. Also, let us know if you need assistance in obtaining necessary equipment, supplies, or materials for this project. If you are interested in submitting a subcontractor bid for this project, please fax us your quote at 925-372-8001. Should you have any questions regarding this bid, you may contact David Riccitiello at 925-372-8000 or dave@gsbridge.com. Please be advised, Contractors and subcontractors must register with The D.I.R. (Department of Industrial Relations) in order to bid on public works projects. Registration with The D.I.R. costs $300 and covers the fiscal year (July 1?June 30th). To verify the status of your DIR number, please visit http://www.dir.ca.gov/Public-Works/Contractors.html.
Date posted: 01/29/2018
Contractor: Golden State Bridge, Inc. Contact: David Riccitiello
Address: 3701 Mallard Drive Benicia, CA 94510
Phone: 925-372-8000 Fax: 925-372-8001 Email: dave@gsbridge.com
Services needed: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign, Prepare Water Pollution Control Program, Temp. Concrete Washout, Remove Yellow Thermoplastic Traffic Stripe (Haz. Waste), Hot Mix Asphalt (Type A), Tack Coat, Cold Plane Asphalt Concrete Pavement, Structural Concrete; Approach Slab (Type R Modified), Paving Notch Extension, Clean Expansion Joint, Joint Seal, Bonded Joint Seal, Rapid Setting Concrete (Patch), Remove Asphalt Concrete Surfacing, Remove Unsound Concrete, Prepare Concrete Bridge Deck Surface, Furnish and Place Polyester Concrete Overlay, Treat Bridge Deck, Furnish Bridge Deck Treatment Material, Remove Pavement Marker, Pavement Marker (Retroreflective), 6 in. Traffic Stripe Tape, Remove Thermoplastic Traffic Stripe, 6 in. Traffic Stripe Tape with Contrast.
Requirements: Please call to discuss how Golden State Bridge, Inc. can assist you in your bonding, credit, and/or insurance needs. Also, let us know if you need assistance in obtaining necessary equipment, supplies, or materials for this project. If you are interested in submitting a subcontractor bid for this project, please fax us your quote at 925-372-8001. Should you have any questions regarding this bid, you may contact David Riccitiello at 925-372-8000 or dave@gsbridge.com. Please be advised, Contractors and subcontractors must register with The D.I.R. (Department of Industrial Relations) in order to bid on public works projects. Registration with The D.I.R. costs $300 and covers the fiscal year (July 1?June 30th). To verify the status of your DIR number, please visit http://www.dir.ca.gov/Public-Works/Contractors.html.
Date posted: 01/29/2018
Contractor: Las Vegas Paving Contact: Dan Peressini or Jim Witt
Address: 4420 South Decatur Blvd Las Vegas, NV 89103
Phone: 702-251-5800 Fax: 702-257-9436 Email: Dan.Peressini@LasVegasPaving.com and Jim.Witt@LasVegasPaving.com
Services needed: TRUCKING, SWPPP ITEMS, FENCING, LANDSCAPE AND PLANTING ITEMS, IMPORTED BORROW, EROSION CONTROL ITEMS, BOX CULVERT STRUCTURAL CONCRETE, HEADWALL, REINFORCING STEEL, CORRUGATED STEEL PIPE, STRUCTURAL STEEL PLATE PIPE ARCH, CONCRETE COLLARS, FLARED END SECTIONS, ROCK SLOPE PROTECTION, VEGETATION CONTROL (MINOR CONCRETE), SIGNS, DELINEATORS, GUARDRAIL WORK, ANCHOR ASSEMBLY, TRANSITION RAILING, TERMINAL SYSTEMS, REMOVE GUARDRAIL
Requirements: Bid Plans, Specifications and other relevant documents can be downloaded at: Caltrans Website http://www.dot.ca.gov/hq/esc/oe/weekly_ads/index.php under Advertised Projects. LVP can provide documents by another method upon request. Payment and Performance bonds may be required and all subcontractors will be required to sign and agree to LVP?s subcontract and provide required insurance coverage, assistance can be provided if needed. LVP is signatory with the Operating Engineers, Teamsters, Laborers, Cement Masons and Carpenters unions. LVP is an equal opportunity employer. Please pay special attention to the provisions of: CONTRACTOR REGISTRATION REQUIREMENTS: Labor Code Section 1771.1 (a) A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded.
Date posted: 01/29/2018
Contractor: A. Teichert & Son, Inc. dba Teichert Construction Contact: Nathan Rinaldi
Address: 400 Sunrise Avenue, Suite 300 Roseville
Phone: 559-813-3100 Fax: 559-813-3055 Email: NRinaldi@teichert.com
Services needed: Request for qualified bids from Subcontractors, Suppliers & Truckers for the following project: Project: Construction on State Highway in Merced County in and near Merced from South Fork Black Rascal Canal to 0.1 mile South of Oakdale Road ? Contract No. 10-1H4304 Bid Date: 2/13/18 @ 2:00PM Docs & Plans Available from Caltrans Estimate: $1,530,000 Completion: 45 Working Days Requesting: 3% DVBE Project Description: Teichert Construction is requesting quotes from all qualified subcontractors and suppliers including certified DVBE firms for the following items of work, including but not limited to: all materials, labor and equipment for Construction Area Signs, Plane Asphalt Concrete, Groove & Grind Pavement, Roadside Sign, Object Marker, Thermoplastic Traffic Stripping & Marking, Pavement Marking, Signal & Lighting, Signal, Lighting, Sand & Gravel Supplier (Bulk Item), Asphalt Supplier (Bulk Item), LEAD Compliance, SWPPP Planning, Bottom; Transfer; Super; End 10 Dump Trucks, Street Sweeping Truck and Trucker. Teichert Construction intends to work cooperatively with all qualified firms seeking work on this project, including but not limited to breaking out contract work items into economically feasible units to increase overall DVBE participation. Plans and specifications are available from the municipality listed above and the Teichert?s Roseville Estimating office. For assistance obtaining or regarding the plans and specifications, please contact the listed Estimator. 100% Payment and Performance Bonds for subcontractors are required. Teichert will pay bond premium up to 2%. Insurance Waiver of subrogation also required. However, certified DVBE?s are encouraged to contact Teichert and request assistance if they are unable to meet Teichert's standard bonding or insurance requirements. DVBE's also are encouraged to contact Teichert for assistance in obtaining lines of credit, equipment, supplies, materials or related assistance or services. Subcontractor, Supplier and Trucker quotes must be valid, at minimum, for the award period stated in the contract documents. Please note that this is a prevailing wage project and Teichert Construction is Union signatory. Subcontractors will be subject to the terms and conditions of Teichert's subcontract and safety documents available at www.teichert.com/for-subcontractors.cfm. Submission of a bid to Teichert will confirm that you have reviewed and accepted Teichert's subcontract form. Conditions or exceptions in Subcontractor?s quote are expressly rejected unless accepted in writing prior to bid. Subcontractor scopes and supplier quotes are required 24 hours prior to bid. Additional information and or assistance to DVBE's available from: *** All Quotes must have the Department of Industrial Relations # to be ACCEPTED ***
Requirements:
Date posted: 01/30/2018
Contractor: Coral Construction Company Contact: Marc Roberts
Address: 10780 SW Clutter Road Sherwood, OR 97140
Phone: 503-682-2252 Fax: 503-682-0110 Email: marcroberts@coralconstruction.com
Services needed: LEAD COMPLIANCE PLAN, TRAFFIC CONTROL SYSTEM, WATER POLLUTION CONTROL PROGRAM, REMOVE ROADSIDE SIGN (STRAP & SADDLE BRACKET METHOD), INSTALL SIGN (STRAP & SADDLE BRACKET METHOD), MODIFY EXISTING ELECTRICAL SYSTEM
Requirements: Coral Construction Company is seeking qualified DBE/DVBE/SBE Subcontractors and Suppliers for this project. We are an equal opportunity employer and intend to seriously negotiate with qualified DBE/DVBE/SBE Subcontractors and Suppliers for project participation. All Subcontractors must possess a current California Contractors License, insurance and workers compensation coverage meeting Coral?s requirements and will be required to sign the standard Coral Construction Company Subcontract Agreement. A copy of the insurance requirements and subcontract agreement can be obtained by contacting the project estimator. 100% Performance and Payment bonds will be required for all Subcontractors. Please call Coral Construction Company if you need assistance obtaining insurance, bonds or lines of credit. Coral is Union Signatory. Subcontractor, Supplier and Trucking quotes must be valid for the award period stated in the contract documents. Conditions or exceptions in Subcontractors quotes are expressly rejected unless accepted in writing prior to bid. Plans and specifications can be viewed on line at http://www.dot.ca.gov/hq/esc/oe/project_ads_addenda/07/07-3W9604//
Date posted: 01/30/2018
Contractor: GRANITE ROCK COMPANY Contact: Paul Brizzolara
Address: 5225 Hellyer Avenue, Suite 220 San Jose, CA 95138
Phone: 408-574-1400 Fax: 408-365-9548 Email: estimating@graniterock.com
Services needed: Certified DVBE and Small Business firms are encouraged to provide a quote to Graniterock for all items of work listed on the bid list.
Requirements: Granite Rock Company 'Graniterock' is signatory to Operating Engineers, Laborers, Teamsters, Carpenters and Cement Masons unions. 100% performance and payment bonds will be required from a qualified surety company for the full amount of the subcontract price. Bonding assistance is available. Graniterock will pay bond premium up to 1.5%. In addition to bonding assistance, subcontractors are encouraged to contact Graniterock Estimating with questions regarding obtaining lines of credit, insurance, equipment, materials and/or supplies, or with any questions you may have. Plans and specifications can be downloaded on-line with Caltrans, or at our offices, but please contact our estimating office for assistance. Subcontractors must possess a current contractor's license, DIR number, insurance and worker's compensation coverage. Subcontractors will be required to enter into our standard contract. Items of work can be broken down to facilitate DVBE/SBE participation. Graniterock intends to work cooperatively with all qualified firms seeking work on this project. Granite Rock Company is an equal opportunity employer.
Date posted: 01/30/2018
Contractor: Ghilotti Construction Company, Inc. Contact: Jim Petnic
Address: 246 Ghilotti Avenue Santa Rosa, CA 95407
Phone: 707-585-1221 Fax: 707-585-1601 Email: jimp@ghilotti.com
Services needed: Ghilotti Construction Company, Inc. is seeking certified DBE subcontractors, suppliers & truckers for quotes including, but not limited to, the following scopes of work: CONSTRUCTION AREA SIGNS, ROADSIDE SIGNS, SIGN STRUCTURE, CLEAN & PAINT STEEL, TRAFFIC CONTROL, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, TEMPORARY RAMP METERING SYSTEM, TEMPORARY TRAFFIC MONITORING STATION SYSTEM, TEMPORARY LIGHTING SYSTEM, MODIFYING EXISTING ELECTRICAL SYSTEM, TEMPORARY CRASH CUSHION MODULE, TEMPORARY HIGH-VISIBILITY FENCE, LIGHTING, LEAN CONCRETE BASE, PRECAST CONCRETE LAGGING, SOIL NAIL, COLD PLANE ASPHALT CONCRETE PAVEMENT, CLEAR & GRUB, STRUCTURAL CONCRETE, MINOR CONCRETE STRUCTURE, AIR BLOWN MORTAR-SHOTCRETE, AC DIKE, CIDH PILES, CONCRETE CURB & SIDEWALK - MISC., CONCRETE BARRIER, REINFORCING STEEL, METAL BEAM GUARD RAILING, THERMOPLASTIC STRIPING & PAVEMENT MARKINGS, PAVEMENT MARKING, FABRIC & OILS, LANDSCAPE/HIGHWAY PLANTING, EROSION CONTROL, IRRIGATION, STORM DRAIN (UNDERGROUND), STREET SWEEPING, MATERIAL SUPPLIER & TRUCKING. Submit quotes by Noon on bid date. Contact our estimator for more information. GCC is available to discuss breaking out any portion of work to encourage minority participation.
Requirements: Mr. Jim Petnic (707/585-1221 or jimp@ghilotti.com) is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. GCC may also assist in obtaining any necessary equipment, supplies, materials or related services. (Please note: G.C.C. may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108. G.C.C. will pay bond premiums up to 1 1/2% of contract cost. G.C.C. is a UNION CONTRACTOR. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.) Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. Plans may also be viewed or purchased through local plan rooms, builder's exchanges, or Dodge Scan. Ghilotti Construction Company encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project. Req: By submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. GCC's written subcontract document execution is required of all successful subcontract bidders. A copy is available for inspection on GCC's website (www.ghilotti.com/subcontractors/documents) and/or can be provided upon written request prior to bid submission. Inconsistent bid terms and conditions shall be void. Insurance: As per our insurance requirements, your bid must include the cost of naming GCC as additional insured; including completed operations coverage; Use form CG-2010-1185 or equivalent; include Primary and Non-Contributing wording on your certificate of insurance and waiver of subrogation is required. We are an equal opportunity employer.
Date posted: 01/30/2018
Contractor: Pacific Infrastructure Construction, LLC Contact: Jay Zoellner
Address: 871 Cotting Court Suite A Vacaville CA 95688
Phone: 707-449-3604 Fax: 707-449-3641 Email: jzoellner@pacificic.net
Services needed: Item No. Item Code Item Description Unit of Measure Estimated Quantity 1 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 2 080050 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS LUMP SUM 3 100100 DEVELOP WATER SUPPLY LS LUMP SUM 4 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 5 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 6 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 3,700 7 120165 CHANNELIZER (SURFACE MOUNTED) EA 26 8 128652 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS LUMP SUM 9 129000 TEMPORARY RAILING (TYPE K) LF 1,280 10 129100 TEMPORARY CRASH CUSHION MODULE EA 21 11 130100 JOB SITE MANAGEMENT LS LUMP SUM 12 130300 PREPARE STORM WATER POLLUTION PREVENTION PLAN LS LUMP SUM 13 130310 RAIN EVENT ACTION PLAN EA 18 14 130320 STORM WATER SAMPLING AND ANALYSIS DAY EA 13 15 130330 STORM WATER ANNUAL REPORT EA 1 16 130570 TEMPORARY COVER SQYD 630 17 130620 TEMPORARY DRAINAGE INLET PROTECTION EA 12 18 130640 TEMPORARY FIBER ROLL LF 1,120 19 130710 TEMPORARY CONSTRUCTION ENTRANCE EA 4 20 130730 STREET SWEEPING LS LUMP SUM 21 130900 TEMPORARY CONCRETE WASHOUT LS LUMP SUM 22 141001 HEALTH AND SAFETY PLAN LS LUMP SUM 23 141120 TREATED WOOD WASTE LB 1,760 24 170103 CLEARING AND GRUBBING (LS) LS LUMP SUM 25(F) 193003 STRUCTURE BACKFILL (BRIDGE) CY 5 26(F) 193119 LEAN CONCRETE BACKFILL CY 1 27 205035 WOOD MULCH CY 160 28 210010 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 3 29 210110 IMPORTED TOPSOIL (CY) CY 13 30 210270 ROLLED EROSION CONTROL PRODUCT (NETTING) SQFT 31,700 31 210300 HYDROMULCH SQFT 35,700 32 210350 FIBER ROLLS LF 2,580 33 210430 HYDROSEED SQFT 35,700 34 210610 COMPOST (CY) CY 91 35 210630 INCORPORATE MATERIALS SQFT 2,760 36 390132 HOT MIX ASPHALT (TYPE A) TON 16 37 394074 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 270 38 394077 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 600 39 394090 PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 27 40 398100 REMOVE ASPHALT CONCRETE DIKE LF 870 41 480300 TEMPORARY SUPPORT LS LUMP SUM 42(F) 510053 STRUCTURAL CONCRETE, BRIDGE CY 10 43 510087 STRUCTURAL CONCRETE, APPROACH SLAB (TYPE R) CY 1 44(F) 510094 STRUCTURAL CONCRETE, DRAINAGE INLET CY 1.9 45(F) 510526 MINOR CONCRETE (BACKFILL) CY 6.2 46 511106 DRILL AND BOND DOWEL LF 550 47 511118 CLEAN EXPANSION JOINT LF 36 48 519100 JOINT SEAL (MR 2") LF 36 49 046009 JOINT SEAL (TYPE AL MODIFIED) LF 699 50(F) 520102 BAR REINFORCING STEEL (BRIDGE) LB 1,398 51(F) 046010 STRUCTURAL STEEL (PIPE PIN) LB 303 52 600013 REPAIR SPALLED SURFACE AREA SQFT 9 53 046011 CORE CONCRETE (4 1/2") LF 11 54 600114 BRIDGE REMOVAL (PORTION) LS LUMP SUM 55 600146 REPLACE BEARING PAD EA 20 56 665012 12" CORRUGATED STEEL PIPE (.079" THICK) LF 110 57 665716 18" SLOTTED CORRUGATED STEEL PIPE (.064" THICK) LF 64 58 692301 ANCHOR ASSEMBLY EA 2 59 710136 REMOVE PIPE (LF) LF 110 60 731507 MINOR CONCRETE (GUTTER DEPRESSION) CY 2 61(F) 750001 MISCELLANEOUS IRON AND STEEL LB 652 62 800103 TEMPORARY FENCE (TYPE CL-6) LF 170 63 800360 CHAIN LINK FENCE (TYPE CL-6) LF 450 64 046012 STEEL ACCESS GATE LS LUMP SUM 65 802620 16' CHAIN LINK GATE (TYPE CL-6) EA 1 66 803020 REMOVE FENCE LF 150 67 803100 RECONSTRUCT FENCE LF 90 68 810120 REMOVE PAVEMENT MARKER EA 200 69 810190 GUARD RAILING DELINEATOR EA 35 70 810230 PAVEMENT MARKER (RETROREFLECTIVE) EA 200 71 820134 OBJECT MARKER (TYPE P) EA 3 72 832006 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 1,060 73 832070 VEGETATION CONTROL (MINOR CONCRETE) SQYD 380 74(F) 046013 CONCRETE BARRIER (TYPE 27S MODIFIED) LF 10 75 839543 TRANSITION RAILING (TYPE WB-31) EA 2 76 839576 END CAP (TYPE A) EA 2 77 034426 CONCRETE BARRIER MARKER EA 10 78(F) 046014 CONCRETE BARRIER (TYPE 736A MODIFIED) LF 24 79(F) 839726 CONCRETE BARRIER (TYPE 736A) LF 16 80(F) 839727 CONCRETE BARRIER (TYPE 736 MODIFIED) LF 374 81 839752 REMOVE GUARDRAIL LF 120 82 839758 SALVAGE METAL BRIDGE RAILING LF 415 83 034427 2" TWO - COMPONENT PAINT TRAFFIC STRIPE LF 380 84 840616 6" TWO-COMPONENT PAINT TRAFFIC STRIPE (BROKEN 36-12) LF 730 85 846007 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) LF 6,900 86 846020 REMOVE PAINTED TRAFFIC STRIPE LF 3,700 87 846030 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 6,900 88 999990 MOBILIZATION LS LUMP SUM
Requirements:
Date posted: 01/30/2018
Contractor: Powell Constructors, Inc. Contact: Sherri Evans
Address: 8555 Banana Avenue Fontana, CA 92335
Phone: 909-356-8880 Fax: 909-356-1299 Email: sherri@powellconstructors.com
Services needed: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PREPARE WATER POLLUTION CONTROL PROGRAM, SWPPP MATERIALS, STREET SWEEPING, 60" CAST-IN-DRILLED-HOLE CONCRETE PILE (SIGN FOUNDATION), SIGN STRUCTURE, REMOVE BRIDGE MOUNTED SIGN, REMOVE ASPHALT CONCRETE SURFACING, REMOVE CONCRETE DECK SURFACE, PREPARE CONCRETE BRIDGE DECKSURFACE, FURNISH POLYESTER CONCRETE OVERLAY, PLACE POLYESTER CONCRETE OVERLAY, BRIDGE REMOVAL , DETECTABLE WARNING SURFACE, MINOR CONCRETE (CURB, SIDEWALK AND CURB RAMP), REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) , SURVEY, MANHOLE FRAME AND COVER, MISCELLANEOUS METAL (BRIDGE), REMOVE ROADSIDE SIGN, FURNISH SIGN PANELS, RETROREFLECTIVE SHEETING (TYPE XI), ROADSIDE SIGN - POSTS, CHAIN LINK RAILING TYPE 3, TUBULAR HANDRAILING, CONCRETE BARRIER (TYPE 732SW MODIFIED), REINFORCING STEEL TRUCKING, AND SALVAGE METAL BRIDGE RAILING, PAVEMNET MARKING & STRIPING, MODIFYING EXISTING ELECTRICAL SYSTEM.
Requirements: Quotations will be broken down into comparable packages as reasonably necessary. Powell Constructors, Inc. will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Union Signatory, 100% Payment and Performance Bonds from an accepted surety may be required. Powell Constructors, Inc. will reimburse subcontractor for bond premium up to 2%. Assistance in bonding, insurance, lines of credit or obtaining equipment, supplies, materials, or related assistance or services is available upon request. Subcontractors must possess a current contractor's license and provide General Liability, Auto and Worker's Compensation Insurance meeting the minimum requirements per the specifications. Subcontractors must also be registered with the Department of Industrial Relations (DIR) pursuant to the Labor Code section 1725.5. Powell Constructors, Inc. is an Equal Opportunity Employer and encourage DBE participation.
Date posted: 01/30/2018
Contractor: GRANITE CONSTRUCTION COMPANY Contact: Patricia Arnett
Address: 715 Comstock Street Santa Clara CA 95054
Phone: 408-327-7000 Fax: 408-327-7090 Email: patricia.arnett@gcinc.com
Services needed: Granite Construction Company is seeking DBE Subs/Suppliers for participation on this project. All items of work are available, including (but not limited to) the following suggested items: Lead Compliance Plan, Water Pollution Control Plan, Construction Area Signs, Traffic Control, PCMS Rental, Rapid Set Concrete Base, Fog Seal, Tack Coat, Pavement Grinding, Intertial Profiler, Data Core, Shoulder Backing Machine Rental, AC Dike (Type C & E), Drill/Bond Dowel, Joint Seal, Prepare Concrete Surface, Polyester Concrete Overlay, Striping & Marking items, Electrical Modifications, Jobsite Sanitation Rental, Sweeper Rental, and Trucking. Please contact our office if there are additional items, or portions of items, your firm is interested in bidding. Granite Construction will break down items of work to facilitate DBE participation on this project. All non-DBE subcontractors are also encouraged to utilize DBE suppliers for their work, where possible. Call Patricia Arnett with Granite, at (831) 763-6100 if you need help locating a DBE supplier. Please include any DBE participation information with your quote. Please create a Caltrans Connect account in order to download plans for this project. You can call or email Patricia Arnett at (831) 763-6100 or patricia.arnett@gcinc.com if you need any assistance in locating or downloading plans for this project, or if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies. Granite intends to work cooperatively with all qualified DBE firms seeking work on this project. Granite is an equal opportunity employer.
Requirements: Granite Construction Company is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. 100% performance and payment bonds may be required for the full amount of subcontract price. Granite Construction will assist with bonding costs for subcontractors. The US Small Business Administration may also assist you in obtaining bonding - please see the following site for information: http://www.sba.gov/content/contractors# Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Granite?s requirements and will be required to sign the standard Granite Subcontract Agreement. A copy of the insurance requirements and subcontract agreement are available upon request. Subcontractors must also be registered with a current DIR number.
Date posted: 01/30/2018
Contractor: Argonaut Constructors Contact: Dave Stanford
Address: 360 Sutton Place Santa Rosa, CA 95407
Phone: 707-542-4862 Fax: 707-542-4897 Email: daves@argonautconstructors.com
Services needed: Argonaut Constructors, (Argonaut) an equal opportunity employer, is requesting qualified minority DBE subcontractors and suppliers to submit bids for your trade specialty for the project listed below. Your firm must be currently certified as a DBE firm with an agency acceptable to Caltrans. PLEASE SUBMIT A COPY OF YOUR CURRENT CERTIFICATION WITH YOUR BID. Argonaut is requesting quotes from all Minority and Non-Minority Subcontractors and Suppliers including, but not limited to Construction area signs, lead compliance plan, WPCP, trucking, water trucks, HMA material supplier, tack oil supplier, traffic control, jobsite management, temporary items (concrete washout, pavement marking-paint), aggregate material supplier (shoulder backing), 6? and 8? 0thermoplastic striping and pavement marking installation and removal, minor concrete (vegetation control), modify existing electrical system, street sweeping, cold plane asphalt, adjust road way items, pavement markers, install midwest guardrail system, remove existing guardrail, vegetation control fiber mat, guard rail delineator, reset roadside signs, portable changeable message signs, imported borrow, sand cover supplier, asphalt rubber binder supplier, asphaltic emulsion (Fog Seal Coat) subcontractor, pre-coated screenings subcontractor, asphalt dike subcontractor, place hot mix asphalt (miscellaneous areas).
Requirements: Requirements: Note: Bids may be faxed to the number listed below. Please make sure that prior to bid time your quotation is received by our company. Scope letters should be submitted the day before the bid date. Bonds may be required: 100% Performance and 100 % Payment for the full amount of subcontractor?s price. Surety companies will have to be approved by Argonaut Constructors (Argonaut). Argonaut may pay up to 1.5 % of the bond premium. Union signatory will be required on this project. Argonaut will offer assistance in obtaining bonding, lines of credit, insurance, equipment or supplies. Argonaut is willing to break down items into economically feasible packages and we are willing to break out any portion of work to encourage participation. Argonaut?s listing of a subcontractor is not an acceptance of any or all of that subcontractor?s conditions, qualifications, exclusions or exceptions included in the subcontractor?s bid proposal. Quotations must be valid for the same duration as specified by the Owner for Contract Award. Argonaut is relying on the price submitted in the subcontractor?s proposal as all-inclusive price for its trade scope found in the plans and specifications regardless of any qualifying language in the proposal. Plans may be reviewed at our office in Santa Rosa or they may be obtained through Caltrans at http://www.dot.ca.gov/hq/esc/oe/weekly_ads/project.php , and viewed local plan rooms, builder?s exchanges such as the North Coast Builders Exchange and California Builders Exchange. Argonaut Constructors is an equal opportunity employer , Argonaut Constructors P. O. Box 639/360 Sutton Place Santa Rosa, CA 95402/95407Telephone: 707-542-4862/Fax:707-542-4897 E-mail:christerbl@argonautconstructors.com
Date posted: 01/31/2018
Contractor: Granite Rock Company Contact: David Kennedy
Address: 5225 Hellyer Avenue, Suite 220 San Jose, CA 95138
Phone: (408) 574-1400 Fax: (408) 365-9548 Email: estimating@graniterock.com
Services needed: Certified DBE firms are encouraged to provide a quote to Graniterock for all items of work listed on the bid list, particularly these: Lead Compliance Plan, Construction Area Signs, Traffic Control, Channelizer, PCMS, K-Rail, SWPPP, Temporary Erosion Control, Street Sweeping, Treated Wood Waste, Clearing & Grubbing, Structural & Lean Concrete Backfill,Erosion Control, Hydrossed, AC Dike, Minor Concrete, Joint Seal, Rebar, Minor Concrete, Misc Iron & Steel, Temporary Fence, Chain Link Fence, Pavement & Object Markers, MBGR, Concrete Barrier, Striping, Concrete Coring, Demolition and Trucking.
Requirements: Granite Rock Company 'Graniterock' is signatory to Operating Engineers, Laborers, Teamsters, Carpenters and Cement Masons unions. 100% performance and payment bonds will be required from a qualified surety company for the full amount of the subcontract price. Bonding assistance is available. Graniterock will pay bond premium up to 1.5%. In addition to bonding assistance, subcontractors are encouraged to contact Graniterock Estimating with questions regarding obtaining lines of credit, insurance, equipment, materials and/or supplies, or with any questions you may have. Plans and specifications can be downloaded on-line with Caltrans, or at our offices, but please contact our estimating office for assistance. Subcontractors must possess a current contractor's license, DIR number, insurance and worker's compensation coverage. Subcontractors will be required to enter into our standard contract. DBE Subcontractors must be listed by the CUCP for the work category code(s) that apply to the scope of work they are quoting. Items of work can be broken down to facilitate DBE participation. Graniterock intends to work cooperatively with all qualified firms seeking work on this project. Granite Rock Company is an equal opportunity employer.
Date posted: 01/31/2018
Contractor: Papich Construction Company Inc Contact: Jason Papich
Address: 800 Farroll Road Grover Beach, CA 93433
Phone: 805-473-3016 Fax: 805-473-2217 Email: jpapich@papichconstruction.com
Services needed: Papich Construction Company Inc. (PCI) is requesting quotes from all qualified subcontractors and suppliers including certified DBE/UDBE/SBE/WBE/DVBE firms for any and all items of work pertaining to, and associated with services, materials etc., generally associated with or otherwise accepted and approved as standard items of work for your firm related to applicable bid items on this project. This includes the following items of work, but not limited to: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN (LS), PREPARE WATER POLLUTION CONTROL PROGRAM, TREATED WOOD WASTE, PREPAVING INERTIAL PROFILER, PAVEMENT MARKER (RETROREFLECTIVE), MIDWEST GUARDRAIL SYSTEM (STEEL POST), ALTERNATIVE FLARED TERMINAL SYSTEM, SOFTSTOP TERMINAL SYSTEM, REMOVE GUARDRAIL, 6" THERMOPLASTIC TRAFFIC STRIPE, THERMOPLASTIC PAVEMENT MARKING, 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 12-3), 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 36-12), 12" RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT).
Requirements: Papich Construction Co Inc (PCI) intends to bid as a Prime for this Caltrans contract. We intend to conduct ourselves in good faith and work cooperatively with all qualified firms seeking work on this project. We are willing to break out items of work into economically feasible packages to facilitate DBE participation from certified firms. 100% performance and payment bonds will be required for the full amount of the subcontract price. We will reimburse for bond premium up to 2%. By submitting a price quote to PCI, subcontractors and suppliers affirm they have carefully examined ALL the bidding / contract documents / addenda and that from his/her own investigation, they have satisfied themselves as to the scope of the work. Please contact us for any assistance you may require for this solicitation, including obtaining bonding, insurance, equipment, materials and/or supplies. We are signatory to Operating Engineers and Laborers Unions. Any non-signatory subcontractors will be required to sign a one time agreement for trades covered under our union agreements. All project documents are available at no cost for download on the Caltrans Office Engineer Website. Project documents may also be viewed in our office by appointment. Subcontractors must posses a current contractor?s license, insurance and workers compensation coverage meeting project requirements and will be required to sign a standard Subcontract Agreement. If you are interested in providing pricing or if you have any questions about this project, or need any assistance from PCI to facilitate your firms participation on this project, please do not hesitate to contact us.
Date posted: 01/31/2018
Contractor: GRANITE CONSTRUCTION COMPANY Contact: DIANNE CARLISLE
Address: 5335 DEBBIE LANE SANTA BARBARA CA 93111
Phone: 805 964 9951 Fax: 805 967 1431 Email: DIANNE.CARLISLE@GCINC.COM
Services needed: Granite Construction Company (Granite) an Equal Opportunity Employer is requesting sub-bids from all qualified subcontractors and suppliers including certified DVBE firms performing commercially useful function for referenced project Bid Date: February 8, 2018 Bid Time: 2:00 PM for all items items of work listed on bid schedule including items of work normally performed by Granite. Quotations will be broken down into comparable packages as reasonably necessary. Granite will work with interested DVBE subcontractors to identify opportunities to break down items into economically feasible packages.
Requirements: Granite Construction Company (Granite) is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. 100% performance and payment bonds required for the full amount of subcontract price. Bonding assistance is available. Subcontractors must possess a current contractor?s license, insurance and workers compensation coverage meeting Granite?s requirements and will be required to sign the standard Granite Subcontract Agreement. A copy of the insurance requirements and agreement can be obtained by contacting the estimator. For any bid proposal submitted on or after March 1, 2015 and any contract for public work entered into on or after April 1, 2015, the following registration requirements apply: Every Subcontractor is required to be registered to perform public work pursuant to Section 1725.5 of the Public Contract Code (?Section 1725.5?). No Contractor or Subcontractor shall be qualified to bid on, be listed in a bid proposal pursuant to Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, unless currently registered to perform public work pursuant to Section 1725.5. No bid shall be accepted nor any subcontract entered into without proof of the Subcontractor?s current registration to perform public work pursuant to Section 1725.5. *PLEASE PROVIDE DIR # WITH QUOTE* Plans and specifications are available for viewing at our office located at: 5335 Debbie Lane Santa Barbara , CA 93111 Please call if you need any bidding assistance including but not limited to; obtaining bonding, insurance, equipment, materials and/or supplies. Granite intends to work cooperatively with all qualified DVBE firms seeking work on this project. Granite Construction Company P.O. Box 6744 Santa Barbara , California 93160 Phone (805)964-9951 Fax (805) 967-1431 CONTACT ESTIMATOR : Fleet Felchle fleet.felchle@gcinc.com or DIANNE.CARLISLE@GCINC.COM *Post bid : Due to time sensitivity; please provide an expeditious response to Granite request for the subcontractor "DBE Confirmation" form.
Date posted: 01/31/2018
Contractor: GRANITE CONSTRUCTION COMPANY Contact: DIANNE CARLISLE
Address: 5335 DEBBIE LANE SANTA BARBARA CA 93111
Phone: 805 964 9951 Fax: 805 967 1431 Email: DIANNE.CARLISLE@GCINC.COM
Services needed: Granite Construction Company (Granite) an Equal Opportunity Employer is requesting sub-bids from all qualified subcontractors and suppliers including certified DVBE firms performing commercially useful function for referenced project; performing the listed items; including items of work normally performed by Granite: LEAD COMPLIANCE PLAN CONSTRUCTION AREA SIGNS TRAFFIC CONTROL SYSTEM TYPE II BARRICADE CHANNELIZER (SURFACE MOUNTED) TEMPORARY PEDESTRIAN ACCESS ROUTE PORTABLE CHANGEABLE MESSAGE SIGN (LS) TEMPORARY RAILING (TYPE K) TEMPORARY ALTERNATIVE CRASH CUSHION SYSTEM JOB SITE MANAGEMENT PREPARE WATER POLLUTION CONTROL PROGRAM STREET SWEEPING REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE) REMOVE YELLOW THERMOPLASTIC PAVEMENT MARKING (HAZARDOUS WASTE) TREATED WOOD WASTE SHOULDER BACKING ASPHALTIC EMULSION (FOG SEAL COAT) PREPAVING INERTIAL PROFILER PREPAVING GRINDING DAY HOT MIX ASPHALT (TYPE A) ASPHALTIC EMULSION (BONDED WEARING COURSE) DATA CORE PLACE HOT MIX ASPHALT DIKE (TYPE A) PLACE HOT MIX ASPHALT DIKE (TYPE C) PLACE HOT MIX ASPHALT DIKE (TYPE D) PLACE HOT MIX ASPHALT DIKE (TYPE E) PLACE HOT MIX ASPHALT DIKE (TYPE F) PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) RUBBERIZED HOT MIX ASPHALT-GAP GRADED (BONDED WEARING COURSE) TACK COAT REMOVE ASPHALT CONCRETE PAVEMENT (SQFT) REMOVE ASPHALT CONCRETE DIKE COLD PLANE ASPHALT CONCRETE PAVEMENT ADJUST FRAME AND GRATE TO GRADE DETECTABLE WARNING SURFACE MINOR CONCRETE (CURB, SIDEWALK AND CURB RAMP) REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) REMOVE PAVEMENT MARKER GUARD RAILING DELINEATOR PAVEMENT MARKER (RETROREFLECTIVE) RESET ROADSIDE SIGN (ONE POST) RELOCATE ROADSIDE SIGN-ONE POST MIDWEST GUARDRAIL SYSTEM (STEEL POST) MIDWEST GUARDRAIL SYSTEM (8' POST) TRANSITION RAILING (TYPE WB-31) END ANCHOR ASSEMBLY (TYPE SFT) SOFTSTOP TERMINAL SYSTEM ALTERNATIVE FLARED TERMINAL SYSTEM CONCRETE BARRIER TRANSITION REMOVE GUARDRAIL ADJUST GUARDRAIL THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY) 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7) 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) REMOVE THERMOPLASTIC TRAFFIC STRIPE REMOVE THERMOPLASTIC PAVEMENT MARKING 12" RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT) MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION MODIFYING EXISTING ELECTRICAL SYSTEM
Requirements: Granite Construction Company (Granite) is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. 100% performance and payment bonds required for the full amount of subcontract price. Bonding assistance is available. Subcontractors must possess a current contractor?s license, insurance and workers compensation coverage meeting Granite?s requirements and will be required to sign the standard Granite Subcontract Agreement. A copy of the insurance requirements and agreement can be obtained by contacting the estimator. For any bid proposal submitted on or after March 1, 2015 and any contract for public work entered into on or after April 1, 2015, the following registration requirements apply: Every Subcontractor is required to be registered to perform public work pursuant to Section 1725.5 of the Public Contract Code (?Section 1725.5?). No Contractor or Subcontractor shall be qualified to bid on, be listed in a bid proposal pursuant to Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, unless currently registered to perform public work pursuant to Section 1725.5. No bid shall be accepted nor any subcontract entered into without proof of the Subcontractor?s current registration to perform public work pursuant to Section 1725.5. *PLEASE PROVIDE DIR # WITH QUOTE* Plans and specifications are available for viewing at our office located at: 5335 Debbie Lane Santa Barbara , CA 93111 Also included in our SMARTBID solicitation. Please call if you need any bidding assistance including but not limited to; obtaining bonding, insurance, equipment, materials and/or supplies. Granite intends to work cooperatively with all qualified DVBE firms seeking work on this project. Granite Construction Company P.O. Box 6744 Santa Barbara , California 93160 Phone (805)964-9951 Fax (805) 967-1431 CONTACT ESTIMATOR : ADAM SOUZA adam.souza@gcinc.com or Bid Day @ DIANNE.CARLISLE@GCINC.COM *
Date posted: 01/31/2018
Contractor: Serafix Engineering Contractors, Inc Contact: Estimating Dept
Address: 7 Crow Canyon Court, Suite 250 San Ramon, CA 94583
Phone: 925-552-8253 Fax: 925-552-8254 Email: estimating@secontractors.com
Services needed: Serafix Engineering Contractors, Inc. (SEC) is soliciting quotes from certified DBE Subcontractors and Suppliers for the following categories of work (including but not limited to): Lead Compliance Plan, CAS, Traffic Control System, Traffic Striping, SWPPP, Clearing and Grubbing, Temp K-rail, Temp Erosion Control, Erosion Control, HMA, Structural Concrete, Minor Concrete, Joint Seal, Bridge Removal, 12? Corrugated Steel Pipe, 18? Corrugated Steel Pipe, Misc Iron and Steel, Temp Fence, Chain Link Fence, Pavement Marker, Midwest Guardrail Sys, Concrete Barrier. Work will be broken down to accommodate subcontractor quotes.
Requirements: PLEASE SUBMIT A COPY OF YOUR CURRENT DBE CERTIFICATION WITH YOUR PROPOSAL. SEC adheres to the requirement for Affirmative Action to ensure Equal Employment Opportunity according to Executive Order 11246, and requires proof from all subcontractors that they are in accordance. 100% Performance and Payment Bonds with a surety company thereof, subject to the approval of SEC, will be required of all subcontractors. SEC will pay bond premium up to 1.5%. Please contact SEC for assistance with bonding, insurance, or lines of credit. All subcontractors are expected to sign a standard contract, which can be viewed at our location. Any bid provided by a Subcontractor constitutes an acceptance on each and every term of the general contractor?s standard contract. Subcontractor will be deemed to understand and accept those terms by providing a bid. Any attempt by a Subcontractor to revise or limit those terms will be null and void and not recognized by SEC. Prevailing wages must be met. Subcontractor must possess current insurance and workers compensation coverage meeting SEC?s insurance requirements. Insurance waiver of subrogation is also required. SEC is a Union Contractor. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements. Plans & specifications are available for downloading from the Caltrans website: http://www.dot.ca.gov/hq/esc/oe/contract_awards_services.html, viewing at our office or at Caltrans Plans Counter. Please contact SEC at 925-552-8253 for additional information or questions.
Date posted: 01/31/2018
Contractor: Road and Highway Builders, llc. Contact: Sherry Cuellar
Address: 175 Salomon Cir Suite # 103 Sparks, NV 89434
Phone: 775-852-7283 Fax: 775-359-7248 Email: sherry.cuellar@strlco.com
Services needed: Road and Highway Builders, LLC. is seeking certified and qualified DVBE subcontractors and/or supplier for services to all items of work including: lead compliance plan, construction area signs, traffic control, portable CMS, job site management, water pollution control program, sweeping, trucking/hauling, disposal and material suppliers for Caltrans Contract 08-1J3504, in Riverside and San Bernardino County from San Diego County line to 0.4 mile North of El Cerrito Road and from Route 15/60 separation to Nevada State line. Road and Highway Builders, LLC. is an Equal Opportunity Employer. Plans and Specifications are available on Cal-Trans' website under 08-1J3504. Please contact our office at 775-852-7283 or by e-mail for more information. Please fax all certifications 775-359-7248. Sub-contractors must be registered with the Department of Industrial relations and have a DIR number prior to the bid.
Requirements:
Date posted: 01/31/2018
Contractor: Road and Highway Builders, llc. Contact: Sherry Cuellar
Address: 175 Salomon Cir Suite # 103 Sparks, NV 89434
Phone: 775-852-7283 Fax: 775-359-7248 Email: sherry.cuellar@strlco.com
Services needed: Road and Highway Builders, LLC. is seeking certified and qualified DVBE subcontractors and/or supplier for services to all items of work including: lead compliance plan, construction area signs, traffic control, portable CMS, job site management, water pollution control program, sweeping, trucking/hauling, disposal and material suppliers for Caltrans Contract 03-1G1904, for construction on State Highway in Placer, Nevada and Sierra Counties from 0.2 mile East of Route 80/174 separation to Nevada State Line. Road and Highway Builders, LLC. is an Equal Opportunity Employer. Plans and Specifications are available on Cal-Trans' website under 03-1G1904. Please contact our office at 775-852-7283 for more information. Please fax all certifications to 775-359-7248. Sub-contractors must be registered with the Department of Industrial relations and have a DIR number prior to the bid.
Requirements:
Date posted: 01/31/2018
Contractor: Riverside Construction Company, Inc. Contact: Brian Pim
Address: 4225 Garner Road Riverside
Phone: 9516828308 Fax: 9516825872 Email: estimating@rivconstruct.com
Services needed: ALL BID ITEMS ARE OPEN FOR DBE PARTICIPATION including but not limited to the following. A.C. Dike, Biologist, Erosion Control, Fence, Highway Planting, Duff, Hydroseed, Traffic Control, Area Signs, Storm Water Pollution Control Plan, Natural Resource Protection Plan, Rock Slope Protection, Import, Reinforcement, Storm Drain Facilities and Structures.
Requirements: Requirements: Riverside Construction Company, Inc. is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. Riverside Construction Company, Inc. is interested in soliciting in Good Faith, including assistance in obtaining bonds, lines of credit, insurance, necessary equipment, materials and/or supplies. Subcontractors may be required to furnish performance and payment bonds in the full amount of their subcontract by an admitted surety and subject to approval by our estimating department. A Worker?s Compensation Waiver of Subrogation will be required. Conditions or exceptions in Subcontractor?s quote are expressly rejected unless accepted in writing. Subcontractor scope (including any conditions or exceptions) is required 24 hours prior to bid deadline to allow proper evaluation. Quotes are required to be in accordance with the plans and specifications and good for the contract duration as specified in the bid documents. In order to assist DBE Contractors and suppliers, Riverside Construction Company will divide bid items into smaller tasks or quantities when feasible to facilitate maximum participation.
Date posted: 01/31/2018
Contractor: GRANITE CONSTRUCTION COMPANY Contact: DIANNE CARLISLE
Address: 5335 DEBBIE LANE SANTA BARBARA CA 93111
Phone: 805 964 9951 Fax: 805 967 1431 Email: DIANNE.CARLISLE@GCINC.COM
Services needed: Granite Construction Company (Granite) an Equal Opportunity Employer is requesting sub-bids from all qualified subcontractors and suppliers including certified DBE firms performing commercially useful function for referenced project for the following items of work, including LEAD COMPLIANCE PLAN CONSTRUCTION AREA SIGNS TRAFFIC CONTROL SYSTEM TEMPORARY PEDESTRIAN ACCESS ROUTE PORTABLE CHANGEABLE MESSAGE SIGN (LS) JOB SITE MANAGEMENT PREPARE WATER POLLUTION CONTROL PROGRAM TEMPORARY CONCRETE WASHOUT TREATED WOOD WASTE SHOULDER BACKING PREPAVING INERTIAL PROFILER REPLACE ASPHALT CONCRETE SURFACING HOT MIX ASPHALT (TYPE A) RUBBERIZED HOT MIX ASPHALT (GAP GRADED) DATA CORE PLACE HOT MIX ASPHALT DIKE (TYPE E) TACK COAT REMOVE ASPHALT CONCRETE DIKE COLD PLANE ASPHALT CONCRETE PAVEMENT REMOVE BRIDGE MOUNTED SIGN DETECTABLE WARNING SURFACE MINOR CONCRETE (CURB AND CURB RAMP) REMOVE CONCRETE CURB AND SIDEWALK (SQYD) SURVEY MONUMENT (TYPE D) PAVEMENT MARKER (RETROREFLECTIVE) REMOVE ROADSIDE SIGN FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED) FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-FRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-FRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) RETROREFLECTIVE SHEETING (TYPE XI) ROADSIDE SIGN - ONE POST ROADSIDE SIGN - TWO POST INSTALL FRAMED SIGN PANEL 6" TRAFFIC STRIPE (WARRANTY) 6" TRAFFIC STRIPE (WARRANTY) (BROKEN 8-4) PAVEMENT MARKING (WARRANTY) TRAFFIC MONITORING STATION SYSTEM MOBILIZATION but not limited to Including items of work normally performed by Granite. Quotations will be broken down into comparable packages as reasonably necessary. Granite will work with interested DBE subcontractors to identify opportunities to break down items into economically feasible packages.
Requirements: Granite Construction Company (Granite) is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. 100% performance and payment bonds required for the full amount of subcontract price. Bonding assistance is available. Subcontractors must possess a current contractor?s license, insurance and workers compensation coverage meeting Granite?s requirements and will be required to sign the standard Granite Subcontract Agreement. A copy of the insurance requirements and agreement can be obtained by contacting the estimator. For any bid proposal submitted on or after March 1, 2015 and any contract for public work entered into on or after April 1, 2015, the following registration requirements apply: Every Subcontractor is required to be registered to perform public work pursuant to Section 1725.5 of the Public Contract Code (?Section 1725.5?). No Contractor or Subcontractor shall be qualified to bid on, be listed in a bid proposal pursuant to Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, unless currently registered to perform public work pursuant to Section 1725.5. No bid shall be accepted nor any subcontract entered into without proof of the Subcontractor?s current registration to perform public work pursuant to Section 1725.5. *PLEASE PROVIDE DIR # WITH QUOTE* Plans and specifications are available for viewing at our office located at: 5335 Debbie Lane Santa Barbara , CA 93111 Also included in our SMARTBID solicitation. Please call if you need any bidding assistance including but not limited to; obtaining bonding, insurance, equipment, materials and/or supplies. Granite intends to work cooperatively with all qualified DBE firms seeking work on this project. Granite Construction Company P.O. Box 6744 Santa Barbara , California 93160 Phone (805)964-9951 Fax (805) 967-1431 CONTACT ESTIMATOR : TRACE BURTON trace.burton@gcinc.com or Bid Day @ DIANNE.CARLISLE@GCINC.COM *Post bid : Due to time sensitivity; please provide an expeditious response to Granite request for the subcontractor "DBE Confirmation" form.
Date posted: 01/31/2018
Contractor: Ghilotti Construction Company, Inc. Contact: Jim Petnic
Address: 246 Ghilotti Avenue Santa Rosa, CA 95407
Phone: 707-585-1221 Fax: 707-585-1601 Email: jimp@ghilotti.com
Services needed: Ghilotti Construction Company, Inc. is seeking certified DBE subcontractors, suppliers & truckers for quotes including, but not limited to, the following scopes of work: CONSTRUCTION AREA SIGNS, ROADSIDE SIGNS, LIGHTING, TRAFFIC CONTROL, TRAFFIC MONITORING STATION SYSTEM, COLD PLANE ASPHALT CONCRETE PAVEMENT, CLEAR & GRUB, AC DIKE, STRUCTURAL CONCRETE, MINOR CONCRETE STRUCTURE, JOINT SEAL, JOINTED PLAIN CONCRETE PAVEMENT, JOINTED PLAIN CONCRETE PAVEMENT (COLORIZED), PREPARE & STAIN CONCRETE, OXIDIZING STAIN, ANTI-GRAFFITI COATING, EROSION CONTROL, CONCRETE CURB & SIDEWALK - MISC., FENCING, METAL BEAM GUARD RAILING, THERMOPLASTIC STRIPING & PAVEMENT MARKINGS, PAVEMENT MARKING, STORM DRAIN (UNDERGROUND), STREET SWEEPING, MATERIAL SUPPLIER & TRUCKING. Submit quotes by Noon on bid date. Contact our estimator for more information. GCC is available to discuss breaking out any portion of work to encourage minority participation.
Requirements: Mr. Jim Petnic (707/585-1221 or jimp@ghilotti.com) is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. GCC may also assist in obtaining any necessary equipment, supplies, materials or related services. (Please note: G.C.C. may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108. G.C.C. will pay bond premiums up to 1 1/2% of contract cost. G.C.C. is a UNION CONTRACTOR. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.) Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. Plans may also be viewed or purchased through local plan rooms, builder's exchanges, or Dodge Scan. Ghilotti Construction Company encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project. Req: By submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. GCC's written subcontract document execution is required of all successful subcontract bidders. A copy is available for inspection on GCC's website (www.ghilotti.com/subcontractors/documents) and/or can be provided upon written request prior to bid submission. Inconsistent bid terms and conditions shall be void. Insurance: As per our insurance requirements, your bid must include the cost of naming GCC as additional insured; including completed operations coverage; Use form CG-2010-1185 or equivalent; include Primary and Non-Contributing wording on your certificate of insurance and waiver of subrogation is required. We are an equal opportunity employer.
Date posted: 01/31/2018
Contractor: Valentine Corporation Contact: Valorie McCauley
Address: 111 Pelican Way, San Rafael, CA 94901
Phone: 415-453-3732 Fax: 415-457-5820 Email: vmccauley@valentinecorp.com
Services needed: Lead Compliance Plan, Progress Schedule (Critical Path Method) Develop Water Supply, Construction Area Signs, Traffic Control System, Temporary Traffic Stripe (Paint), Channelizer (Surface Mounted), Portable Changeable Message Sign, Temporary Railing (Type K), Temporary Crash Cushion Module, Job Site Management, Prepare SWPPP, Rain Event Action Plan, Storm Water Sampling & Analysis Day, Storm Water Annual Report, Temporary Cover, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Construction Entrance, Street Sweeping, Temporary Concrete Washout, Health & Safety Plan, Treated Wood Waste, Clearing & Grubbing, Structure Backfill (Bridge), Lean Concrete Backfill, Wood Mulch, Move-In/Move-Out (Erosion Control), Imported Topsoil, Rolled Erosion Control Product (Netting), Hydromulch, Fiber Rolls, Hydroseeding, Compost, Incorporate Materials, Hot Mix Asphalt (Type A), Place Hot Mix Asphalt Dike (Type C & Type F), Place Hot Mix Asphalt (Misc. Area), Remove Asphalt Concrete Dike, Temporary. Support, Structural Concrete; Bridge, Structural Concrete, Approach Slab (Type R), Structural Concrete; Drainage Inlet, Minor Concrete (Backfill), Drill & Bond Dowel, Clean Expansion Joint, Joint Seal, Bar Reinforcing Steel, Structural Steel, Repair Spalled Surface Area, Core Concrete, Bridge Removal (Portion), Replace Bearing Pad, 12 in. Corrugated Steel Pipe, 18? Slotted Corrugated Steel Pipe, Anchor Assembly, Remove Pipe, Minor Concrete (Gutter Depression), Misc. Iron and Steel, Temporary Fence (Type CL-6), Chain Link Fence, Steel Access Gate, 16 ft. Chain Link Gate (Type CL-6), Remove Fence, Reconstruct Fence, Remove Pavement Marker, Guard Railing Delineator, Pavement Marker (Retroreflective), Object Marker (Type P), Midwest Guardrail System (Steel Post), Vegetation Control (Minor Concrete), Concrete Barrier (Type 27S Modified.), Transition Railing (Type WB-31), End Cap (Type A), Concrete Barrier Marker, Concrete Barrier (Type 736A, 736A Modified & 736 Modified), Remove Guardrail, Salvage Metal Bridge Railing, 2 in. Two - Component Paint Traffic Stripe, 6 in. Two-Component Paint Traffic Stripe, 6 in. Thermoplastic Traffic Stripe, Remove Painted Traffic Stripe, Remove Thermoplastic Traffic Stripe.
Requirements: Subcontractors are required to meet insurance and labor requirements. Subcontractors may be required to provide Payment and Performance Bond, if so Valentine is available to assist. Please contact us for assistance. Quotes are required to be in accordance with the plans and specifications and good for the contract duration as specified in the bid documents. We intend to help and work with all qualified firms seeking participation on this project. Plans and specs are available at our office, or contact us for a set. Feel free to call our office with any questions you may have. Valentine is willing to break items into smaller work to facilitate D/M/WBE participation, please contact our office
Date posted: 01/31/2018
Contractor: Nevada Barricade & Sign Co., Inc. DBA Golden State Striping & Signs Contact: Joshua Dethmers
Address: P.O. Box 20459 Reno, NV 89515
Phone: 775-331-5100 Fax: 775-331-5103 Email: joshua@nbsco.com
Services needed: Contractor: Nevada Barricade & Sign Co., Inc. DBA Golden State Striping & Signs Contact: Joshua Dethmers Address: 9530 North Virginia Street Reno, NV 89506 Phone: 775-331-5100 Fax: 775-331-5103 Email: joshua.dethmers@nbsco.com Services needed: Nevada Barricade & Sign Co., Inc. DBA Golden State Striping & Signs. is seeking certified and qualified DVBE subcontractors and/or suppliers for services to all items of work including: lead compliance plan, construction area signs, traffic control, portable CMS, job site management, water pollution control program, sweeping, trucking/hauling, disposal and material suppliers for Caltrans Contract 03-1G1904, for construction on state highway in Placer, Nevada and Sierra Counties from 0.2 mile East of route 80/174 separation to Nevada State line. Nevada Barricade & Sign Co., Inc. DBA Golden State Striping & Signs. is an Equal Opportunity Employer. Nevada Barricade & Sign Co., Inc. DBA Golden State Striping & Signs has union labor agreements. Assistance is available in obtaining bonds, lines of credit, insurance or other technical information. Plans and Specifications are available from owner. Please contact our office at 775-331-5100 for more information. Certifications must be faxed to 775-331-5103. Sub-contractors must be registered with the Department of Industrial relations and have a DIR number prior to the bid.
Requirements:
Date posted: 01/31/2018
Contractor: Nevada Barricade & Sign Co., Inc. DBA Golden State Striping & Signs Contact: Joshua Dethmers
Address: P.O. Box 20459 Reno, NV 89515
Phone: 775-331-5100 Fax: 775-331-5103 Email: joshua@nbsco.com
Services needed: Contractor: Nevada Barricade & Sign Co., Inc. DBA Golden State Striping & Signs Contact: Joshua Dethmers Address: 9530 North Virginia Street Reno, NV 89506 Phone: 775-331-5100 Fax: 775-331-5103 Email: joshua.dethmers@nbsco.com Services needed: Nevada Barricade & Sign Co., Inc. DBA Golden State Striping & Signs. is seeking certified and qualified DVBE subcontractors and/or suppliers for services to all items of work including: lead compliance plan, disposal of yellow thermoplastic traffic stripe (hazardous waste), construction area signs, traffic control, portable CMS, job site management, water pollution control program, sweeping, trucking/hauling, disposal and material suppliers for Caltrans Contract 08-1J3504, for Caltrans Contract 08-1J3504, in Riverside and San Bernardino County from San Diego County line to 0.4 mile North of El Cerrito Road and from Route 15/60 separation to Nevada State line. Nevada Barricade & Sign Co., Inc. DBA Golden State Striping & Signs is an Equal Opportunity Employer. Assistance is available in obtaining bonds, lines of credit, insurance or other technical information. Plans and Specifications are available on Caltrans website under 08-1J3504. Please contact our office at 775-331-5100 for more information. Certifications must be faxed to 775-331-5103. Sub-contractors must be registered with the Department of Industrial relations and have a DIR number prior to the bid.
Requirements:
Date posted: 01/31/2018
Contractor: Gordon N. Ball, Inc Contact: Serina Sirna
Address: 333 Camille Ave. Alamo, CA 94507
Phone: 925-838-5675 Fax: 925-838-0814 Email: estimating@ballconco.com
Services needed: Work types requested, but are not limited to, the following: Bar Reinforcing Steel, Bridge Removal, Chain Link Fence, Chain Link Gate, Clearing and Grubbing, Concrete Barrier, Construction Area Signs, Construction Materials, Erosion Control, HMA Type A, Lead Compliance Plan, Midwest Guardrail System (Steel Post), Portable Changeable Message Sign, Prepare SWPPP, Street Sweeping, Striping Work, Structural Concrete, Temporary Erosion Control, Temporary Fence, Traffic Control System, and Trucking.
Requirements: Plans and Specifications are available for review at our office, or can be downloaded online at the following website: http://www.dot.ca.gov/des/oe/weekly-ads/specs-ntb.php?c=04-4G8104 Call Serina Sirna for assistance in obtaining bonds, line of credit, insurance and scheduling accommodations. Attn: Serina Sirna 333 Camille Ave., Alamo, CA 94507 Phone: (925) 838-5675 Fax: (925) 838-0814 estimating@ballconco.com An Equal Opportunity Employer
Date posted: 02/01/2018
Contractor: Viking Construction Company, Inc. Contact: Randy Jenco
Address:
Phone: 916-852-5530 Fax: 916-852-5533 Email: jvoong@vikingbridges.com
Services needed: Prepare Lead Compliance Plan, Construction Area Signs, Traffic Control, Temporary Striping, Channelizers, Furnish Message Boards, Furnish Crash Cushions, Furnish Temporary Railing (Type K), Prepare Storm Water Pollution Control Plan, Water Pollution Control and Reports, Sweeping, Prepare Health and Safety Plan, Clearing, Excavation and Backfill, Trucking, Erosion Control, HMA Dike and Miscellaneous Area, Furnish Readymix Concrete, Minor Concrete, Drill and Bond Dowel, Joint Seal, Reinforcing Steel, Furnish Structural Steel, Core Concrete (4 ??), Bridge Removal (Portion), Furnish Bearing Pads, Drainage, Furnish Iron and Steel, Fence and Gates, Object Markers, Metal Beam Guard Railing, Concrete Barrier, Striping
Requirements: Plans and specifications may be reviewed at our office located at 11315 Sunrise Gold Circle, Suite A, Rancho Cordova, at your local Builder?s Exchange, or may be obtained from the Owner. Contact the below if you need further direction in this regard. Each subcontractor may be required to submit faithful performance and payment bonds. Contact the below if you need more information or help in obtaining bonds, lines of credit, insurance, necessary equipment, supplies and materials or technical assistance. If you are interested in quoting, please contact me at (916) 852-5530. Quotes are due in our office by 12:00 (noon) on bid day.
Date posted: 02/01/2018
Contractor: Serafix Engineering Contractors, Inc Contact: Estimating Dept
Address: 7 Crow Canyon Court, Suite 250 San Ramon, CA 94583
Phone: 925-552-8253 Fax: 925-552-8254 Email: estimating@secontractors.com
Services needed: Serafix Engineering Contractors, Inc. (SEC) is soliciting quotes from certified DVBE Subcontractors and Suppliers for the following categories of work (including but not limited to): Lead Compliance Plan, CAS, Traffic Control System, WPCP, HMA, Corrugated Steel Pipe, Structural Concrete, Portable Changeable Message Boards, Erosion Control, Temporary Concrete Washout, Treated Wood Waste, Biologist. Work will be broken down to accommodate subcontractor quotes.
Requirements: PLEASE SUBMIT A COPY OF YOUR CURRENT DBE CERTIFICATION WITH YOUR PROPOSAL. SEC adheres to the requirement for Affirmative Action to ensure Equal Employment Opportunity according to Executive Order 11246, and requires proof from all subcontractors that they are in accordance. 100% Performance and Payment Bonds with a surety company thereof, subject to the approval of SEC, will be required of all subcontractors. SEC will pay bond premium up to 1.5%. Please contact SEC for assistance with bonding, insurance, or lines of credit. All subcontractors are expected to sign a standard contract, which can be viewed at our location. Any bid provided by a Subcontractor constitutes an acceptance on each and every term of the general contractor?s standard contract. Subcontractor will be deemed to understand and accept those terms by providing a bid. Any attempt by a Subcontractor to revise or limit those terms will be null and void and not recognized by SEC. Prevailing wages must be met. Subcontractor must possess current insurance and workers compensation coverage meeting SEC?s insurance requirements. Insurance waiver of subrogation is also required. SEC is a Union Contractor. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements. Plans & specifications are available for downloading from the Caltrans website: http://www.dot.ca.gov/hq/esc/oe/contract_awards_services.html, viewing at our office or at Caltrans Plans Counter. Please contact SEC at 925-552-8253 for additional information or questions.
Date posted: 02/01/2018
Contractor: R. Burke Corporation Contact: Rob Burke
Address: 865 Capitolio Way San Luis Obispo, CA 93401
Phone: 805-543-8568 Fax: 805-543-2521 Email: rbc@rburkecorporation.com
Services needed: LEAD COMPLIANCE PLAN, PROGRESS SCHEDULE (CRITICAL PATH METHOD), TIME-RELATED OVERHEAD (WDAY), CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TYPE III BARRICADE, TEMPORARY TRAFFIC STRIPE (PAINT), PORTABLE CHANGEABLE MESSAGE SIGN (LS), TEMPORARY RAILING (TYPE K), ALTERNATIVE TEMPORARY CRASH CUSHION SYSTEM, JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN,RAIN EVENT ACTION PLAN,STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL), TEMPORARY HYDRAULIC MULCH, TEMPORARY CHECK DAM, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY REINFORCED SILT FENCE, TEMPORARY SILT FENCE, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, TEMPORARY HIGH-VISIBILITY FENCE, CLEARING AND GRUBBING (LS), ROADWAY EXCAVATION, GEOSYNTHETIC REINFORCED EMBANKMENT, SHOULDER BACKING, DITCH EXCAVATION, IMPORTED BORROW (CY), ROCK BLANKET, GRAVEL MULCH, BOULDER (TYPE A), BOULDER (TYPE B), MOVE-IN/MOVE-OUT (EROSION CONTROL), BONDED FIBER MATRIX (SQFT), ROLLED EROSION CONTROL PRODUCT (NETTING), COMPOST (CY), INCORPORATE MATERIALS, PERMANENT EROSION CONTROL ESTABLISHMENT WORK, CLASS 2 AGGREGATE BASE (CY), HOT MIX ASPHALT (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE C), PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA), TACK COAT, COLD PLANE ASPHALT CONCRETE PAVEMENT, REMOVE BASE AND SURFACING, JOINTED PLAIN CONCRETE PAVEMENT, JOINTED PLAIN CONCRETE PAVEMENT (COLORIZED)JOINT SEAL (SILICONE), STRUCTURAL CONCRETE, DRAINAGE INLET, BAR REINFORCING STEEL, 18" ALTERNATIVE PIPE CULVERT, 24" ALTERNATIVE PIPE CULVERT, 6" PERFORATED PLASTIC PIPE UNDERDRAIN, GEOCOMPOSITE DRAIN, 8" CORRUGATED STEEL PIPE DOWNDRAIN, 8" ENTRANCE TAPER, DRAINAGE INLET MARKER, 18" ALTERNATIVE FLARED END SECTION, 24" ALTERNATIVE FLARED END SECTION, 18" PRECAST CONCRETE PIPE INLET, 36" PRECAST CONCRETE PIPE INLET, ABANDON CULVERT (EA), REMOVE CULVERT (EA), SLOPE PAVING (CONCRETE), DETECTABLE WARNING SURFACE, MINOR CONCRETE (CURB AND GUTTER), MINOR CONCRETE (ISLAND PAVING), MINOR CONCRETE (SIDEWALK), MINOR CONCRETE (CURB RAMP), MISCELLANEOUS IRON AND STEEL, PREPARE AND STAIN CONCRETE, OXIDIZING STAIN, LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN (LS), JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM, TEMPORARY CONCRETE WASHOUT, SHOULDER BACKING, LEAN CONCRETE BASE RAPID SETTING, ASPHALTIC EMULSION (FOG SEAL COAT), PREPAVING INERTIAL PROFILER, MINOR HOT MIX ASPHALT, RUBBERIZED HOT MIX ASPHALT (GAP GRADED), DATA CORE, PLACE HOT MIX ASPHALT DIKE (TYPE C), PLACE HOT MIX ASPHALT DIKE (TYPE E), TACK COAT, REMOVE ASPHALT CONCRETE DIKE, COLD PLANE ASPHALT CONCRETE PAVEMENT, INDIVIDUAL PRECAST SLAB REPLACEMENT, PAVEMENT TRANSITION TAPER, REMOVE CONCRETE PAVEMENT AND BASE, GRIND EXISTING CONCRETE PAVEMENT, DRILL AND BOND DOWEL, JOINT SEAL (MR 1"), PREPARE CONCRETE SURFACE, FURNISH POLYESTER CONCRETE OVERLAY, PLACE POLYESTER CONCRETE OVERLAY, REMOVE PAVEMENT MARKER, PAVEMENT MARKER (RETROREFLECTIVE), THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), 12" RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT), MODIFYING EXISTING ELECTRICAL SYSTEM
Requirements:
Date posted: 02/01/2018
Contractor: Hat Creek Construction & Materials, Inc Contact: Amber DeMarco
Address: 24339 Hwy 89 Burney, CA 96013
Phone: 530-335-5501 Fax: 530-335-5510 Email: amber@hatcreekconstruction.com
Services needed: Hat Creek Construction & Materials, Inc. is requesting quotes from qualified DVBE/DBE/UDBE/SBE subcontractors and suppliers for the following bid items for this project: 1 LEAD COMPLIANCE PLAN, 2 CONSTRUCTION AREA SIGNS, 3 TRAFFIC CONTROL SYSTEM, 4 PORTABLE CHANGEABLE MESSAGE SIGN, 5 JOB SITE MANAGEMENT, 6 PREPARE WATER POLLUTION CONTROL PROGRAM, 7 TEMPORARY CONCRETE WASHOUT, 8 TREATED WOOD WASTE, 9 CLEARING AND GRUBBING, 10 SHOULDER BACKING, 11 REPLACE ASPHALT CONCRETE SURFACING, 12 HOT MIX ASPHALT (TYPE A), 13 DATA CORE, 14 PLACE HOT MIX ASPHALT DIKE (TYPE A), 15 PLACE HOT MIX ASPHALT DIKE (TYPE E), 16 TACK COAT, 17 COLD PLANE ASPHALT CONCRETE PAVEMENT, 18 ADJUST INLET, 19 OBJECT MARKER (TYPE L-1), 20 MIDWEST GUARDRAIL SYSTEM (STEEL POST), 21 ALTERNATIVE IN-LINE TERMINAL SYSTEM, 22 ALTERNATIVE FLARED TERMINAL SYSTEM, 23 SPECIAL BRIDGE RAIL TO W-BEAM ADAPTER, 24 REMOVE GUARDRAIL, 25 RECONSTRUCT GUARDRAIL, 26 RECONSTRUCT TERMINAL SYSTEM (TYPE FLEAT), 27 THERMOPLASTIC TRAFFIC STRIPE (SPRAYABLE) plans and specifications can be obtained from the Caltrans website http://www.dot.ca.gov/hq/esc/oe/weekly_ads/index.php
Requirements: Subcontractors must possess current contractor?s license, insurance and workers compensation meeting Hat Creek Construction?s requirements. Payment and performance bonds may be required. Subcontractors will be subject to the terms and conditions of Hat Creek?s subcontract agreement and safety standards. If you need assistance in obtaining bonds, insurance, equipment, materials and/or supplies please contact our office or visit our website www.hatcreekconstruction.com for more information. Hat Creek Construction & Materials, Inc. is an equal opportunity employer and intends to work cooperatively with all qualified firms seeking work on this project.
Date posted: 02/01/2018
Contractor: Dig It Construction, Inc. Contact: Caleb Holland
Address: 803 Lorraine Drive Chester, CA 96020
Phone: 530-258-3306 Fax: 530-258-4246 Email: kacie@digitconst.com
Services needed: Bids are needed for the following items: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign (EA), Job Site Management, Prepare Water Pollution Control Program, Temporary Concrete Washout, Treated Wood Waste, Contractor-Supplied Biologist (Day), Dry Seed (SQFT), Straw, Minor Hot Mix Asphalt, Place Hot Mix Asphalt Dike (Type F), Place Hot Mix Asphalt (Miscellaneous Area), Structural Concrete, Drainage Inlet, 18? Corrugated Steel Pipe (.109? Thick), 24? Corrugated Steel Pipe (.109? Thick), 36? Corrugated Steel Pipe (.138? Thick), 24? Corrugated Steel Pipe Downdrain (.138? Thick), 36? Corrugated Steel Pipe Downdrain (.138? Thick), 10? Flume Downdrain, 10? Tapered Inlet, 24? Anchor Assembly, 36? Anchor Assembly, 10? Flume Anchor Assembly, 36? Corrugated Steel Pipe Inlet (.138? Thick), 24? Corrugated Steel Pipe Energy Dissipator (.064? Thick), 36? Corrugated Steel Pipe Energy Dissipator, Debris Rack Cage (H=6?), Abandon Culvert (LF), Abandon Inlet, Remove Overside Drain, Remove Culvert (LF), Remove Inlet, Remove Headwall, Sand Backfill, Reconstruct Concreted-RSP, Minor Concrete (Miscellaneous Construction), Miscellaneous Iron and Steel, Marker (Culvert), Reset Marker, Reset Roadside Sign, Reset Guardrail, Furnish Guardrail Element, Reconstruct Guardrail.
Requirements: If you are a Certified DVBE firm and would like to provide us with a quote, we encourage you to do so. If you need assistance with bonding, insurance, line of credit, equipment, supplies, materials and/or services please contact our office at the location and/or the phone number listed above.
Date posted: 02/02/2018
Contractor: SULLY-MILLER Contact: CHARLIE PESSA
Address: 135 S STATE COLLEGE BLVD STE 400 BREA CA 92821
Phone: 7145789600 Fax: 7145789672 Email: ESTIMATING@SULLY-MILLER.COM
Services needed: Services needed: Sully-Miller is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: Cold Plane, Concrete-Rapid Set, Construction Area Signs, Electrical, Erosion Control, Fencing, Guard Rail, Minor Concrete, Striping & Marking, Survey, Traffic Control, WPCP, Materials, Rental Equipment, Trucking.
Requirements: Requirements: Sully-Miller Contracting Company is signatory to Operating Engineers, Laborers, Cement Masons and Carpenters unions. 100% performance and payment bonds may be required for the full amount of subcontract price. We intend to seriously negotiate with all qualified DBE subcontractors and suppliers for project participation. Assistance is available for any Bonding, Line of Credit, Insurance, Equipment, Supplies, Materials and technical assistance or information related to the plans and specifications that are requirement for the work. Plans and specifications are available for review on the Sully-Miller website www.sully-millerplans.com. Sully-Miller Contracting Company is an equal opportunity employer.
Date posted: 02/02/2018
Contractor: Pave-Tech Inc. Contact: Daniel Zavalani
Address: 2231 La Mirada Drive Vista, CA 92081
Phone: 760-727-8700 Fax: 760-727-8702 Email: mainoffice@pave-tech.com
Services needed: Pave-Tech Inc. is seeking certified and qualified DVBE subcontractors and/or supplier for services to all items of work including: lead compliance plan, construction area signs, traffic control, portable CMS, job site management, water pollution control program, sweeping, trucking/hauling, disposal and material suppliers for Caltrans Contract 11-2N0284, In San Diego County on Route 5 from the USA/Mexico Border to Genesee Avenue overcrossing. Pave-Tech Inc. is an Equal Opportunity Employer. Pave-Tech has union labor agreements. Assistance is available in obtaining bonds, lines of credit, insurance or other technical information. Plans and Specifications are available from owner. Please contact our office at 760-727-8700 for more information. Certification must be faxed to 760-727-8702. Sub-contractors must be registered with the Department of Industrial relations and have a DIR number prior to the bid.
Requirements:
Date posted: 02/05/2018
Contractor: Steve Manning Construction, Inc. Contact: Bill Spoon
Address: 5211 Churn Creek Road Redding, CA 96002
Phone: 530-222-0810 Fax: 530-222-4908 Email: admin@smci-const.com
Services needed: Steve Manning Construction is requesting quotes from all qualified subcontractors and suppliers including certified DVBE firms. Items of particular interest are: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN, PREPARE WATER POLLUTION CONTROL PROGRAM, TEMPORARY CONCRETE WASHOUT, TREATED WOOD WASTE, CONTRACTOR-SUPPLIED BIOLOGIST, DRY SEED, STRAW, MINOR HOT MIX ASPHALT, PLACE HOT MIX ASPHALT DIKE, PLACE HOT MIX ASPHALT, STRUCTURAL CONCRETE, DRAINAGE INLET, 18?CORRUGATED STEEL PIPE, 24? CORRUGATED STEEL PIPE, 26? CORRUGATED STEEL PIPE, 24? CORRUGATED STEEL PIPE DOWNDRAIN, 36? CORRUGATED STEEL PIPE DOWNDRAIN, 10? FLUME DOWNDRAIN, 10? TAPERED INLET, 24? ANCHOR ASSEMBLY, 36? ANCHOR ASSEMBLY, 10? FLUME ANCHOR ASSEMBLY, 36? CORRUGATED STEEL PIPE INLET, 24? CORRUGATED STEEL PIPE ENERGY DISSIPATOR, 36? CORRUGATED STEEL PIPE ENERGY DISSIPATOR, DEBRIS RACK CAGE, ABANDON CULVERT, ABADON INLET, REMOVE OVERSIDE DRAIN, REMOVE CULVERT, REMOVE INLET, REMOVE HEADWALL, SAND BACKFILL, RECONSTRUCT CONCRETED-RSP, MINOR CONCRETE, MISC. IRON STEEL, MARKER (CULVERT), RESET MARKER, RESET ROADSIDE SIGN, RESET GUARDRAIL, FURNISH GUARDRAIL ELEMENT, RECONSTRUCT GUARDRAIL
Requirements: Steve Manning Construction is a Union signatory contractor, as such all subcontractors must be signatory or willing to sign. We are an equal opportunity employer. Subcontractors must possess a current contractor?s license, DIR registration, insurance coverage, and worker?s compensation for the entire length of the contract. Please call if you need assistance in obtaining insurance, bonding, equipment, materials and/or supplies. Plans and specifications can be viewed at our office located at 5211 Churn Creek Rd. Redding CA 96002 or call if you need any additional project information. Steve Manning Construction, Inc. will work cooperatively with all qualified subcontractors and suppliers interested in work on this project to identify opportunities to break items into economically feasible packages.
Date posted: 02/05/2018
Contractor: Pave-Tech Inc. Contact: Daniel Zavalani
Address: 2231 La Mirada Drive Vista, CA 92081
Phone: 760-727-8700 Fax: 760-727-8702 Email: mainoffice@pave-tech.com
Services needed: Pave-Tech Inc. is seeking certified and qualified DVBE subcontractors and/or supplier for services to all items of work including: lead compliance plan, construction area signs, traffic control, portable CMS, job site management, water pollution control program, sweeping, trucking/hauling, disposal and material suppliers for Caltrans Contract 06-0X4804, In Kern County near Grapevine from 0.7 mile North of Junction 5/99 separation to Tulare County line road overcrossing. Pave-Tech Inc. is an Equal Opportunity Employer. Pave-Tech has union labor agreements. Assistance is available in obtaining bonds, lines of credit, insurance or other technical information. Plans and Specifications are available from owner. Please contact our office at 760-727-8700 for more information. Certification must be faxed to 760-727-8702. Sub-contractors must be registered with the Department of Industrial relations and have a DIR number prior to the bid.
Requirements:
Date posted: 02/05/2018
Contractor: Pave-Tech Inc. Contact: Daniel Zavalani
Address: 2231 La Mirada Drive Vista, CA 92081
Phone: 760-727-8700 Fax: 760-727-8702 Email: mainoffice@pave-tech.com
Services needed: Pave-Tech Inc. is seeking certified and qualified DVBE subcontractors and/or supplier for services to all items of work including: lead compliance plan, construction area signs, traffic control, portable CMS, job site management, water pollution control program, sweeping, trucking/hauling, disposal and material suppliers for Caltrans Contract 11-2N0294, In San Diego County from Genesee Avenue overcrossing to San Diego/Orange County line. Pave-Tech Inc. is an Equal Opportunity Employer. Pave-Tech has union labor agreements. Assistance is available in obtaining bonds, lines of credit, insurance or other technical information. Plans and Specifications are available from owner. Please contact our office at 760-727-8700 for more information. Certification must be faxed to 760-727-8702. Sub-contractors must be registered with the Department of Industrial relations and have a DIR number prior to the bid.
Requirements:
Date posted: 02/05/2018
Contractor: Granite Construction Company Contact: Teresa Rothney
Address: 715 Comstock Street Santa Clara, CA 95054
Phone: 408-327-7013 Fax: 408-327-7090 Email: teresa.rothney@gcinc.com
Services needed: Granite Construction Company (Granite) is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: Steel Supplier, Construction Area Signs, Remove Bridge Item, Clearing & Grubbing, Hydroseeding, Erosion Control, Temp Erosion Control, Concrete Pumping, Asphalt Concrete (Place), Ac Dike And Misc Paving, Minor Concrete Structure, Reinforcing Steel, Misc Iron & Steel Frame, Cover & Grate, Fencing, Temporary Fencing, Object Marker, Metal Beam Guard Railing, Concrete Barrier, Thermoplastic Traffic Stripe & Marking, Painted Traffic Stripe & Marking, Pavement Marking, Lead Compliance, Swppp Planning, Street Sweeping Truck, Trucker Broker
Requirements: Granite Construction Company (Granite) is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. No bid shall be accepted nor any subcontract entered into without proof of the Subcontractor?s current registration to perform public work pursuant to Section 1725.5 with the DIR https://efiling.dir.ca.gov/PWCR/Search.action. 100% performance and payment bonds may be required for the full amount of subcontract price. Granite will pay for bond premium up to 1.5%. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Granite?s requirements and will be required to sign the standard Granite Subcontract Agreement. A copy of the insurance requirements and agreement can be obtained by contacting the estimator. Plans and specifications are available for viewing at our office located at 715 Comstock St., Santa Clara, CA., 95054 or Caltrans Web site http://www.dot.ca.gov/hq/esc/oe/contract_awards_services.html Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies. Granite intends to work cooperatively with all qualified firms seeking work on this project. Granite is an equal opportunity employer. Portions of work can be made available upon request prior to bid date. Please call if any assistance is needed.
Date posted: 02/05/2018
Contractor: Bugler Construction, Inc. Contact: Glenn Bugler
Address: 4847 Hopyard Rd. Suite 4-395 Pleasanton, CA, 94588
Phone: 925-416-0700 Fax: 925-416-7746 Email: buglerconst@comcast.net
Services needed: Lead Plan, Construction Area Signs, PCMS, K Rail, Job Site Management, Prepare SWPPP, Street Sweeping, MBGR work, Hydroseed, Place Asphalt Dike, Minor Concrete, Chain Like Fence, Steel Access Gate, Pavement Markings Traffic Control.
Requirements: Bugler Construction is signatory to the Carpenters, laborers, Operating Engineers and Cement Mason Unions. Subcontractors must possess a current California Contractors License and be registered with the Department of Industrial Relations. Bugler will provide assistance in obtaining insurance required. Bugler will also provide assistance in obtaining access to lines of credit, equipment, supplies, materials or other technical assistance to all potential subcontractors and suppliers. Bugler is willing to break out smaller portions of work for all qualified suppliers and subcontractors to particiapte. Plans and Specifications are available for viewing at our Pleasanton Office and are on the Caltrans Office of Engineer Web Site. Bugler will work cooperatively with all qualified firms seeking work on this project and is an equal opportunity employer.
Date posted: 02/05/2018
Contractor: American Civil Constructors West Coast LLC Contact: Estimating
Address: 2990 Bay Vista Court Benicia CA 94510
Phone: 707-746-8028 Fax: 707-747-0593 Email: estimatingwc@accbuilt.com
Services needed: ACC West Coast would like to encourage all DVBE and Small Business companies whom are classified to perform any of the scopes of work relevant to this project to submit quotes. We are currently requesting quotes for all scopes of work and bid items related to this project. Please see the list of bid items associated with this project for more information. Other items of work in which quotes are greatly desired: Construction Rentals, Misc. Construction Supplies, Flat-Bed and End Dump Hourly Trucking Rates. We will also consider subcontracting other scopes of work offered by interested companies.
Requirements: ACC will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Please call to discuss how ACC West Coast can assist you in your bonding, credit and/or insurance needs. Assistance may include, but is not limited to: Contacting bonding and/or insurance companies on your behalf, arranging with sureties incremental or phased bonding, obtaining necessary equipment, supplies and/or materials. Subcontractors may be required to provide a bond and must have a valid contractor?s license and current insurance coverage that meets ACC and project requirements. Selected subcontractors will be required to sign our standard subcontractor agreement. Please fax quotes no later than 10:00am on bid day. If you have any questions, please contact the project estimator. Plans and Specifications may be viewed at our Benicia office. Quotes must include inclusions and exclusions, and must be valid for a minimum of 60 days following the bid date. ACC is an equal opportunity employer.
Date posted: 02/05/2018
Contractor: American Civil Constructors West Coast LLC Contact: Estimating
Address: 2990 Bay Vista Court Benicia CA 94510
Phone: 707-746-8028 Fax: 707-747-0593 Email: estimatingwc@accbuilt.com
Services needed: ACC West Coast would like to encourage all DVBE and Small Business companies whom are classified to perform any of the scopes of work relevant to this project to submit quotes. We are currently requesting quotes for all scopes of work and bid items related to this project. Please see the list of bid items associated with this project for more information. Other items of work in which quotes are greatly desired: Construction Rentals, Misc. Construction Supplies, Flat-Bed and End Dump Hourly Trucking Rates. We will also consider subcontracting other scopes of work offered by interested companies.
Requirements: ACC will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Please call to discuss how ACC West Coast can assist you in your bonding, credit and/or insurance needs. Assistance may include, but is not limited to: Contacting bonding and/or insurance companies on your behalf, arranging with sureties incremental or phased bonding, obtaining necessary equipment, supplies and/or materials. Subcontractors may be required to provide a bond and must have a valid contractor?s license and current insurance coverage that meets ACC and project requirements. Selected subcontractors will be required to sign our standard subcontractor agreement. Please fax quotes no later than 10:00am on bid day. If you have any questions, please contact the project estimator. Plans and Specifications may be viewed at our Benicia office. Quotes must include inclusions and exclusions, and must be valid for a minimum of 60 days following the bid date. ACC is an equal opportunity employer.
Date posted: 02/05/2018
Contractor: Ghilotti Construction Company, Inc. Contact: Jim Petnic
Address: 246 Ghilotti Avenue Santa Rosa, CA 95407
Phone: 707-585-1221 Fax: 707-585-1601 Email: jimp@ghilotti.com
Services needed: Ghilotti Construction Company, Inc. is seeking certified DBE subcontractors, suppliers & truckers for quotes including, but not limited to, the following scopes of work: CONSTRUCTION AREA SIGNS, ROADSIDE SIGNS, TRAFFIC CONTROL, RESET-ADJUST ROADWAY ITEMS, MODIFY EXISTING ELECTRICAL SYSTEM, COLD PLANE ASPHALT CONCRETE PAVEMENT, SLURRY SEAL, AC DIKE, FABRIC & OILS, METAL BEAM GUARD RAILING, THERMOPLASTIC STRIPING & PAVEMENT MARKINGS, SAND COVER (SEAL), ASPHALT-RUBBER BINDER, ASPHALTIC EMULSION (FOG SEAL COAT), PRECOATED SCREENINGS, MICRO-SURFACING, EROSION CONTROL, STREET SWEEPING, MATERIAL SUPPLIER & TRUCKING. Submit quotes by Noon on bid date. Contact our estimator for more information. GCC is available to discuss breaking out any portion of work to encourage minority participation.
Requirements: Mr. Jim Petnic (707/585-1221 or jimp@ghilotti.com) is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. GCC may also assist in obtaining any necessary equipment, supplies, materials or related services. (Please note: G.C.C. may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108. G.C.C. will pay bond premiums up to 1 1/2% of contract cost. G.C.C. is a UNION CONTRACTOR. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.) Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. Plans may also be viewed or purchased through local plan rooms, builder's exchanges, or Dodge Scan. Ghilotti Construction Company encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project. Req: By submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. GCC's written subcontract document execution is required of all successful subcontract bidders. A copy is available for inspection on GCC's website (www.ghilotti.com/subcontractors/documents) and/or can be provided upon written request prior to bid submission. Inconsistent bid terms and conditions shall be void. Insurance: As per our insurance requirements, your bid must include the cost of naming GCC as additional insured; including completed operations coverage; Use form CG-2010-1185 or equivalent; include Primary and Non-Contributing wording on your certificate of insurance and waiver of subrogation is required. We are an equal opportunity employer.
Date posted: 02/05/2018
Contractor: Golden State Bridge, Inc. Contact: David Riccitiello
Address: 3701 Mallard Drive Benicia, CA 94510
Phone: 925-372-8000 Fax: 925-372-8001 Email: dave@gsbridge.com
Services needed: Lead Compliance Plan, Traffic Control System, Portable Changeable Message Sign, Prepare WPCP, Temp. Check Dam, Temp. Drainage Inlet Protection, Temp. Fiber Roll, Street Sweeping, Temp. Concrete Washout, Work Area Monitoring (Bridge), Structure Excavation (Bridge), Structure Backfill (Bridge), Move-In/Move-Out (Erosion Control), Imported Topsoil, Bonded Fiber Matrix, Rolled Erosion Control Product (Netting), Fiber Rolls, Compost, Temp. Support, Temp. Lateral Bracing, Jacking Superstructure (Retrofit), Structural Concrete; Bridge, Drill and Bond (High Strength Anchor Bolt), PTFE Spherical Bearing, Isolation Bearing (Lead Core Rubber), Bar Reinforcing Steel (Bridge), Asphalt Membrane Waterproofing, Structural Steel (Bridge), Paint Structural Steel (Existing Bridge), Clean and Paint Structural Steel, Spot Blast Clean, Spot Blast Clean and Pint Undercoat, Composite Pedestal Strengthening, Bridge Removal (Portion), Steel Column Casing (Bolted), Misc. Metal (Bridge), Temp. Fence (Type CL-6), Chain Link Fence (Type CL-6), Remove Fence.
Requirements: Please call to discuss how Golden State Bridge, Inc. can assist you in your bonding, credit, and/or insurance needs. Also, let us know if you need assistance in obtaining necessary equipment, supplies, or materials for this project. If you are interested in submitting a subcontractor bid for this project, please fax us your quote at 925-372-8001. Should you have any questions regarding this bid, you may contact David Riccitiello at 925-372-8000 or dave@gsbridge.com. Please be advised, Contractors and subcontractors must register with The D.I.R. (Department of Industrial Relations) in order to bid on public works projects. Registration with The D.I.R. costs $300 and covers the fiscal year (July 1 to June 30th). To verify the status of your DIR number, please visit http://www.dir.ca.gov/Public-Works/Contractors.html.
Date posted: 02/05/2018
Contractor: Telfer Pavement Technologies, LLC Contact: Rick Arias
Address: 4522 Parker Avenue Suite 350 McClellan, CA. 95652
Phone: 916-383-1756 Fax: 916-383-4084 Email: estimating@telferpavements.com
Services needed: Telfer Pavement Technologies, LLC is seeking quotes from Qualified DVBE subcontractors and suppliers for work including but not limited to: Materials supply/delivery, Trucking, Lead Compliance Plan, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign, Job Site Management, Prepare Water Pollution Control Program, Roadway Excavation, Precoated Screenings, HMA Type A, RHMA Gap Graded, Hot Mix Asphalt Dike and Removal (Type A,C,E,F), Cold Plane AC Pavement, Pavement Marker (Retroreflective), 6" Rumble Strips, 12" Rumble Strips, 6" Traffic Stripe, 8" Traffic Stripe, Pavement Marking, 6" Traffic Stripe with Contrast, Electrical, Etc. Telfer Pavement Technologies, LLC will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. All Supplier and Subcontractor proposals shall be in strict accordance with said project plans, specifications, and any addenda issued.
Requirements: DVBE Subcontractors must possess a current contractor?s license, worker's compensation insurance coverage during the entire length of the contract. Performance and Payment bonds may be required. Plans and specification can be obtained from Cal Trans, your local plan room, or may be viewed through our office. You can contact our office if you need assistance in bonding, lines of credit, insurance, necessary equipment, supplies, materials or services required for this job.
Date posted: 02/05/2018
Contractor: Calpromax Engineering Contact: Estimator
Address: 650 N. Rose Dr.#186 Placentia
Phone: 714-573-4599 Fax: 714-459-7088 Email: calpromax@gmail.com
Services needed: CALPROMAX ENGINEERING is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Channelizer, K-Rail, Temp. Crash Cushions, SWPPP and Reports, Temporary BMPs, Treated Wood Waste, CIDH Piles, Sign Structure (Truss), Polyester Concrete, Bridge Removal, Detectable Warning Surface, Minor Concrete, Construction Survey, Manhole Frame and Cover, Misc. Metal, Modify Existing Signal and Lighting, Striping, Chain Link Railing Type 3, Tubular Handrailing, Concrete Barrier (Type 732SW Modified), Salvage Metal Bridge Railing, Temp. Lighting System, Modify Existing Electrical System.
Requirements: -To view or obtain plans, specs, and project document, FIRMS should contact the CONTRACTOR to get required project resource. - The CONTRACTOR will provide FIRMS, if requested, with required assistance in bonding, insurance. -Quotes per project bid items must be submitted before the due bid date and time to allow proper evaluation. -Quotes are required to be in accordance with project plans, specs, and good for the entire contract duration. - The project is a prevailing wage public job. The FIRM's quote must consider all terms related to prevailing wages terms. - FIRMS must possess and maintain a current contractor license, insurance, and worker compensation coverage during the project - FIRMS must be CUF "Commercial Useful Function" so the participation goal is accepted towards the Good Faith Effort. -100% payment bond and performance bond for the full amount of the subcontract price may be required. -FIRMS that submit their quote explicitly acknowledge and agree to all above terms and responsibilities. - We are an equal opportunity employer. We do not discriminate against any qualified contractors, subcontractors, suppliers -The firm must be registered with Department of Industrial Relation and should have a current DIR number.
Date posted: 02/06/2018
Contractor: Peterson Chase General Engineering Construction Inc. Contact: Kali Goglanian
Address: 16351 Construction Circle West Irvine, CA 92606
Phone: 949-252-0441 Fax: 949-252-0266 Email: bids@petersonchase.com
Services needed: Peterson-Chase General Engineering Construction, Inc. is requesting quotes from all qualified subcontractors and suppliers including certified DVBE firms for the following items of work, including but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Retroreflective Sheeting (Type Xi) For Construction Area Signs, Portable Changeable Message Sign (Ls), Job Site Management, Prepare Water Pollution Control Program, Temporary Concrete Washout, Lean Concrete Base Rapid Setting, Slurry Seal, Prepaving Inertial Profiler, Replace Asphalt Concrete Surfacing, Prime Coat, Rubberized Hot Mix Asphalt (Gap Graded), Data Core, Tack Coat, Cold Plane Asphalt Concrete Pavement, Individual Precast Slab Replacement, Remove Concrete Pavement (Cy), Grind Existing Concrete Pavement, Survey Monument (Type D) , Remove Pavement Marker (Ls) , Pavement Marker (Retroreflective), Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), Thermoplastic Pavement Marking (Enhanced Wet Night Visibility), Thermoplastic Traffic Stripe (Sprayable), Remove Thermoplastic Pavement Marking, 12" Rumble Strip (Asphalt Concrete Pavement), Maintaining Existing Traffic Management System Elements During Construction, Modifying Existing Electrical SystemPlease email your quotes to Bids@petersonchase.com
Requirements: Peterson-Chase General Engineering Construction Inc. can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Dick Vogels at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Caltrans? requirements and will be required to sign the standard Peterson-Chase GEC., Inc. Subcontract Agreement. Plans and specifications are available to be viewed in our office located at 16351 Construction Circle West, Irvine, CA 92606, between 8:00 AM and 3:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Peterson-Chase GEC., Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. Peterson Chase General Engineering Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.
Date posted: 02/06/2018
Contractor: Peterson Chase General Engineering Construction Inc. Contact: Kali Goglanian
Address: 16351 Construction Circle West Irvine, CA 92606
Phone: 949-252-0441 Fax: 949-252-0266 Email: bids@petersonchase.com
Services needed: Peterson-Chase General Engineering Construction, Inc. is requesting quotes from all qualified subcontractors and suppliers including certified DVBE firms for the following items of work, including but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign (Ls), Job Site Management, Prepare Water Pollution Control Program, Asbestos Compliance Plan, Remove Yellow Thermoplastic Traffic Stripe (Hazardous Waste), Contractor-Supplied Biologist (Ls),Temporary High-Visibility Fence, Clearing And Grubbing (Ls), Clean Expansion Joint, Joint Seal (Mr 1"), Joint Seal (Mr 1 1/2"), Bonded Joint Seal (Mr 2"), Public Safety Plan, Remove Asphalt Concrete Surfacing, Remove Concrete Deck Surface, Prepare Concrete Bridge Deck Surface, Treat Bridge Deck, Furnish Bridge Deck Treatment Material, Paint Bridge Identification , Remove Pavement Marker , Pavement Marker (Retroreflective), Furnish Single Sheet Aluminum Sign (0.063"-Unframed), Roadside Sign - One Post, Thermoplastic Pavement Marking (Enhanced Wet Night Visibility), Paint Traffic Stripe (2-Coat), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), Remove Thermoplastic Traffic Stripe, Remove Thermoplastic Pavement Marking. Please email your quotes to Bids@petersonchase.com
Requirements: Peterson-Chase General Engineering Construction Inc. can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Dick Vogels at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Caltrans? requirements and will be required to sign the standard Peterson-Chase GEC., Inc. Subcontract Agreement. Plans and specifications are available to be viewed in our office located at 16351 Construction Circle West, Irvine, CA 92606, between 8:00 AM and 3:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Peterson-Chase GEC., Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. Peterson Chase General Engineering Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.
Date posted: 02/06/2018
Contractor: Peterson Chase General Engineering Construction Inc. Contact: Kali Goglanian
Address: 16351 Construction Circle West Irvine, CA 92606
Phone: 949-252-0441 Fax: 949-252-0266 Email: bids@petersonchase.com
Services needed: Peterson-Chase General Engineering Construction, Inc. is requesting quotes from all qualified subcontractors and suppliers including certified DVBE firms for the following items of work, including but not limited to: Construction Area Signs, Traffic Control System, Portable Changeable Message Sign (Ea), Job Site Management, Prepare Water Pollution Control Program ,Temporary Concrete Washout ,Shoulder Backing ,Asphaltic Emulsion (Fog Seal Coat), Rubberized Hot Mix Asphalt (Gap Graded), Tack Coat, Cold Plane Asphalt Concrete Pavement, Drill And Bond (Dowel Bar), Spall Repair (Polyester Concrete), Individual Slab Replacement (Rsc), Replace Joint Seal (Asphalt Rubber), Replace Joint Seal (Silicone), Pavement Marker (Retroreflective), 6" Traffic Stripe (Warranty), 6" Traffic Stripe With Contrast (Warranty) (Broken 36-12), 8" Traffic Stripe With Contrast (Warranty) (Broken 12-3)Please email your quotes to Bids@petersonchase.com
Requirements: Peterson-Chase General Engineering Construction Inc. can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Dick Vogels at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Caltrans? requirements and will be required to sign the standard Peterson-Chase GEC., Inc. Subcontract Agreement. Plans and specifications are available to be viewed in our office located at 16351 Construction Circle West, Irvine, CA 92606, between 8:00 AM and 3:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Peterson-Chase GEC., Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. Peterson Chase General Engineering Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.
Date posted: 02/06/2018
Contractor: Bay Cities Paving and Grading, Inc. Contact: Russ Olney
Address: 1450 Civic Ct., Bldg B #400 Concord, CA 94520
Phone: 925-687-6666 Fax: 925-687-2122 Email: rolney@baycities.us
Services needed: Construct HOV lanes; develop water supply, construction area signs, traffic control system, temporary traffic stripe, temporary railing (type K), temporary creek diversion system, prepare SWPPP, temporary erosion control, temporary hydraulic mulch (bonded fiber matrix), street sweeping, remove yellow thermoplastic traffic stripe (hazardous waste), ADL burial location report, treated wood waste, noise monitoring, clearing and grubbing, roadway excavation, roadway excavation (aerially deposited lead), structure excavation, structure backfill, pervious backfill, concrete backfill, lean concrete backfill, roadside clearing, prune existing plants, landscape, plant establishment work, check and test existing irrigation facilities, schedule 40 pipe supply line, imported biofiltration topsoil, rolled erosion control product (netting), erosion control, class 2 and 4 aggregate base, lean concrete base, hot mix asphalt, data core, place hot mix asphalt dike, tack coat, cold plane asphalt concrete pavement, remove base and surfacing, soil nail, steel soldier pile, 30? drilled hole, 60? drilled hole, structural concrete retaining wall, structural concrete box culvert, structural concrete headwall, structural concrete drainage inlet, minor concrete backfill, fractured rib texture, precast concrete lagging, bar reinforcing steel (retaining wall), bar reinforcing steel (box culvert), structural shotcrete, clean and paint soldier piling, spot blast clean and paint undercoat, alternative pipe culvert, concrete backfill (RSC), perforated plastic pipe underdrain, adjust manhole, rock slope protection (light method), rock slope protection fabric (class 8), minor concrete, miscellaneous iron and steel, prepare and paint concrete, chain link fence, chain link gate, remove chain link fence, remove pavement marker, pavement marker (retroreflective), object marker, special marker, roadside signs, single sheet aluminum signs, metal (barrier mounted sign), Midwest guardrail, vegetation control (minor concrete), double thrie beam barrier, concrete barrier, thermoplastic pavement marking, thermoplastic traffic stripe (enhanced wet night visibility), maintaining existing traffic management system elements during construction, temporary ramp metering, temporary traffic monitoring station system, temporary lighting system, modifying existing electrical system
Requirements: Plans and specifications for the Project are available for review at our office at 1450 Civic Court, Concord, (925) 687-6666 100% Performance, Payment Bonds by an admitted surety naming prime contractor as oblige, in the full amount of the subcontractors bid shall be required. Retention will be withheld if subcontractor fails to provide bonds. Bay Cities Paving & Grading, Inc. will pay bond premium up to 2%. Please be advised, Contractors and Subcontractors must register with the D.I.R (Department of Industrial Relations) in order to bid on public works projects. Registration with the D.I.R. costs $300 and covers the fiscal year (July 1 to June 30th). To verify the status of your D.I.R. number, please visit: http://www,dir.ca.gov/Public-Works/Contractors.html. Bay Cities Paving & Grading is signatory to the following Unions: Operators, Laborers, Teamsters & Cement Masons. Call Russ Olney for assistance with credit line, bonding, insurance, equipment, supplies and materials Bay Cities Paving & Grading, Inc. is an equal opportunity employer
Date posted: 02/06/2018
Contractor: Comet Electric, Inc Contact: Annalisa Jenrich
Address: 21625 Prairie Street Chatsworth, CA 91311
Phone: 818-340-0965 Fax: 818-340-4033 Email: annalisajenrich@cometelectric.com
Services needed:
Requirements:
Date posted: 02/06/2018
Contractor: Chrisp Company Contact: Aaron Patton
Address: 43650 Osgood Road Fremont, Ca. 94539
Phone: 510-656-2840 Fax: 510-656-2397 Email: apatton@chrispco.com
Services needed: Chrisp Company is requesting quotes from all qualified subcontractors and suppliers including certified DVBE Firms for the following items of work, including but not limited to the following: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL, PORTABLE CMS, JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM and MATERIAL SUPPLIES. Subcontractors are required to meet insurance and labor requirements. Subcontractors may be required to provide 100% Payment and Performance Bonds. Please contact us for assistance. FIRMS must include copy of business license with quote. Quotes are required to be in accordance with the plans and specifications and good for the contract duration as specified in the bid documents. We intend to help and work with all qualified firms seeking participation on this project. Feel free to call our office with any questions you may have. DO NOT EMAIL QUOTES. PLEASE FAX TO 510.656.2397. QUOTES MUST BE FAXED AT LEAST 2 HOURS BEFORE BID DUE TIME.
Requirements: To view or obtain plans, specs, and project document, FIRMS should contact the CONTRACTOR to get required project resource. - The CONTRACTOR will provide FIRMS, if requested, with required assistance in bonding, insurance. -Quotes per project bid items must be submitted before the due bid date and time to allow proper evaluation. -Quotes are required to be in accordance with project plans, specs, and good for the entire contract duration. - The project is a prevailing wage public job. The FIRM's quote must consider all terms related to prevailing wages terms. - FIRMS must possess and maintain a current contractor license, insurance, and worker compensation coverage during the project -100% payment bond and performance bond for the full amount of the subcontract price may be required. -FIRMS that submit their quote explicitly acknowledge and agree to all above terms and responsibilities. - We are an equal opportunity employer. We do not discriminate against any qualified contractors, subcontractors, suppliers -The firm must be registered with Department of Industrial Relation and should have a current DIR number.
Date posted: 02/07/2018
Contractor: Comet Electric, Inc Contact: Annalisa Jenrich
Address: 21625 Prairie Street Chatsworth, CA 91311
Phone: 818-340-0965 Fax: 818-340-4033 Email: annalisajenrich@cometelectric.com
Services needed:
Requirements:
Date posted: 02/07/2018
Contractor: FBD Vanguard Construction Contact: Jason Muller
Address: 651 Enterprise Court Livermore, CA 94550
Phone: 925-245-1300 Fax: 925-245-1007 Email: jmuller@vc-inc.net
Services needed: FBD Vanguard Construction, Inc. is requesting quotes from all certified DVBE & SBE subcontractors, suppliers and trucking firms for the following items of work including, but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, PCMS, Prepare WPCP, Remove Yellow Thermoplastic Stripe (Hazardous Waste), Hot Mix Asphalt, Tack Coat, Cold Plane AC Pavement, Clean Expansion Joint, Joint Seal, Remove AC Surfacing, Prepare Concrete Bridge Deck Surface, Furnish & Place Polyester Concrete Overlay, Furnish Bridge Deck Treatment Material, Treat Bridge Deck, Pavement Markers, and Traffic Stripe Tape.
Requirements: FBD Vanguard Construction Inc. can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Jason Muller at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractors license, insurance and workers compensation coverage meeting Caltrans requirements and will be required to sign the standard FBD Vanguard Construction, Inc. subcontract Agreement. Plans and specifications are available to be viewed in our office located at 651 Enterprise Court Livermore, Ca 94550 between 8:00 AM and 5:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. FBD Vanguard Construction, Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. FBD Vanguard Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.
Date posted: 02/07/2018
Contractor: FBD Vanguard Construction Contact: Jason Muller
Address: 651 Enterprise Court Livermore, CA 94550
Phone: 925-245-1300 Fax: 925-245-1007 Email: jmuller@vc-inc.net
Services needed: BD Vanguard Construction, Inc. is requesting quotes from all certified DVBE & SBE subcontractors, suppliers and trucking firms for the following items of work including, but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Prepare WPCP, Remove Sign Structure Walkway, Remove Roadside Sign, Remove Sign from Sign Frame, Furnish Formed Panel Sign, Furnish Laminated Panel Sign, Furnish Single Sheet Aluminum Sign (0.080" Unframed), Retroreflective sheeting, Install Sign (Strap & Saddle Bracket Method), Install Sign Panel on Existing Frame, and Electrical.
Requirements: FBD Vanguard Construction Inc. can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Jason Muller at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractors license, insurance and workers compensation coverage meeting Caltrans requirements and will be required to sign the standard FBD Vanguard Construction, Inc. subcontract Agreement. Plans and specifications are available to be viewed in our office located at 651 Enterprise Court Livermore, Ca 94550 between 8:00 AM and 5:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. FBD Vanguard Construction, Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. FBD Vanguard Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.
Date posted: 02/07/2018
Contractor: Griffith Company Contact: Steve Devers
Address: 1128 Carrier Parkway Avenue Bakersfield, CA 93308
Phone: 661-392-6640 Fax: 661-393-9525 Email: sdevers@griffithcompany.net
Services needed: Griffith Company is requesting quotes from all qualified subcontractors and suppliers including certified DVBE firms for the following items of work, including but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign, WPCP, Prepaving Inertial Profiler, Prepaving Grindind Day, HMA (Type A), Data Core, Tack Coat, Cold Plane Asphalt Pavement, Pavement Marker (Retroreflective-Recessed), 6? Two-Component Paint Traffic Stripe, Hauling
Requirements: Requirements: Griffith Company is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons, and Carpenters Unions. 100% performance and payment bonds required for the full amount of the subcontract price. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation insurance coverage meeting Griffith?s requirements. A copy of the insurance requirements and agreements can be obtained by contacting the Estimator. Please call if you need assistance in obtaining bonding, insurance, equipment, materials, and/or supplies. Griffith Company intends to work cooperatively with all qualified firms seeking work on this project. Griffith Company is an Equal Opportunity Employer.
Date posted: 02/07/2018
Contractor: Disney Construction Inc. Contact: Amir Mutwakil
Address: 859 Cowan Road Suite #3 Burlingame
Phone: (510) 259-9545 E Fax: (650) 259-9651 Email: estimating@disneyconstruction.com
Services needed: Lead Compliance Plan, Traffic Control System, Portable Changeable Message Sign, Prepare WPCP, Temp. Check Dam, Temp. Drainage Inlet Protection, Temp. Fiber Roll, Street Sweeping, Temp. Concrete Washout, Work Area Monitoring (Bridge), Structure Excavation (Bridge), Structure Backfill (Bridge), Erosion Control (Various Items), Imported Topsoil, Bonded Fiber Matrix, Rolled Erosion Control Product (Netting), Fiber Rolls, Compost, Temp. Support, Temp. Lateral Bracing, Jacking Superstructure (Retrofit), Structural Concrete; Bridge, Drill and Bond (High Strength Anchor Bolt), PTFE Spherical Bearing, Isolation Bearing (Lead Core Rubber), Bar Reinforcing Steel (Bridge), Asphalt Membrane Waterproofing, Structural Steel (Bridge), Paint Structural Steel (Existing Bridge), Clean and Paint Structural Steel, Spot Blast Clean, Spot Blast Clean and Pint Undercoat, Composite Pedestal Strengthening, Bridge Removal (Portion), Steel Column Casing (Bolted), Misc. Metal (Bridge), Temp. Fence (Type CL-6), Chain Link Fence (Type CL-6), Remove Fence, Trucking, Hauling, Site Services and Material Supplies.
Requirements: Disney Construction Inc. is an Equal Opportunity Employer and is requesting quotes from all qualified subcontractors and suppliers. Disney Construction Inc. is willing to breakout portions of work to encourage DBE participation. Please contact us if you need assistance with the following: (a) Contacting bonding and/or insurance companies, (b) Arranging with sureties incremental or phased bonding for DBEs, (c) Paying for the cost of the bond insurance, (d) Waving bonding or insurance requirements, (e) Referrals to Business Development Centers for obtaining bonding, insurance, or lines of credit. 100% performance and payment bonds with a surety company subject to approval of Disney Construction, Inc. are required of subcontractors for this project. Disney Construction, Inc. will pay bond premium up to 1.5%. Subcontractor must possess a valid contractor?s license, current insurance, worker?s compensation meeting Disney Construction?s requirement and be registered under Public Works Contractors Registration Law [SB 854]. Subcontractors will be required to abide by terms and conditions of the AGC Master Labor Agreements and to execute an agreement utilizing the latest DCI Subcontract incorporating prime contract terms and conditions, including payment provisions. Disney Construction is signatory to the Laborers, Carpenters, and Operator Engineers. Disney Construction, Inc.?s listing of a subcontractor is not to be construed as an acceptance of all the subcontractor?s conditions or exceptions included with the subcontractor?s price quote. Please send in you scope letters 2 days prior to bid day and your quote 24 hours prior to bid. Please contact Amir Mutwakil at (650) 259-9545 ext. 110 with any questions, or email estimating@disneyconstruction.com. Please note that all Contractors and subcontractors must register with The DIR (Department of Industrial Relations) in order to bid on public works projects. Include CSLB License Number and DIR Number on All Quotes Submitted. Plans and specifications can be reviewed at our main office located at 859 Cowan Road Suite #3 in Burlingame CA. Please call to setup an appointment for review.
Date posted: 02/08/2018
Contractor: Hazard Construction Company Contact: Paul Hutchins
Address: 6465 Marindustry Drive San Diego, CA 92
Phone: 858-587-3600 Fax: 858-453-6034 Email: phutchins@hazardcon.com
Services needed: Hazard Construction is seeking qualified and certified DVBE subcontractors, and material and/or equipment suppliers in the areas of work included in, but not limited to, those listed below. A complete set of plans, specifications and any addendums that may be issued for this project are available for your review at no charge in our plan room or download at the agency?s website: http://www.dot.ca.gov/hq/esc/oe/project_ads_addenda/11/11-2N0154/ *** THIS IS A PREVAILING WAGE PROJECT *** SUBTRADES: SWPPP, STRIPING, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL
Requirements: IMPORTANT! We are an Equal Opportunity Employer. We seek and encourage bids from certified SLBE, ELBE, DBE, UDBE, DVBE, SBE, MBE, WBE and OBE businesses. If your scope of work requires materials, please consider and list suppliers on your quote. For all public projects Payment and Performance Bonds are required for 100% of the subcontract amount. Hazard will compensate for up to 3% for the required Bonds. Please contact Hazard Construction Company should you need assistance in obtaining bonding, lines of credit or required insurance, equipment, supplies and or materials. Please visit our website to view Hazard Construction Company?s Insurance Requirements for General Liability, Auto and Workers? Compensation for Subcontractors at http://www.hazardconstruction.com/HCCInsReq.pdf. Please note that the requirements of SB 854 became effective on March 1, 2015. From this point forward All contractors and subcontractors who bid or work on a public works project must register and pay an annual fee to DIR. No Subcontractor may be listed on a public works projects without this registration # and expiration date. The following link leads you to a search website where you can enter the contractor?s legal name or license number https://efiling.dir.ca.gov/PWCR/Search.action
Date posted: 02/08/2018
Contractor: Knife River Construction Contact: Marc Madsen
Address: 1764 Skyway Chico, CA 95928
Phone: 530-891-6555 Fax: 530-894-6220 Email: marc.madsen@kniferiver.com
Services needed: Knife River Construction is requesting quotes from all qualified subcontractors and suppliers including certified DVBE/SBE firms for the following items of work, including but not limited to: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN,JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM, TEMPORARY CONCRETE WASHOUT, TREATED WOOD WASTE, CLEARING AND GRUBBING, SHOULDER BACKING, REPLACE ASPHALT CONCRETE SURFACING, HOT MIX ASPHALT (TYPE A), DATA CORE, PLACE HOT MIX ASPHALT DIKE (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE E), TACK COAT, COLD PLANE ASPHALT CONCRETE PAVEMENT, ADJUST INLET, OBJECT MARKER (TYPE L-1), MIDWEST GUARDRAIL SYSTEM (STEEL POST), ALTERNATIVE IN-LINE TERMINAL SYSTEM, ALTERNATIVE FLARED TERMINAL SYSTEM, SPECIAL BRIDGE RAIL TO W-BEAM ADAPTER, REMOVE GUARDRAIL, RECONSTRUCT GUARDRAIL, RECONSTRUCT TERMINAL SYSTEM (TYPE FLEAT), THERMOPLASTIC TRAFFIC STRIPE (SPRAYABLE), all trucking and supply of materials.
Requirements: Knife River Construction is an Equal Opportunity Employer and is signatory to Operating Engineers, Laborers and Teamsters. 100% payment and performance bonds may be required for full amount of subcontractor price. All subcontractors must be licensed and have liability insurance and workers compensation insurance meeting Knife River Construction's requirements. Knife River Construction is willing to assist with obtaining bonding, insurance, equipment and materials and is willing to break down items into economically feasible packages to encourage participation.
Date posted: 02/08/2018
Contractor: Hazard Construction Company Contact: Kurt Hindman
Address: 6465 Marindustry Drive San Diego, CA 92121
Phone: 858-587-3600 x 1 Fax: 858-453-6034 Email: Khindman@hazardcon.com.com
Services needed: Hazard Construction Company is seeking qualified and certified DVBE Subcontractors and material and/or equipment suppliers in the areas of work include in, but not limited to, those listed below. A complete set of plans, specifications and any addendums that may be issued for this project are available for your review at not charge in our plan room. SUBTRADES: Construction Area Signs, Traffic Control System, Traffic Striping & Pavement Marking, Portable CMS, Prepare SWPPP, Temporary BMP?s, Street Sweeping, Cold Plane, Dowel Bar Supply, Concrete Grinding, Joint Seal, Spall Repair, JPCP (RSC), Asphalt Supply, Ready-Mix Concrete Supply, Rapid Set Concrete Supply.
Requirements: IMPORTANT! We are an Equal Opportunity Employer. We seek and encourage bids from certified SLBE, ELBE, DBE, UDBE, DVBE, SBE, MBE, WBE and OBE businesses. If your scope of work requires materials, please consider and list suppliers on your quote. For all public projects Payment and Performance Bonds are required for 100% of the subcontract amount. Hazard will compensate for up to 3% for the required Bonds. Please contact Hazard Construction Company should you need assistance in obtaining bonding, lines of credit or required insurance, equipment, supplies and or materials. Please visit our website to view Hazard Construction Company?s Insurance Requirements for General Liability, Auto and Workers? Compensation for Subcontractors at http://www.hazardconstruction.com/HCCInsReq.pdf. Please note that the requirements of SB 854 became effective on March 1, 2015. From this point forward All contractors and subcontractors who bid or work on a public works project must register and pay an annual fee to DIR. No Subcontractor may be listed on a public works projects without this registration # and expiration date. The following link leads you to a search website where you can enter the contractor?s legal name or license number https://efiling.dir.ca.gov/PWCR/Search.action
Date posted: 02/08/2018
Contractor: J. McLoughlin Engineering Co., Inc. Contact: Joe McLoughlin
Address: 10641 Fulton Ct. Rancho Cucamonga, CA 91730
Phone: 909-944-1037 Fax: 909-944-3112 Email: Berenice@jmeci.com
Services needed: J. McLoughlin Engineering Co., Inc. (JMECI) is requesting quotes from all qualified subcontractors and suppliers especially certified DBE?s (This project has no DVBE Contract goal) firms for the following items of work, including but not limited to: Trucking, Street Sweeping, Equipment Rental Construction Area Signs, Traffic Control Systems, Portable Changeable Message Sign, Job Site Management, Prepare Water Pollution Control Program, Temp Concrete Washout, Shoulder Backing, Asphalt Emulsion Rubberized Hot Mix Asphalt (Gap Graded), Tack Coat, Cold Plane Asphalt Concrete Pavement, Drill and Bond, Spall Repair, Individual Slab Replacement, Replace Joint Seal, Pavement Marker, and Striping. Quotations will be broken down into comparable packages as reasonably necessary. JMECI will work with interested subcontractors/vendors/suppliers to identify opportunities to break down items into economically feasible packages. PLEASE DO NOT E-MAIL QUOTES.
Requirements: Subcontractors must possess a current contractor?s license, and provide General Liability, Auto and Worker?s Compensation Insurance meeting the minimum requirements required by JMECI and will be required to sign a Subcontract Agreement and / or Purchase Order if necessary. 100% performance and payment bonds may be required for the full amount of subcontract price. JMECI will provide assistance in Bonding, Line of Credit, Insurance, Equipment, Supplies, and Materials if necessary to all qualified subcontractors. Plans and Specifications are available for viewing by appointment only at our office located at 10641 Fulton Ct., Rancho Cucamonga, CA 91730. J. McLoughlin Engineering Co., Inc. intends to work cooperatively with all qualified firms seeking work on this project. JMECI is an Equal Opportunity Employer. PLEASE DO NOT E-MAIL QUOTES.
Date posted: 02/08/2018
Contractor: J. McLoughlin Engineering Co., Inc. Contact: Joe McLoughlin
Address: 10641 Fulton Ct. Rancho Cucamonga, CA 91730
Phone: 909-944-1037 Fax: 909-944-3112 Email: Berenice@jmeci.com
Services needed: J. McLoughlin Engineering Co., Inc. (JMECI) is requesting quotes from all qualified subcontractors and suppliers especially certified DBE?s (This project has a 5% DVBE Requirement) firms for the following items of work, including but not limited to: Trucking, Street Sweeping, Equipment Rental Lead Compliance Plan, Construction Area Signs, Traffic Control Sytem, Portable Changeable Message Sign, Job Site Management, Prepare Water Pollution Control Program, Asbestos Compliance Plan, Remove Striping, Contractor-Supplied Biologist, Temp High Visibility Fence, Clearing and Grubbing, Clean Expansion Joint, Joint Seal, Bonded Joint Seal, Public Safety Plan, Remove Asphalt Concrete Surfacing, Treat Bridge Deck, Furnish Bridge Deck Treatment Material, Paint Bridge Identification, Remove Pavement Marker, Furnish Single Sheet Aluminum Sign, Roadside Sign, and Striping. Quotations will be broken down into comparable packages as reasonably necessary. JMECI will work with interested subcontractors/vendors/suppliers to identify opportunities to break down items into economically feasible packages. PLEASE DO NOT E-MAIL QUOTES.
Requirements: Subcontractors must possess a current contractor?s license, and provide General Liability, Auto and Worker?s Compensation Insurance meeting the minimum requirements required by JMECI and will be required to sign a Subcontract Agreement and / or Purchase Order if necessary. 100% performance and payment bonds may be required for the full amount of subcontract price. JMECI will provide assistance in Bonding, Line of Credit, Insurance, Equipment, Supplies, and Materials if necessary to all qualified subcontractors. Plans and Specifications are available for viewing by appointment only at our office located at 10641 Fulton Ct., Rancho Cucamonga, CA 91730. J. McLoughlin Engineering Co., Inc. intends to work cooperatively with all qualified firms seeking work on this project. JMECI is an Equal Opportunity Employer. PLEASE DO NOT E-MAIL QUOTES.
Date posted: 02/08/2018
Contractor: J. McLoughlin Engineering Co., Inc. Contact: Joe McLoughlin
Address: 10641 Fulton Ct. Rancho Cucamonga, CA 91730
Phone: 909-944-1037 Fax: 909-944-3112 Email: Berenice@jmeci.com
Services needed: J. McLoughlin Engineering Co., Inc. (JMECI) is requesting quotes from all qualified subcontractors and suppliers especially certified DBE?s firms for the following items of work, including but not limited to: Trucking, Street Sweeping, Equipment Rental Lead Compliance Plan, Construction Area Signs, Traffic Control System, Retroreflective Sheeting for Construction Area Signs, Portable Changeable Message Sign, Job Site Management, Prepare Water Pollution Control Program, Temp Concrete Washout, Lean Concrete Base Rapid Setting, Slurry Seal, Prepaving Inertial Profiler, Replace Asphalt Concrete Surfacing, Prime Coat, Rubberized Hot Mix Asphalt (Gap Graded), Data Core, Tack Coat, Cold Plane Asphalt Concrete Pavement, Individual Precast Slab Replacement, Remove Concrete Pavement, Grind Existing Concrete Pavement, Survey Monument, Remove Pavement Marker, Striping, 12? Rumble Strip and Maintaining Existing Electrical System. Quotations will be broken down into comparable packages as reasonably necessary. JMECI will work with interested subcontractors/vendors/suppliers to identify opportunities to break down items into economically feasible packages. PLEASE DO NOT E-MAIL QUOTES.
Requirements: Subcontractors must possess a current contractor?s license, and provide General Liability, Auto and Worker?s Compensation Insurance meeting the minimum requirements required by JMECI and will be required to sign a Subcontract Agreement and / or Purchase Order if necessary. 100% performance and payment bonds may be required for the full amount of subcontract price. JMECI will provide assistance in Bonding, Line of Credit, Insurance, Equipment, Supplies, and Materials if necessary to all qualified subcontractors. Plans and Specifications are available for viewing by appointment only at our office located at 10641 Fulton Ct., Rancho Cucamonga, CA 91730. J. McLoughlin Engineering Co., Inc. intends to work cooperatively with all qualified firms seeking work on this project. JMECI is an Equal Opportunity Employer. PLEASE DO NOT E-MAIL QUOTES.
Date posted: 02/08/2018
Contractor: Myers and Sons Construction, LP Contact: Mike Lewis
Address: 4600 Northgate Blvd., Suite 100 Sacramento, CA 95834
Phone: 916-283-9950 Fax: 916-614-9520 Email: mlewis@myers-sons.com
Services needed: LEAD COMPLIANCE PLAN, TRAFFIC CONTROL SYSTEM, PCMS, SWPPP, TEMP EROSION CONTROL, STREET SWEEPING, WORK AREA MONITORING, STRUCTURE EX, STRUCTURE BACKFILL, EROSION CONTROL, TEMPORARY SUPPORT, TEMPORARY SUPPORT, TEMPORARY LATERAL BRACING, JACKING SUBSTRUCTURE, FURNISH READY MIX, DRILL AND BOND, PTFE SPHERICAL BEARING, ISOLATION BEARING, REBAR, ASPHALT MEMBRANE WATERPROOFING, STRUCTURAL STEEL, CLEAN & PAINT STRUCTURAL STEEL, SPOT BLAST CLEAN, COMPOSITE PEDESTAL STRENGTHENING, BRIDGE REMOVAL, STEEL COLUMN CASING, MISC METAL, TEMPORARY FENCE, CL FENCE, REMOVE FENCE & ALL OTHER RELATED ITEM.
Requirements: ** All items are open for bid, including items of work normally performed by Myers and Sons Construction. Quotations will be broken down into comparable packages as reasonably necessary. Myers and Sons Construction will work with interested DBE subcontractors to identify opportunities to break down items into economically feasible packages. 100% Payment & Performance Bonds may be required for the full amount of the subcontract price. Subcontractors must possess a valid Contractor?s License, DIR Registration number, current insurance meeting Myers and Sons Construction?s Subcontract Agreement. Quotations must be valid for one hundred twenty (120) days after the specified Contract Award Date by the Owner. Plans and Specifications are available for viewing at our Sacramento office, please contact (916) 283-9950 or mstockton@myers-sons.com. Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies or visit our website at www.myers-sons.com for more information. Myers and Sons Construction will work cooperatively with all qualified firms seeking work in this project. Myers and Sons Construction is signatory to the Laborers, Carpenters, Cement Masons and Operating Engineers. Myers and Sons Construction is an equal opportunity employer.
Date posted: 02/08/2018
Contractor: Apply-A-Line, LLC Contact: Carrie
Address: 19652 Hirsch Court Anderson, CA 96007
Phone: 530-365-4000 Fax: 530-365-4060 Email: carrie@applyaline.com
Services needed: Water Pollution Control Plan & Site Management, Traffic Control Services
Requirements:
Date posted: 02/08/2018
Contractor: R. Burke Corporation Contact: Rob Burke
Address: 865 Capitolio Way San Luis Obispo, CA 93401
Phone: 805-543-8568 Fax: 805-543-2521 Email: rbc@rburkecorporation.com
Services needed: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN (LS), JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM, PREPAVING INERTIAL PROFILER, PREPAVING GRINDING DAY, HOT MIX ASPHALT (TYPE A), DATA CORE, TACK COAT, COLD PLANE ASPHALT CONCRETE PAVEMENT, PAVEMENT MARKER (RETROREFLECTIVE-RECESSED), 6" TWO-COMPONENT PAINT TRAFFIC STRIPE
Requirements:
Date posted: 02/08/2018
Contractor: Granite Construction Company Contact: Barbara Jacob
Address: 5860 El Camino Real STE 200 Carlsbad, CA. 92008
Phone: 760-444-1032 Fax: 760-444-1988 Email: barbara.jacob@gcinc.com
Services needed: Granite Construction Company (Granite) is requesting quotes from all qualified subcontractors and suppliers including certified DVBE and SB firms for the following items of work, including but not limited to: Asphalt Concrete, Asphalt Milling, Asphalt Pulverizing, Asphalt Trucking, Changeable Message Boards, Construction Area Sign Subcontractor, Dowel Baskets & Bars, Pavement Marking, Rapid Set Concrete Material, Ready-Mix Concrete, Tack/Fog/Prime Coat Sub, and Traffic Control.
Requirements: Granite is an Equal Opportunity Employer and will work with any interested subcontractor to identify opportunities to break items into any economically feasible packages. We welcome quotes from qualified Minority Business Enterprise (MBE), Women Business Enterprises (WBE), Small Business Enterprises (SBE), Disadvantaged Businesses and other entities defined as socially and/or economically disadvantaged Granite Construction Company is signatory to Operating Engineers, Laborers, Cement Masons and Carpenters unions. 100% performance and payment bonds may be required for the full amount of subcontract price. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Granite?s requirements and will be required to sign the standard Granite Subcontract Agreement. A copy of the insurance requirements and primary contractual terms are available through the SmartBidNet project website. The full agreement can be obtained by contacting the estimator
Date posted: 02/08/2018
Contractor: USS Cal Builders, Inc. Contact: Estimating
Address: 8051 Main Street Stanton, CA 90680
Phone: 714-828-4882 Fax: 714-503-6805 Email: bidding@usscalbuilders.com
Services needed: The Work includes, but is not limited to: CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, CHANNELIZER (SURFACE MOUNTED), TEMPORARY RAILING (TYPE K), TEMPORARY CRASH CUSHION MODULE, JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY GRAVEL BAG BERM, TEMPORARY IMPERMEABLE MEMBRANE, TEMPORARY CONSTRUCTION ENTRANCE, TEMPORARY CONCRETE WASHOUT, WATER QUALITY SAMPLING AND ANALYSIS DAY, WATER QUALITY MONITORING REPORT, WATER QUALITY ANNUAL REPORT, REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE), WORK AREA MONITORING (BRIDGE), TREATED WOOD WASTE, CLEARING AND GRUBBING (LS), ROADWAY EXCAVATION, ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD), STRUCTURE EXCAVATION (BRIDGE), STRUCTURE EXCAVATION (RETAINING WALL), STRUCTURE EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD), STRUCTURE BACKFILL (BRIDGE), STRUCTURE BACKFILL (RETAINING WALL), SUBGRADE ENHANCEMENT GEOGRID, ROADSIDE CLEARING, PRUNE EXISTING PLANTS, PACKET FERTILIZER, PLANT (GROUP A), PLANT (GROUP B), PLANT (GROUP U), PLANT ESTABLISHMENT WORK, WOOD MULCH, CONTROL AND NEUTRAL CONDUCTORS, 1 1/2" REMOTE CONTROL VALVE, 2" GALVANIZED STEEL PIPE (SUPPLY LINE ON BRIDGE), RISER SPRINKLER ASSEMBLY, 2" GATE VALVE, 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 1 1/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 1 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 2 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), BALL VALVE, 8" CORRUGATED HIGH DENSITY POLYETHYLENE PIPE CONDUIT, CLASS 3 AGGREGATE BASE (CY), LEAN CONCRETE BASE, HOT MIX ASPHALT (TYPE A), RUBBERIZED HOT MIX ASPHALT (GAP GRADED), TACK COAT, FURNISH STEEL PILING (HP 10 X 57), DRIVE STEEL PILE (HP 10 X 57), 16" CAST-IN-DRILLED-HOLE CONCRETE PILING, STRUCTURAL CONCRETE, BRIDGE FOOTING, STRUCTURAL CONCRETE, BRIDGE, STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER), STRUCTURAL CONCRETE, RETAINING WALL, STRUCTURAL CONCRETE, DRAINAGE INLET, MINOR CONCRETE (BACKFILL), DRILL AND BOND DOWEL, CLEAN EXPANSION JOINT, JOINT SEAL (MR 1"), BAR REINFORCING STEEL (BRIDGE), BAR REINFORCING STEEL (RETAINING WALL), FURNISH STRUCTURAL STEEL (BRIDGE), ERECT STRUCTURAL STEEL (BRIDGE), CLEAN AND PAINT STRUCTURAL STEEL, SPOT BLAST CLEAN AND PAINT UNDERCOAT, BRIDGE REMOVAL (PORTION), 18" REINFORCED CONCRETE PIPE, 24" REINFORCED CONCRETE PIPE, 18" SLOTTED CORRUGATED STEEL PIPE (.079" THICK), GRATED LINE DRAIN, REMOVE PIPE (LF), REMOVE INLET, REMOVE CONCRETE SIDEWALK (SQYD), REMOVE CONCRETE (CURB AND GUTTER), MISCELLANEOUS IRON AND STEEL, MISCELLANEOUS METAL (BRIDGE), MISCELLANEOUS METAL (RETAINING WALL), LIGHTING (CITY STREET), CHAIN LINK FENCE (TYPE CL-6), REMOVE FENCE, REMOVE PAVEMENT MARKER, GUARD RAILING DELINEATOR, PAVEMENT MARKER (RETROREFLECTIVE), REMOVE ROADSIDE SIGN, FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED) FOR RETROREFLECTIVE SHEETING(TYPE XI), RETROREFLECTIVE SHEETING (TYPE XI), ROADSIDE SIGN - ONE POST, MIDWEST GUARDRAIL SYSTEM (WOOD POST), VEGETATION CONTROL (MINOR CONCRETE), TRANSITION RAILING (TYPE WB-31), ALTERNATIVE FLARED TERMINAL SYSTEM, CONCRETE BARRIER (TYPE 736A MODIFIED), CONCRETE BARRIER (TYPE 736B), CONCRETE BARRIER (TYPE 736B MOD), CONCRETE BARRIER (TYPE 736SV MOD), CALIFORNIA ST-10 BRIDGE RAIL (MODIFIED), REMOVE GUARDRAIL, SALVAGE METAL BRIDGE RAILING, REMOVE CONCRETE BARRIER, 6" THERMOPLASTIC TRAFFIC STRIPE, 8" THERMOPLASTIC TRAFFIC STRIPE, THERMOPLASTIC PAVEMENT MARKING, PAINT TRAFFIC STRIPE (2-COAT), REMOVE THERMOPLASTIC TRAFFIC STRIPE, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM.
Requirements: USS Cal Builders is seeking qualified DBE subcontractors, suppliers and firms to meet or exceed the 14% goal for the 07-292304 Widen off-ramp, widen bridge, and construct concrete barrier Project. Bid Date and Time:MARCH 15,2018 at2:00 PM Project Owner:CALTRANS Engineer?s Estimate:$2.89 Million Estimator?s Name:JIM LARREA USS Cal Builders requires 100% Performance & Payment Bonds. If requested, and as USS Cal Builders way of assisting subs in obtaining bonds, lines of credit and insurance in the preparation of this project, we can initiate introduction to agents known to us. USS Cal can also assist in obtaining equipment, supplies, materials or related assistance or services in the preparation of this project. USS Cal is relying on the price submitted in a subcontractor's proposal as an all-inclusive price for its trade scope found in the plans, specifications and addenda regardless of any qualifying language in the proposal. USS Cal's listing of a subcontractor is not an acceptance of any or all of that subcontractor's conditions, qualifications, exclusions or exceptions included in the subcontractor's bid proposal. The subcontractor agrees that its bid will remain valid for the same period of time that the prime contractor's bid must remain valid with the owner, as specified in the project's specifications. Each listed subcontractor must execute USS Cal's standard subcontract agreement if USS Cal is awarded the project; the standard subcontract is available for review on USS Cal's website (www.usscalbuilders.com ) and at USS Cal's office. At the discretion of USS Cal, any listed subcontractor that withdraws its bid after USS Cal submits its bid to the owner will be responsible for the difference in price for such scope of work charged by the replacement subcontractor. This is a prevailing wage project. If this project is subject to a Project Labor Agreement or Project Stabilization Agreement, you will be required to honor the terms of such agreement. USS Cal Builders, Inc. is signatory to the Carpenter's Union. Any subcontractor performing carpentry work must be signatory to the Carpenter's Union. An Equal Opportunity Employer. Bidding Department USS Cal Builders Inc.
Date posted: 02/08/2018
Contractor: Hazard Construction Company Contact: Paul Hutchins
Address: 6465 Marindustry Drive San Diego, CA 92121
Phone: 858-587-3600 Fax: 858-453-6034 Email: phutchins@hazardcon.com
Services needed: Hazard Construction is seeking qualified and certified DVBE subcontractors, and material and/or equipment suppliers in the areas of work included in, but not limited to: SWPPP, STRIPING, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL
Requirements: IMPORTANT! We are an Equal Opportunity Employer. We seek and encourage bids from certified SLBE, ELBE, DBE, UDBE, DVBE, SBE, MBE, WBE and OBE businesses. If your scope of work requires materials, please consider and list suppliers on your quote. For all public projects Payment and Performance Bonds are required for 100% of the subcontract amount. Hazard will compensate for up to 3% for the required Bonds. Please contact Hazard Construction Company should you need assistance in obtaining bonding, lines of credit or required insurance, equipment, supplies and or materials. Please visit our website to view Hazard Construction Company?s Insurance Requirements for General Liability, Auto and Workers? Compensation for Subcontractors at http://www.hazardconstruction.com/HCCInsReq.pdf. Please note that the requirements of SB 854 became effective on March 1, 2015. From this point forward All contractors and subcontractors who bid or work on a public works project must register and pay an annual fee to DIR. No Subcontractor may be listed on a public works projects without this registration # and expiration date. The following link leads you to a search website where you can enter the contractor?s legal name or license number https://efiling.dir.ca.gov/PWCR/Search.action
Date posted: 02/08/2018
Contractor: Future DB International Inc. Contact: Future DB International Inc.
Address: 20914 Bake Pkwy, Suite 102 Lake Forest, CA 92630
Phone: 949-390-2110 Fax: 949-732-4355 Email: estimating@futuredbi.com
Services needed: Future DB is requesting bids from qualified subcontractors and suppliers including DVBEs for the following items of work, including but not limited to: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN (EA), JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM, , PAVEMENT MARKER (RETROREFLECTIVE), THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY),REMOVE TRAFFIC STRIPE, REMOVE PAVEMENT MARKER, CONTRAST STRIPE (PAINT TRAFFIC STRIPE)(1-COAT BLACK), 6" TRAFFIC STRIPE TAPE WITH TAPE CONTRAST (BROKEN 36-12) (WARRANTY), 6" TRAFFIC STRIPE TAPE WITH TAPE CONTRAST (BROKEN 17-7) (WARRANTY), 8" TRAFFIC STRIPE TAPE WITH TAPE CONTRAST (BROKEN 12-3) (WARRANTY), 8" TRAFFIC STRIPE TAPE WITH TAPE CONTRAST (BROKEN 36-12) (WARRANTY), MOBILIZATION.
Requirements: We are an equal opportunity employer. Subcontractors must possess a current contractor's license, insurance and Worker's Compensation Insurance coverage meeting the requirements and will be required to sign a subcontract agreement. 100% Payment and Performance Bonds may be required. Future DB will provide assistance in Bonding, Insurance, Equipment, Supplies and Material if necessary. Plans and specifications are available for viewing at: https://futuredbinternationalinc.box.com/s/h7sidend2f6m0u947ormuek2j1lc4aif
Date posted: 02/09/2018
Contractor: Future DB International Inc. Contact: Future DB International Inc.
Address: 20914 Bake Pkwy, Suite 102 Lake Forest, CA 92630
Phone: 949-390-2110 Fax: 949-732-4355 Email: estimating@futuredbi.com
Services needed: Future DB is requesting bids from qualified subcontractors and suppliers including DVBEs for the following items of work, including but not limited to: CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN (EA), JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM,TEMPORARY CONCRETE WASHOUT, SHOULDER BACKING, ASPHALTIC EMULSION (FOG SEAL COAT), RUBBERIZED HOT MIX ASPHALT (GAP GRADED), TACK COAT, COLD PLANE ASPHALT CONCRETE PAVEMENT, DRILL AND BOND (DOWEL BAR), SPALL REPAIR (POLYESTER CONCRETE), INDIVIDUAL SLAB REPLACEMENT (RSC), REPLACE JOINT SEAL (ASPHALT RUBBER), REPLACE JOINT SEAL (SILICONE), , PAVEMENT MARKER (RETROREFLECTIVE), 6" TRAFFIC STRIPE(WARRANTY), 6" TRAFFIC STRIPE WITH CONTRAST (WARRANTY) (BROKEN 36-12), 8" TRAFFIC STRIPE WITH CONTRAST (WARRANTY) (BROKEN 12-3), MOBILIZATION
Requirements: We are an equal opportunity employer. Subcontractors must possess a current contractor's license, insurance and Worker's Compensation Insurance coverage meeting the requirements and will be required to sign a subcontract agreement. 100% Payment and Performance Bonds may be required. Future DB will provide assistance in Bonding, Insurance, Equipment, Supplies and Material if necessary. Plans and specifications are available for viewing at: https://futuredbinternationalinc.box.com/s/aw7yqmg0ortmwswvxzh26y3cm037wyqy
Date posted: 02/09/2018
Contractor: Central Striping Service Inc Contact: Edgar Rodriguez
Address: 3489 Luyung Dr Rancho Cordova, CA 95742
Phone: 916-635-9175 Fax: 916-631-9427 Email: edgarr@centralstriping.biz
Services needed: Central Striping Service, Inc. is seeking certified and qualified subcontractors and/or suppliers for services to all items of work including: lead compliance plan, construction area signs, traffic control, portable CMS, water pollution control program, water blasting, sweeping, trucking/hauling, disposal and material suppliers. Please FAX or email proposals at least 2 hours BEFORE time of bid.
Requirements: Union Signatory and insurance are required. Registration with the Department of Industrial Relations is also required. DVBE status is not required, but highly encouraged.
Date posted: 02/09/2018
Contractor: Central Striping Service Inc Contact: Edgar Rodriguez
Address: 3489 Luyung Dr Rancho Cordova, CA 95742
Phone: 916-635-9175 Fax: 916-631-9427 Email: edgarr@centralstriping.biz
Services needed: Central Striping Service, Inc. is seeking certified and qualified subcontractors and/or suppliers for services to all items of work including: lead compliance plan, construction area signs, traffic control, portable CMS, water pollution control program, water blasting, sweeping, trucking/hauling, disposal and material suppliers. Please FAX or email proposals at least 2 hours BEFORE time of bid.
Requirements: Union Signatory and insurance are required. Registration with the Department of Industrial Relations is also required. DVBE status is not required, but highly encouraged.
Date posted: 02/09/2018
Contractor: Future DB International Inc. Contact: Future DB International Inc.
Address: 20914 Bake Pkwy, Suite 102 Lake Forest, CA 92630
Phone: 949-390-2110 Fax: 949-732-4355 Email: estimating@futuredbi.com
Services needed: Future DB is requesting bids from qualified subcontractors and suppliers including DVBEs for the following items of work, including but not limited to: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN (EA), JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM,PAVEMENT MARKER (RETROREFLECTIVE), THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY), 6? THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), 8? THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), REMOVE TRAFFIC STRIPE, REMOVE PAVEMENT MARKING, CONTRAST STRIPE (PAINT TRAFFIC STRIPE)(1- COAT BLACK), 6? TRAFFIC STRIPE TAPE WITH TAPE CONTRAST (BROKEN 36-12)(WARRANTY), ), 8" TRAFFIC STRIPE TAPE WITH TAPE CONTRAST (BROKEN 12-3) (WARRANTY), MOBILIZATION
Requirements: We are an equal opportunity employer. Subcontractors must possess a current contractor's license, insurance and Worker's Compensation Insurance coverage meeting the requirements and will be required to sign a subcontract agreement. 100% Payment and Performance Bonds may be required. Future DB will provide assistance in Bonding, Insurance, Equipment, Supplies and Material if necessary. Plans and specifications are available for viewing at: https://futuredbinternationalinc.box.com/s/obc1gblcee6884txx8eurjkdn40uhg52
Date posted: 02/09/2018
Contractor: Future DB International Inc. Contact: Future DB International Inc.
Address: 20914 Bake Pkwy, Suite 102 Lake Forest, CA 92630
Phone: 949-390-2110 Fax: 949-732-4355 Email: estimating@futuredbi.com
Services needed: Future DB is requesting bids from qualified subcontractors and suppliers including DVBEs for the following items of work, including but not limited to: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM,REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE), REMOVE YELLOW THERMOPLASTIC PAVEMENT MARKING (HAZARDOUS WASTE), CRACK TREATMENT, SLURRY SEAL, REPLACE ASPHALT CONCRETE SURFACING, REMOVE PAVEMENT MARKER, PAVEMENT MARKER (RETROREFLECTIVE), THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY) (PREFORMED), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 6-1), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 8-4), 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3), REMOVE THERMOPLASTIC TRAFFIC STRIPE, REMOVE THERMOPLASTIC PAVEMENT MARKING, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, MOBILIZATION.
Requirements: We are an equal opportunity employer. Subcontractors must possess a current contractor's license, insurance and Worker's Compensation Insurance coverage meeting the requirements and will be required to sign a subcontract agreement. 100% Payment and Performance Bonds may be required. Future DB will provide assistance in Bonding, Insurance, Equipment, Supplies and Material if necessary. Plans and specifications are available for viewing at: https://futuredbinternationalinc.box.com/s/982qktupf1nqlom2uf75sg146lbuk8y5
Date posted: 02/09/2018
Contractor: Future DB International Inc. Contact: Future DB International Inc.
Address: 20914 Bake Pkwy, Suite 102 Lake Forest, CA 92630
Phone: 949-390-2110 Fax: 949-732-4355 Email: estimating@futuredbi.com
Services needed: Future DB is requesting bids from qualified subcontractors and suppliers including DVBEs for the following items of work, including but not limited to: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN (EA), JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM, PAVEMENT MARKER (RETROREFLECTIVE), THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY) , PAINT TRAFFIC STRIPE (2-COAT), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), REMOVE TRAFFIC STRIPE, REMOVE PAVEMENT MARKING, CONTRAST STRIPE (PAINT TRAFFIC STRIPE)(1-COAT BLACK), 6? TRAFFIC STRIPE TAPE WITH TAPE CONTRAST (BROKEN 36-12)(WARRANTY), 6? TRAFFIC STRIPE TAPE WITH TAPE CONTRAST (BROKEN 17-7)(WARRANTY), 8? TRAFFIC STRIPE TAPE WITH TAPE CONTRAST (BROKEN 12-3)(WARRANTY), MOBILIZATION.
Requirements: We are an equal opportunity employer. Subcontractors must possess a current contractor's license, insurance and Worker's Compensation Insurance coverage meeting the requirements and will be required to sign a subcontract agreement. 100% Payment and Performance Bonds may be required. Future DB will provide assistance in Bonding, Insurance, Equipment, Supplies and Material if necessary. Plans and specifications are available for viewing at: https://futuredbinternationalinc.box.com/s/pdjnj48b7dhdktuph9ueo28a16zo0lvw
Date posted: 02/09/2018
Contractor: USS Cal Builders, Inc. Contact: Estimating
Address: 8051 Main Street Stanton, CA 90680
Phone: 714-828-4882 Fax: 714-503-6805 Email: bidding@usscalbuilders.com
Services needed: USS Cal Builders is seeking qualified DVBE subcontractors, suppliers and firms to meet or exceed the 3 % goal for the 08-1G6204 - Construction In In Riverside County At Various Locations Project. The Work includes, but is not limited to: CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, RETROREFLECTIVE SHEETING (TYPE XI) FOR CONSTRUCTION AREA SIGNS, PORTABLE CHANGEABLE MESSAGE SIGN (LS), JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM, TEMPORARY CONCRETE WASHOUT, LEAN CONCRETE BASE RAPID SETTING, SLURRY SEAL, PREPAVING INERTIAL PROFILER, REPLACE ASPHALT CONCRETE SURFACING, PRIME COAT, RUBBERIZED HOT MIX ASPHALT (GAP GRADED), DATA CORE, TACK COAT, COLD PLANE ASPHALT CONCRETE PAVEMENT, INDIVIDUAL PRECAST SLAB REPLACEMENT, REMOVE CONCRETE PAVEMENT (CY), GRIND EXISTING CONCRETE PAVEMENT, SURVEY MONUMENT (TYPE D), REMOVE PAVEMENT MARKER (LS), PAVEMENT MARKER (RETROREFLECTIVE), THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY), THERMOPLASTIC TRAFFIC STRIPE (SPRAYABLE), REMOVE THERMOPLASTIC PAVEMENT MARKING, 12" RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT), MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, MODIFYING EXISTING ELECTRICAL SYSTEM.
Requirements: USS Cal Builders requires 100% Performance & Payment Bonds. If requested, and as USS Cal Builders way of assisting subs in obtaining bonds, lines of credit and insurance in the preparation of this project, we can initiate introduction to agents known to us. USS Cal can also assist in obtaining equipment, supplies, materials or related assistance or services in the preparation of this project. USS Cal is relying on the price submitted in a subcontractor's proposal as an all-inclusive price for its trade scope found in the plans, specifications and addenda regardless of any qualifying language in the proposal. USS Cal's listing of a subcontractor is not an acceptance of any or all of that subcontractor's conditions, qualifications, exclusions or exceptions included in the subcontractor's bid proposal. The subcontractor agrees that its bid will remain valid for the same period of time that the prime contractor's bid must remain valid with the owner, as specified in the project's specifications. Each listed subcontractor must execute USS Cal's standard subcontract agreement if USS Cal is awarded the project; the standard subcontract is available for review on USS Cal's website (www.usscalbuilders.com ) and at USS Cal's office. At the discretion of USS Cal, any listed subcontractor that withdraws its bid after USS Cal submits its bid to the owner will be responsible for the difference in price for such scope of work charged by the replacement subcontractor. This is a prevailing wage project. If this project is subject to a Project Labor Agreement or Project Stabilization Agreement, you will be required to honor the terms of such agreement. USS Cal Builders, Inc. is signatory to the Carpenter's Union. Any subcontractor performing carpentry work must be signatory to the Carpenter's Union. An Equal Opportunity Employer. Bidding Department USS Cal Builders Inc.
Date posted: 02/09/2018
Contractor: Hazard Construction Company Contact: Paul Hutchins
Address: 6465 Marindustry Drive San Diego, CA 92121
Phone: 858-587-3600 Fax: 858-453-6034 Email: phutchins@hazardcon.com
Services needed: Hazard Construction is seeking qualified and certified DVBE subcontractors and material and/or equipment suppliers in the areas of work included in, but not limited to those listed below. A complete set of plans, specifications and any addendums that may be issued for this project are available for your review at no charge in our plan room. SUBTRADES: Lead Compliance Plan, Construction Area Signs/Roadside Signs, Traffic Control System, PCMS Signs, SWPPP (WPCP), Cold Planning of Asphalt, Slurry Seal, Quality Control Testing/Inspection/Testing for HMA, Traffic Striping and Pavement Marking, Electrical System ? Modify Existing Electrical System.
Requirements: IMPORTANT! We are an Equal Opportunity Employer. We seek and encourage bids from certified SLBE, ELBE, DBE, UDBE, DVBE, SBE, MBE, WBE and OBE businesses. If your scope of work requires materials, please consider and list suppliers on your quote. For all public projects Payment and Performance Bonds are required for 100% of the subcontract amount. Hazard will compensate for up to 3% for the required Bonds. Please contact Hazard Construction Company should you need assistance in obtaining bonding, lines of credit or required insurance, equipment, supplies and or materials. Please visit our website to view Hazard Construction Company?s Insurance Requirements for General Liability, Auto and Workers? Compensation for Subcontractors at http://www.hazardconstruction.com/HCCInsReq.pdf. Please note that the requirements of SB 854 became effective on March 1, 2015. From this point forward All contractors and subcontractors who bid or work on a public works project must register and pay an annual fee to DIR. No Subcontractor may be listed on a public works projects without this registration # and expiration date. The following link leads you to a search website where you can enter the contractor?s legal name or license number https://efiling.dir.ca.gov/PWCR/Search.action
Date posted: 02/09/2018
Contractor: SEMA Construction, Inc. Contact: Eric Stepien
Address: 320 Goddard Way, Ste. 150 Irvine, CA 92618
Phone: 949-470-0500 Fax: 949-788-9200 Email: estimating.ca@semaconstruction.com
Services needed: SEMA construction is looking for DBE subcontractors and suppliers in the areas of: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TEMPORARY PAVEMENT PARKING(PAINT), TEMPORARY TRAFFIC STRIPE (PAINT), CHANNELIZER (SURFACE MOUNTED), TEMPORARY PAVEMENT MARKER, TEMPORARY RAILING (TYPE K), TEMPORARY CRASH CUSHION MODULE, ALTERNATIVE TEMPORARY CRASH CUSHION, JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM, RAIN EVEN ACTION PLAN, STORM WATER ANNUAL REPORT, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY GRAVEL BAG BERM, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, TREATED WOOD WASTE, 60? CAST-IN-DRILLED-HOLE CONCRETE PILE (SIGN FONDATION), FURNISH SIGN STRUCTURE (TRUSS), INSTALL SIGN STRUCTURE (TRUSS), REMOVE BRIDGE MOUNTED SIGN, REMOVE ASPHALT CONCRET SURFACING, REMOVE CONCRETE DECK SURFACE, PREPARE CONCRETE BRIDGE DECK SURFACE, FURNISH POLYESTER CONCRETE OVERLAY, PLACE POLYESTER CONCRETE OVERLAY, BRIDGE REMOVAL (PORTION), LOCATION A, BRIDGE REMOVAL (PORTION), LOCATION B, DETECABLE WARNING SURFACE, MINOR CONCRETE (CURB, SIDEWALK AND CURB RAMP), REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY), PRE/POST CONSTRUCTION SURVEYS, MANHOLE FRAME AND COVER, MISCELLANEOUS METAL (BRIDGE), MODIFYING EXISTING SIGNAL AND LIGHTING SYSTEM (CITY), REMOVE PAVEMENT MARKER, PAVEMENT MARKER (RETROREFLECTIVE), REMOVE ROADSIDE SIGN, FURNISH FORMED PANEL SIGN (OVERHEAD) FOR RETROREFLECTIVE SHEETING(TYPE XI), FURNISH SIGNLE SHEET ALUMINUM SIGN (0.063?-UNFRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063?-UNFRAMED) FOR RETROREFLECTIVE SHEETING(TYPE XI), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080?-UNFRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080?-UNFRAMED) FOR RETROREFLECTIVE SHEETING(TYPE XO), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080?-FRAMED) FOR RETROREFELCTIVE SHEETING (TYPE XI), RETROREFLECTIVE SHEETING (TYPE XI), ROADSIDE SIGN ? ONE POST, ROADSIDE SIGN ? TWO POST, INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD), INSTALL SIGN PANEL ON EXISTING FRAME, INSTALL ROADSIDE SIGN PANEL ON EXISTING POST, CHAIN LINK RAILING TYPE 3, TUBULAR HANDRAILING, CONCRETE BARRIER (TYPE 732SW MODIFIED), SALVAGE METAL BRIDGE RAILING, 6? THERMOPLASTIC TRAFFIC STRIPE, 8? THERMOPLASTIC TRAFFIC STRIPE, THERMOPLASTIC PAVEMENT MARKING, 6? THERMOPLASTIC TRAFFIC STRIPE (BROKEN 6-1), 6? THERMOPLASTIC TRAFFIC STRIPE (BROKEN 17-7), REMOVE THERMOPLASTIC TRAFFIC STRIPE, REMOVE THERMOOPLASTIC PAVEMENT MARKING, TEMPORARY LIGHTING SYSTEM, MODIFYING EXISTING ELECTRICAL SYSTEM, MOBILIZATION,
Requirements: SEMA Construction is an equal opportunity employer; we seek quotes from all minority businesses. Please encourage lower tier DBE suppliers to provide quotes. Per current state regulations, please provide a current DIR number and expiration date with your quote. Please contact us if you need assistance in obtaining bonding, lines of credit, insurance, necessary equipment, supplies, materials, or related services. You can visit our website at www.semaconstruction.com or contact us at the phone number listed above.
Date posted: 02/09/2018
Contractor: Telfer Pavement Technologies, LLC Contact: Rick Arias
Address: 4522 Parker Avenue Suite 350 McClellan, CA. 95652
Phone: 916-383-1756 Fax: 916-383-4084 Email: estimating@telferpavements.com
Services needed: Telfer Pavement Technologies, LLC is requesting quotes from all qualified subcontractors and suppliers including certified UDBE/DBE firms for the following items of work, including but not limited to; Materials supply/delivery, Trucking, Lead Compliance Plan, Construction Area Signs, Traffic Control System, Job Site Management, PCMS, PWPCP, Temporary Pavement Marking (Paint), Temporary Concrete Washout, Treated Wood Waste, Shoulder Backing, Imported Borrow (Ton), Sand Cover (Seal), Precoated Screenings, Hot Mix Asphalt, Data Core, HMA Dike(Type A, C, E, F), Cold Plane Asphalt Concrete, Adjust Frame and Cover to Grade, Guard Railing Delineator, Pavement Marker (Retroreflective) and Removal, Reset road Side Signs, Midwest Guardrail System, Vegetation Control (Minor Concrete), VEGETATION CONTROL (FIBER MAT) VEGETATION CONTROL (FIBER MAT), TRANSITION RAILING (TYPE WB-31, ALTERNATIVE IN-LINE TERMINAL SYSTEM, ALTERNATIVE FLARED TERMINAL SYSTEM, REMOVE GUARDRAIL, Thermoplastic Traffic Stripe and Removal, Thermoplastic Pavement Marking and Removal, Electrical, ETC?Quotations will be broken down to comparable packages as reasonably necessary. Telfer Pavement Technologies, LLC will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. All Supplier and Subcontractor proposals shall be in strict accordance with said project plans, specifications, and any addenda issued.
Requirements: Telfer Pavement Technologies, LLC will assist with performance and payment bonds as they may be required for the full amount of subcontract price. Telfer Pavement Technologies, LLC, will pay for bond premium up to 1.5%. Please call if you need assistance in obtaining bonding, lines of credit, insurance, necessary equipment, materials and/or supplies. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Telfer Pavement Technologies, LLC requirements and will be required to sign the standard Telfer Pavement Technologies, LLC Subcontract Agreement. A copy of the insurance requirements and agreement can be obtained by contacting the Telfer Pavement Technologies, LLC?s office. Endorsements or waivers required are Additional Insured End., Primary Wording End., and a Waiver of Subrogation (GL & WC). Plans and specifications are available for viewing at our office, and or available for viewing on the Caltrans website. Please call if you need any additional assistance. Telfer Pavement Technologies, LLC intends to work cooperatively with all qualified firms seeking to supply materials, services or work on this project Telfer Pavement Technologies, LLC is an equal opportunity employer.
Date posted: 02/09/2018
Contractor: Centerline Striping Co., Inc. Contact: Cory Gage
Address: 9847 Dino Drive Elk Grove, CA 95624
Phone: 916-686-8860 Fax: 916-686-8875 Email: cory@centerlinestriping.com
Services needed: Centerline Striping Co., Inc. is requesting certified and qualified DVBE subcontractors and/or supplier for services to all items of work including: lead compliance plan, construction area signs, traffic control, portable CMS, job site management, water pollution control program, maintaining existing traffic management system,sweeping,and material suppliers for this project. Centerline Striping Co., Inc. is an Equal Opportunity Employer. Assistance is available in obtaining bonds, lines of credit, insurance or other technical information. Plans and Specifications are available from owner. Please contact our office at (916) 686-8860 for more information. Sub-contractors must be registered with the Department of Industrial relations and have a DIR number prior to the bid.
Requirements: Please notify of intent to bid project 2 days in advance and send bid at least 4 hours in advance of bid time to allow for comparison with others.
Date posted: 02/11/2018
Contractor: Chester Bross Construction Company Contact: Estimating
Address: 318 E. Kettleman Lane Lodi, CA. 95240
Phone: 209-920-3595 Fax: 209-263-0123 Email: estimating@chesterbross.com
Services needed: Chester Bross Construction Company (CBC) is requesting quotes from all qualified subcontractors, truckers and suppliers including certified DBE/UDBE/SBE/WBE/DVBE firms for work complete or in part that may be necessary for the performance, construction, and facilitation of the items of work listed on the list of bid items. Requirements: Chester Bross Construction Company (CBC) is an Equal Opportunity Employer. Plans and specifications for this project are available to review upon request, or on the Caltrans Website. CBC will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. CBC will assist in obtaining bonding, lines of credit, insurance, necessary equipment, supplies and materials. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by CBC. CBC will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable contractors license, insurance and workers compensation coverage meeting CBC and Caltrans minimum requirements, and will be required to sign the standard CBC Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.
Requirements:
Date posted: 02/12/2018
Contractor: Pave-Tech Inc. Contact: Daniel Zavalani
Address: 2231 La Mirada Drive Vista, CA 92081
Phone: 760-727-8700 Fax: 760-727-8702 Email: mainoffice@pave-tech.com
Services needed: Pave-Tech Inc. is seeking certified and qualified DVBE subcontractors and/or supplier for services to all items of work including: lead compliance plan, construction area signs, traffic control, portable CMS, job site management, water pollution control program, sweeping, trucking/hauling, disposal and material suppliers for Caltrans Contract 06-0X4704, In Fresno and Kings Counties at various locations. Pave-Tech Inc. is an Equal Opportunity Employer. Pave-Tech has union labor agreements. Assistance is available in obtaining bonds, lines of credit, insurance or other technical information. Plans and Specifications are available from owner. Please contact our office at 760-727-8700 for more information. Certification must be faxed to 760-727-8702. Sub-contractors must be registered with the Department of Industrial relations and have a DIR number prior to the bid.
Requirements:
Date posted: 02/12/2018
Contractor: Pave-Tech Inc. Contact: Daniel Zavalani
Address: 2231 La Mirada Drive Vista, CA 92081
Phone: 760-727-8700 Fax: 760-727-8702 Email: mainoffice@pave-tech.com
Services needed: Pave-Tech Inc. is seeking certified and qualified DVBE subcontractors and/or supplier for services to all items of work including: lead compliance plan, construction area signs, traffic control, portable CMS, job site management, water pollution control program, sweeping, trucking/hauling, disposal and material suppliers for Caltrans Contract 04-0Q5104, In Solano County from Carquinez Bridge to Yolo County line. Pave-Tech Inc. is an Equal Opportunity Employer. Pave-Tech has union labor agreements. Assistance is available in obtaining bonds, lines of credit, insurance or other technical information. Plans and Specifications are available from owner. Please contact our office at 760-727-8700 for more information. Certification must be faxed to 760-727-8702. Sub-contractors must be registered with the Department of Industrial relations and have a DIR number prior to the bid.
Requirements:
Date posted: 02/12/2018
Contractor: Steelhead Constructors, Inc Contact: Kelly Knight
Address: 2940 Innsbruck Drive Redding, CA 96003
Phone: 5302266400 Fax: 5302266401 Email: kelly@steelheadconstructors.com
Services needed: We are requesting quotes from all qualified subcontractors and suppliers, including all certified DVBE/DBE/MBE/WBE/MB subcontractors. We are soliciting quotes for (including but not limited to): Hydromulch, Fiber Rolls, Hydroseed, Compost, Incorporate Materials, and Cable Lashing/Net System. The quotations may be broken down into comparable units as reasonably necessary. Steelhead will work with suppliers and subcontractors to identify opportunities and break down items into economically feasible units.
Requirements: Steelhead Constructors, Inc. (Steelhead) will be bidding the referenced project as a prime contractor. Plans and specifications for this project may be viewed on the Caltrans Website, at your local builder?s exchange and are available for review in our office. If you require additional information regarding the requirements of the contract, please don?t hesitate to call our office. In order that we may give your bid maximum consideration, please supply us with a FAX letter prior to the bid describing the scope of your work. Steelhead is an Equal Employment Opportunity Employer. We encourage and actively solicit proposals from DVBE, DBE, MBE, WBE, DBE and MB subcontractors and suppliers on all our projects. All qualified DVBE, DBE, MBE, WBE, and MB subcontractors must be registered and certified by the California Department of Transportation. Steelhead is signatory to Operating Engineers, Laborers, Carpenters and Cement Masons Unions. All subcontractors must possess a current contractor?s license, insurance, and workers? compensation coverage meeting Steelhead?s requirements and will be required to sign Steelhead?s Subcontract Agreement. Performance and payment bonds up to 100% may be required for the full amount of the subcontract price. Prior to the bid, upon request, you can contact our office if you require assistance in bonding, lines of credit, insurance, obtaining necessary equipment, supplies, materials or services, establishing delivery schedules, etc., which may be required by the Owner. Please contact our office and advise us if you are interested in this project. When submitting any bid on a public works project, please prominently include, on your quote, your California Contractors License Number and Department of Industrial Relations Number. More information regarding California Contractors License and DIR Numbers can be found at http://www.cslb.ca.gov/ and http://www.dir.ca.gov/Public-Works/PublicWorks.html Sincerely, STEELHEAD CONSTRUCTORS, INC.
Date posted: 02/12/2018
Contractor: J. F. Shea Construction, Inc. Contact: Stacy Dutra
Address: 17400 Clear Creek Road Redding, CA 96001
Phone: 530-246-4292 Fax: 530-246-9940 Email: Stacy.Dutra@jfshea.com
Services needed: J. F. Shea Construction, Inc. is requesting quotes from all qualified subcontractors and suppliers including certified DVBE and Small Business firms for all items of work, including but not limited to: 1 LEAD COMPLIANCE PLAN 2 CONSTRUCTION AREA SIGNS 3 TRAFFIC CONTROL SYSTEM 4 TEMPORARY PAVEMENT MARKING (TAPE) 5 PORTABLE CHANGEABLE MESSAGE SIGN (LS) 6 JOB SITE MANAGEMENT 7 PREPARE WATER POLLUTION CONTROL PROGRAM 8 TEMPORARY CONCRETE WASHOUT 9 TREATED WOOD WASTE 10 REMOVE CONCRETE (CY) 11 SHOULDER BACKING 12 REPLACE ASPHALT CONCRETE SURFACING 13 HOT MIX ASPHALT (TYPE A) 14 RUBBERIZED HOT MIX ASPHALT-OPEN GRADED (OPEN GRADED FRICTION COURSE) 15 DATA CORE 16 TACK COAT 17 COLD PLANE ASPHALT CONCRETE PAVEMENT 18 DETECTABLE WARNING SURFACE 19 MINOR CONCRETE (CURB AND GUTTER) 20 MINOR CONCRETE (CURB RAMP) 21 PAVEMENT MARKER (RETROREFLECTIVE) 22 MIDWEST GUARDRAIL SYSTEM 23 ASYMMETRICAL REPLACEMENT ASSEMBLY 24 END ANCHOR ASSEMBLY (TYPE SFT) 25 ALTERNATIVE IN-LINE TERMINAL SYSTEM 26 TERMINAL SYSTEM (TYPE X-TENSION) 27 REMOVE GUARDRAIL 28 SALVAGE GUARDRAIL 29 RECONSTRUCT GUARDRAIL (WOOD POST) 30 ADJUST GUARDRAIL 31 ALTERNATIVE MEDIAN TERMINAL SYSTEM 32 RECONSTRUCT TERMINAL SYSTEM (TYPE SRT) 33 REMOVE DOUBLE GUARDRAIL 34 SALVAGE TERMINAL SYSTEM (TYPE SRT) 35 RECONSTRUCT DOUBLE GUARDRAIL 36 THERMOPLASTIC PAVEMENT MARKING 37 THERMOPLASTIC TRAFFIC STRIPE (SPRAYABLE) 38 REMOVE THERMOPLASTIC PAVEMENT MARKING 39 MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION 40 MODIFYING EXISTING ELECTRICAL SYSTEM
Requirements: J. F. Shea Construction Inc. is a union signatory contractor. Subcontractors must possess a current contractor?s license, insurance coverage and worker?s compensation for the entire length of the contract. All subcontractors will be required to sign our standard Subcontract Agreement. 100% payment and performance bonds may be required. Please call if you need assistance in obtaining insurance, bonding, equipment, materials and/or supplies. Plans and specifications can be viewed at our office located at 17400 Clear Creek Road, Redding, Ca. 96001 or call for any additional needed project information. J. F. Shea Construction Inc. intends to work cooperatively with all qualified firms seeking work on this project. We are an equal opportunity employer and will work with any interested subcontractor to identify opportunities to break items into economically feasible packages. Women and Minority Employees are encouraged to apply. J. F. SHEA CONSTRUCTION, INC. P.O. Box 494519 - Redding, CA 96049 Phone: (530) 246-4292 Fax: (530) 246-9940 An Equal Opportunity Employer
Date posted: 02/12/2018
Contractor: Pave-Tech Inc. Contact: Daniel Zavalani
Address: 2231 La Mirada Drive Vista, CA 92081
Phone: 760-727-8700 Fax: 760-727-8702 Email: mainoffice@pave-tech.com
Services needed: Pave-Tech Inc. is seeking certified and qualified DVBE subcontractors and/or supplier for services to all items of work including: lead compliance plan, construction area signs, traffic control, portable CMS, job site management, water pollution control program, sweeping, trucking/hauling, disposal and material suppliers for Caltrans Contract 04-0Q5004, In Alameda and Contra Costa Counties at various locations from Powell Street to Alameda and Contra Costa county line and from Route 80/4 separation to Cummings Skyway overcrossing. Pave-Tech Inc. is an Equal Opportunity Employer. Pave-Tech has union labor agreements. Assistance is available in obtaining bonds, lines of credit, insurance or other technical information. Plans and Specifications are available from owner. Please contact our office at 760-727-8700 for more information. Certification must be faxed to 760-727-8702. Sub-contractors must be registered with the Department of Industrial relations and have a DIR number prior to the bid.
Requirements:
Date posted: 02/12/2018
Contractor: Calmex Engineering Inc. Contact: Tim Black
Address: 2764 S. Vista Ave Bloomington, ca 92316
Phone: 909-546-1311 Fax: 909-874-9463 Email: tbcalmex@aol.com
Services needed: Calmex Engineering Inc. is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: Cold Plane, Concrete-Rapid Set, Construction Area Signs, Electrical, Erosion Control, Fencing, Guard Rail, Minor Concrete, Striping & Marking, Survey, Traffic Control, WPCP, Materials, Rental Equipment, Trucking.
Requirements: Requirements: Calmex is signatory to Operating Engineers and Laborers unions. 100% performance and payment bonds may be required for the full amount of subcontract price. We intend to seriously negotiate with all qualified DBE subcontractors and suppliers for project participation.
Date posted: 02/12/2018
Contractor: Pave-Tech Inc. Contact: Daniel Zavalani
Address: 2231 La Mirada Drive Vista, CA 92081
Phone: 760-727-8700 Fax: 760-727-8702 Email: mainoffice@pave-tech.com
Services needed: Pave-Tech Inc. is seeking certified and qualified DVBE subcontractors and/or supplier for services to all items of work including: lead compliance plan, construction area signs, traffic control, portable CMS, job site management, water pollution control program, sweeping, trucking/hauling, disposal and material suppliers for Caltrans Contract 08-1J3404, In San Bernardino and Riverside Counties at various locations from 0.4 mile West of Route 10/15 (separation) to Arizona State line. Pave-Tech Inc. is an Equal Opportunity Employer. Pave-Tech has union labor agreements. Assistance is available in obtaining bonds, lines of credit, insurance or other technical information. Plans and Specifications are available from owner. Please contact our office at 760-727-8700 for more information. Certification must be faxed to 760-727-8702. Sub-contractors must be registered with the Department of Industrial relations and have a DIR number prior to the bid.
Requirements:
Date posted: 02/12/2018
Contractor: A. Teichert & Son, Inc. dba Teichert Construction Contact: Nathan Rinaldi
Address: 400 Sunrise Avenue, Suite 300 Roseville
Phone: 5598133100 Fax: 5598133055 Email: NRinaldi@teichert.com
Services needed: Request for qualified bids from Subcontractors, Suppliers & Truckers for the following project: Project: Construction on State Highway in Kings County near Hanford at Hanford-Armona Road Undercrossing ? Contract No. 06-0Q3204 Bid Date: 3/1/18 @ 2:00 PM Docs & Plans Available from Caltrans Estimate: $3,550,000 Duration: 75 Working Days Agency Goals: 12% DBE Project Description: Teichert Construction is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: all materials, labor and equipment for Construction Area Signs, Traffic Control System, Reset, Adjust Roadway Items, Plane Asphalt Concrete, Clearing & Grubbing, Structure Excavation, Imported Borrow, Highway Planting, Soil Amendments, Hydroseeding, Erosion Control, Temporary Erosion Control, Concrete Structure, Minor Concrete Structure, Concrete Surface Finish, Reinforcing Steel, Roadside Sign, Clean & Paint Seal, Alternative Pipe Culvert, Asbestos-Cement Pipe, Corrugated Metal Pipe (CSP), Downdrain, Rock Slope Protection, Concrete Curb & Sidewalk-Misc., Fencing, Survey or Historical Monument, Thermoplastic Traffic Striping & Marking, Painted Traffic Striping & Marking, Pavement Marking, Lighting, Message Signs, Lighting & Sign Illumination, Detector, Traffic Count Station, Painting Structures, Petroleum, Oil, Lubricants Supplier (Bulk Item), Sand & Gravel Supplier (Bulk Item), Asphalt Supplier (Bulk Item), Concrete & Cement Supplier (Bulk Item), Reinforcing Bar Section Supplier, Pipe Supplier, Storm Water Systems Supplier, Guard Railing & Barriers Supplier, Electrical & Signals Supplier, LEAD Compliance, SWPP Planning, Bottom; Transfer; Super 10; End Dump Trucks, Flat Bed Trucking, Water Truck, Asphalt Oil Tankers, Street Sweeping Truck, Truck Rental, Trucker Broker and Trucker. Teichert Construction intends to work cooperatively with all qualified firms seeking work on this project, including but not limited to breaking out contract work items into economically feasible units to increase overall DBE participation. Plans and specifications are available from the municipality listed above and the Teichert?s Roseville Estimating office. For assistance obtaining or regarding the plans and specifications, please contact the listed Estimator. 100% Payment and Performance Bonds for subcontractors are required. Teichert will pay bond premium up to 2%. Insurance Waiver of subrogation also required. However, certified DBE's are encouraged to contact Teichert and request assistance if they are unable to meet Teichert's standard bonding or insurance requirements. DBE's also are encouraged to contact Teichert for assistance in obtaining lines of credit, equipment, supplies, materials or related assistance or services. Subcontractor, Supplier and Trucker quotes must be valid, at minimum, for the award period stated in the contract documents. Please note that this is a prevailing wage project and Teichert Construction is Union signatory. Subcontractors will be subject to the terms and conditions of Teichert's subcontract and safety documents available at www.teichert.com/for-subcontractors.cfm. Submission of a bid to Teichert will confirm that you have reviewed and accepted Teichert's subcontract form. Conditions or exceptions in Subcontractor?s quote are expressly rejected unless accepted in writing prior to bid. Subcontractor scopes and supplier quotes are required 24 hours prior to bid. Additional information and or assistance to DBE's available from: *** All Quotes must have the Department of Industrial Relations # to be ACCEPTED ***
Requirements:
Date posted: 02/12/2018
Contractor: Telfer Pavement Technologies, LLC Contact: Rick Arias
Address: 4522 Parker Avenue Suite 350 McClellan, CA. 95652
Phone: 916-383-1756 Fax: 916-383-4084 Email: estimating@telferpavements.com
Services needed: Telfer Pavement Technologies, LLC is requesting quotes from all qualified subcontractors and suppliers including certified UDBE/DBE firms for the following items of work, including but not limited to; Materials supply/delivery, Trucking, Lead Compliance Plan, Construction Area Signs, Traffic Control System, Job Site Management, PCMS, PWPCP, Crack Treatment, Prepaving Inertial Profiler, Prepaving Grinding Day, Cold Plane Asphalt Concrete Pavement, Pavement Marker (Retroreflective) and Removal, Thermoplastic Traffic Stripe and Removal, Thermoplastic Pavement Marking and Removal, Traffic Management System. ETC?Quotations will be broken down to comparable packages as reasonably necessary. Telfer Pavement Technologies, LLC will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. All Supplier and Subcontractor proposals shall be in strict accordance with said project plans, specifications, and any addenda issued.
Requirements: Telfer Pavement Technologies, LLC will assist with performance and payment bonds as they may be required for the full amount of subcontract price. Telfer Pavement Technologies, LLC, will pay for bond premium up to 1.5%. Please call if you need assistance in obtaining bonding, lines of credit, insurance, necessary equipment, materials and/or supplies. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Telfer Pavement Technologies, LLC requirements and will be required to sign the standard Telfer Pavement Technologies, LLC Subcontract Agreement. A copy of the insurance requirements and agreement can be obtained by contacting the Telfer Pavement Technologies, LLC?s office. Endorsements or waivers required are Additional Insured End., Primary Wording End., and a Waiver of Subrogation (GL & WC). Plans and specifications are available for viewing at our office, and or available for viewing on the Caltrans website. Please call if you need any additional assistance. Telfer Pavement Technologies, LLC intends to work cooperatively with all qualified firms seeking to supply materials, services or work on this project Telfer Pavement Technologies, LLC is an equal opportunity employer.
Date posted: 02/12/2018
Contractor: Proven Management, Inc. Contact: Maria Mares
Address: 225 3rd Street Oakland, CA 94607
Phone: 510-671-0000 Fax: 510-671-1000 Email: bids@provenmanagement.com
Services needed: Proven Management, Inc. (?PMI?) requests proposals/quotes from all qualified subcontractors, suppliers, and truckers including certified DBE firms for the following work including, but not limited to: SWPPP; Traffic Control; Earthwork; Hydroseed; Structural Concrete; Rebar; Misc Metals; Structural Steel; Drilled Dowels; Selective Demo; PTFE Spherical Bearing; Paint; Asphalt Membrane Waterproofing; Jacking Superstructure; Rolled Erosion Control; Spot Blast Clean; Steel Column Casing; Temporary Fence; Chain Link Fencing; Isolation Bearing
Requirements: Bonding, insurance, lines of credit and any technical assistance or information related to the plans & specifications & requirements for the work will be made available to interested DBE certified suppliers, subcontractors, and truckers. Assistance with obtaining necessary equipment, supplies, materials, or related assistance or services for this project will also be offered to interested DBE firms. PMI is signatory to the Operating Engineers, Carpenters, and Laborers Collective Bargaining Agreements. 100% Payment & Performance bonds will be required from a single, Treasury-listed surety company subject to PMI?s approval. PMI will pay bond premium up to 1.5%. Subcontractors awarded on any project will be on PMI?s standard form for subcontract without any modifications. For questions or assistance required on the above, please call Ben Pearce at 510-671-0000 or email at ben@provenmanagement.com. We are an Equal Opportunity Employer
Date posted: 02/12/2018
Contractor: Telfer Pavement Technologies, LLC Contact: Rick Arias
Address: 4522 Parker Avenue Suite 350 McClellan, CA. 95652
Phone: 916-383-1756 Fax: 916-383-4084 Email: estimating@telferpavements.com
Services needed: Telfer Pavement Technologies, LLC is seeking quotes from Qualified DVBE subcontractors and suppliers for work including but not limited to: Materials supply/delivery, Trucking, Lead Compliance Plan, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign, Job Site Management, Prepare Water Pollution Control Program, Remove Yellow Thermoplastic Traffic Stripe (Hazardous Waste), Remove Yellow Thermoplastic Pavement Marking (Hazardous Waste), Crack Treatment, Replace Asphalt Concrete Surfacing, Pavement Marker (Retroreflective) and Removal, Thermoplastic Pavement Marking (Enhanced Wet Night Visibility) and Removal, Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) and Removal, Traffic management System, Etc. Telfer Pavement Technologies, LLC will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. All Supplier and Subcontractor proposals shall be in strict accordance with said project plans, specifications, and any addenda issued.
Requirements: DVBE Subcontractors must possess a current contractor?s license, worker's compensation insurance coverage during the entire length of the contract. Performance and Payment bonds may be required. Plans and specification can be obtained from Cal Trans, your local plan room, or may be viewed through our office. You can contact our office if you need assistance in bonding, lines of credit, insurance, necessary equipment, supplies, materials or services required for this job.
Date posted: 02/12/2018
Contractor: Telfer Pavement Technologies, LLC Contact: Rick Arias
Address: 4522 Parker Avenue Suite 350 McClellan, CA. 95652
Phone: 916-383-1756 Fax: 916-383-4084 Email: estimating@telferpavements.com
Services needed: Telfer Pavement Technologies, LLC is seeking quotes from Qualified DVBE subcontractors and suppliers for work including but not limited to: Materials supply/delivery, Trucking, Lead Compliance Plan, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign, Job Site Management, Prepare Water Pollution Control Program, Shoulder Backing, Sand Cover (Seal), Precoated Screenings, Prepaving Inertial Profiler, Prepaving Grinding Day, Place HMA Dike (Types A,D, E and F) and Removal, Cold Plane Asphalt Concrete Pavement, Pavement Marker (Retroreflective) and Removal, Paint Traffic Stripe, Two Component Paint Traffic Stripe and Removal, Remove Thermoplastic Traffic Stripe, Remove Thermoplastic Traffic Marking, 12? Rumble Strip, Electrical, Etc. Telfer Pavement Technologies, LLC will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. All Supplier and Subcontractor proposals shall be in strict accordance with said project plans, specifications, and any addenda issued.
Requirements: DVBE Subcontractors must possess a current contractor?s license, worker's compensation insurance coverage during the entire length of the contract. Performance and Payment bonds may be required. Plans and specification can be obtained from Cal Trans, your local plan room, or may be viewed through our office. You can contact our office if you need assistance in bonding, lines of credit, insurance, necessary equipment, supplies, materials or services required for this job.
Date posted: 02/12/2018
Contractor: YAKAR Contact: Joseph
Address: 689 East San bernardio Rd Covina, CA 91723
Phone: 909-599-1612 Fax: 800-750-9094 Email: joseph@yakarinc.com
Services needed: YAKAR is requesting quotes from all qualified subcontractors and suppliers including certified DBE/SBE/DVBE firms for the following items of work including but not limited to: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM, REMOVE SIGN STRUCTURE WALKWAY (EA), REMOVE ROADSIDE SIGN (STRAP AND SADDLE BRACKET METHOD), REMOVE SIGN FROM SIGN FRAME, FURNISH FORMED PANEL SIGN (OVERHEAD) FOR RETRO-REFLECTIVE SHEETING (TYPE XI), FURNISH LAMINATED PANEL SIGN (1"-TYPE A) FOR RETRO-REFLECTIVE SHEETING (TYPE XI), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED) FOR RETRO-REFLECTIVE SHEETING (TYPE XI), RETRO-REFLECTIVE SHEETING (TYPE XI), INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD), INSTALL SIGN PANEL ON EXISTING FRAME, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, MODIFYING EXISTING ELECTRICAL SYSTEM, & MOBILIZATION.
Requirements: Plans and Specifications (Contract documents) are available in electronic format at: Caltrans Website http://www.dot.ca.gov/hq/esc/oe/weekly_ads/index.php under Advertised Projects. We can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, line of credit, insurance, equipment, supplies, materials or related assistance in services, please contact our office. Subcontractors must possess a current contractor's license, insurance and worker's compensation coverage meeting Caltrans requirements and may be required to sign YAKAR Subcontract Agreement. Subcontractors must also be registered with the Department of Industrial Relations (DIR) pursuant to the Labor Code section 1725.5. YAKAR is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color. creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. YAKAR intends to work cooperatively with all qualified firms seeking work on this project. Please use the following page to respond, indicating your interest in the project. This will aid in completing the good faith effort required for this project. If you have any questions or need any additional Information, please contact our office at (909)599-1612 or email joseph@yakarinc.com Date posted: 2-12-18
Date posted: 02/12/2018
Contractor: F.D. Thomas, Inc Contact: Mike Kostenko
Address: 217 Bateman Dr Central Point, OR, 97502
Phone: 541-664-3010 Fax: 541-664-1105 Email: bids@fdthomas.com
Services needed: LEAD COMPLIANCE PLAN,CONSTRUCTION AREA SIGNS,TRAFFIC CONTROL SYSTEM,PORTABLE CHANGEABLE MESSAGE SIGN, JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM, WORK AREA MONITORING (BRIDGE), TEMPORARY HIGH-VISIBILITY FENCE,CLEAN EXPANSION JOINT,JOINT SEAL (MR 1"),REPAIR SPALLED SURFACE AREA
Requirements:
Date posted: 02/12/2018
Contractor: YAKAR Contact: Joseph
Address: 689 East San bernardio Rd Covina, CA 91723
Phone: 909-599-1612 Fax: 800-750-9094 Email: joseph@yakarinc.com
Services needed: YAKAR is requesting quotes from all qualified subcontractors and suppliers including certified DBE/SBE/DVBE firms for the following items of work including but not limited to: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN (EA), JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM, ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD), REMOVE ROADSIDE SIGN PANEL, FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN FOR RETRO-REFLECTIVE SHEETING (TYPE XI) (0.063"-UNFRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN FOR RETRO-REFLECTIVE SHEETING (TYPE XI) (0.080"-UNFRAMED), RETRO-REFLECTIVE SHEETING (TYPE XI), INSTALL ROADSIDE SIGN PANEL ON EXISTING POST, & MODIFYING EXISTING ELECTRICAL SYSTEM.
Requirements: Plans and Specifications (Contract documents) are available in electronic format at: Caltrans Website http://www.dot.ca.gov/hq/esc/oe/weekly_ads/index.php under Advertised Projects. We can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, line of credit, insurance, equipment, supplies, materials or related assistance in services, please contact our office. Subcontractors must possess a current contractor's license, insurance and worker's compensation coverage meeting Caltrans requirements and may be required to sign YAKAR Subcontract Agreement. Subcontractors must also be registered with the Department of Industrial Relations (DIR) pursuant to the Labor Code section 1725.5. YAKAR is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color. creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. YAKAR intends to work cooperatively with all qualified firms seeking work on this project. Please use the following page to respond, indicating your interest in the project. This will aid in completing the good faith effort required for this project. If you have any questions or need any additional Information, please contact our office at (909)599-1612 or email joseph@yakarinc.com Date posted: 2-12-18
Date posted: 02/12/2018
Contractor: Apply-A-Line, LLC Contact: Carrie
Address: 19652 Hirsch Court Anderson, CA 96007
Phone: 530-365-4000 Fax: 530-365-4060 Email: carrie@applyaline.com
Services needed: Traffic Control Services Water Pollution Control Plan & Site Management
Requirements:
Date posted: 02/12/2018
Contractor: Chrisp Company Contact: Aaron Patton
Address: 43650 Osgood Road Fremont, Ca. 94539
Phone: 510-656-2840 Fax: 510-656-2397 Email: apatton@chrispco.com
Services needed: Chrisp Company is requesting quotes from all qualified subcontractors and suppliers including certified DVBE Firms for the following items of work, including but not limited to the following: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL, PORTABLE CMS, JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM and MATERIAL SUPPLIES. Subcontractors are required to meet insurance and labor requirements. Subcontractors may be required to provide 100% Payment and Performance Bonds. Please contact us for assistance. FIRMS must include copy of business license with quote. Quotes are required to be in accordance with the plans and specifications and good for the contract duration as specified in the bid documents. We intend to help and work with all qualified firms seeking participation on this project. Feel free to call our office with any questions you may have. DO NOT EMAIL QUOTES. PLEASE FAX TO 510.656.2397. QUOTES MUST BE FAXED AT LEAST 2 HOURS BEFORE BID DUE TIME.
Requirements: To view or obtain plans, specs, and project document, FIRMS should contact the CONTRACTOR to get required project resource. - The CONTRACTOR will provide FIRMS, if requested, with required assistance in bonding, insurance. -Quotes per project bid items must be submitted before the due bid date and time to allow proper evaluation. -Quotes are required to be in accordance with project plans, specs, and good for the entire contract duration. - The project is a prevailing wage public job. The FIRM's quote must consider all terms related to prevailing wages terms. - FIRMS must possess and maintain a current contractor license, insurance, and worker compensation coverage during the project -100% payment bond and performance bond for the full amount of the subcontract price may be required. -FIRMS that submit their quote explicitly acknowledge and agree to all above terms and responsibilities. - We are an equal opportunity employer. We do not discriminate against any qualified contractors, subcontractors, suppliers -The firm must be registered with Department of Industrial Relation and should have a current DIR number.
Date posted: 02/12/2018
Contractor: Golden State Bridge, Inc. Contact: David Riccitiello
Address: 3701 Mallard Drive Benicia, CA 94510
Phone: 925-372-8000 Fax: 925-372-8001 Email: dave@gsbridge.com
Services needed: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TEMP. TRAFFIC STRIPE (TAPE), TEMP. PAVEMENT MARKER, PORTABLE CHANGEABLE MESSAGE SIGN, PREPARE WATER POLLUTION CONTROL PROGRAM, TEMPORARY DRAINAGE INLET PROTECTION, STREET SWEEPING, TEMP. CONCRETE WASHOUT, NOISE MONITORING, CLEAN EXPANSION JOINT, JOINT SEAL, PUBLIC SAFETY PLAN, RAPID SETTING CONCRETE (PATCH), REMOVE CONCRETE DECK SURFACE, REMOVE UNSOUND CONCRETE, PREPARE CONCRETE BRIDGE DECK SURFACE, FURNISH AND PLACE POLYESTER CONCRETE OVERLAY, PAVEMENT MARKER (RETROREFLECTIVE), 6" THERMOPLASTIC TRAFFIC STRIPE.
Requirements: Please call to discuss how Golden State Bridge, Inc. can assist you in your bonding, credit, and/or insurance needs. Also, let us know if you need assistance in obtaining necessary equipment, supplies, or materials for this project. If you are interested in submitting a subcontractor bid for this project, please fax us your quote at 925-372-8001. Should you have any questions regarding this bid, you may contact David Riccitiello at 925-372-8000 or dave@gsbridge.com. Please be advised, Contractors and subcontractors must register with The D.I.R. (Department of Industrial Relations) in order to bid on public works projects. Registration with The D.I.R. costs $300 and covers the fiscal year (July 1 to June 30th). To verify the status of your DIR number, please visit http://www.dir.ca.gov/Public-Works/Contractors.html.
Date posted: 02/12/2018
Contractor: Chrisp Company Contact: Aaron Patton
Address: 43650 Osgood Road Fremont, Ca. 94539
Phone: 510-656-2840 Fax: 510-656-2397 Email: apatton@chrispco.com
Services needed: Chrisp Company is requesting quotes from all qualified subcontractors and suppliers including certified DVBE Firms for the following items of work, including but not limited to the following: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL, PORTABLE CMS, JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM and MATERIAL SUPPLIES. Subcontractors are required to meet insurance and labor requirements. Subcontractors may be required to provide 100% Payment and Performance Bonds. Please contact us for assistance. FIRMS must include copy of business license with quote. Quotes are required to be in accordance with the plans and specifications and good for the contract duration as specified in the bid documents. We intend to help and work with all qualified firms seeking participation on this project. Feel free to call our office with any questions you may have. DO NOT EMAIL QUOTES. PLEASE FAX TO 510.656.2397. QUOTES MUST BE FAXED AT LEAST 2 HOURS BEFORE BID DUE TIME.
Requirements: To view or obtain plans, specs, and project document, FIRMS should contact the CONTRACTOR to get required project resource. - The CONTRACTOR will provide FIRMS, if requested, with required assistance in bonding, insurance. -Quotes per project bid items must be submitted before the due bid date and time to allow proper evaluation. -Quotes are required to be in accordance with project plans, specs, and good for the entire contract duration. - The project is a prevailing wage public job. The FIRM's quote must consider all terms related to prevailing wages terms. - FIRMS must possess and maintain a current contractor license, insurance, and worker compensation coverage during the project -100% payment bond and performance bond for the full amount of the subcontract price may be required. -FIRMS that submit their quote explicitly acknowledge and agree to all above terms and responsibilities. - We are an equal opportunity employer. We do not discriminate against any qualified contractors, subcontractors, suppliers -The firm must be registered with Department of Industrial Relation and should have a current DIR number.
Date posted: 02/12/2018
Contractor: SEMA Construction, Inc. Contact: Eric Stepien
Address: 320 Goddard Way, Ste. 150 Irvine, CA 92618
Phone: 949-470-0500 Fax: 949-788-9200 Email: estimating.ca@semaconstruction.com
Services needed: SEMA construction is looking for DBE subcontractors and suppliers in the areas of: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, CHANNELIZER (SURFACE MOUNTED), TEMPORARY RAILING (TYPE K), TEMPORARY CRASH CUSHION MODULE, JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY GRAVEL BAG BERM, TEMPORARY IMPERMEABLE MEMBRANE, TEMPORARY CONSTRUCTION ENTRANCE, TEMPORARY CONCRETE WASHOUT, WATER QUALITY SAMPLING AND ANALYSIS DAY, WATER QUALITY MONITORING REPORT, WATER QUALITY ANNUAL REPORT, REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE), WORK AREA MONITORING (BRIDGE), TREATED WOOD WASTE, CLEARING AND GRUBBING (LS), ROADWAY EXCAVATION, ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD), STRUCTURE EXCAVATION (BRIDGE), STRUCTURE EXCAVATION (RETAINING WALL), STRUCTRUE EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD), STRUCTURE BACKFILL (BRIDGE), STRUCTURE BACKFILL (RETAINING WALL), SUBGRADE ENHANCEMENT GEOGRID, ROADISDIE CLEARING, PRUNE EXISTING PLANTS, PACKET FERTILIZER, PLANT (GROUP A), PLANT (GROUP B), PLANT (GROUP U), PLANT ESTABLISHMENT WORK, WOOD MULCH, CONTROL AND NEUTRAL CONDUCTORS, 1 ?? REMOTE CONTROL VALVE, 2? GALVANIZED STEEL PIPE (SUPPY LINE ON BRIDGE), RISER SPRINKLER ASSEMBLY, 2? GATE VALVE, ?? PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 1? PLASTIC PIPE (SCHEDULE 40) (SUPLLY LINE), 1 ?? PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 1 ?? PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 2? PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 2 ?? PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), BALL VALVE, 8? CORRUGATED HIGH DENISTY POLETHYLENE PIPE CONDUIT, CLASS 3 AGGREGATE BASE (CY), LEAN CONCRETE BASE, HOT MIX ASPHALT (TYPE A), RUBBERIZED HOT MIX ASPHALT (GAP GRADED), TACK COAT, FURNISH STEEL PILING (HP 10 X 57), DRIVE STEEL PILE (HP 10 X 57), 16? CAST-IN-DRILLED-HOLE CONCRETE PILING, STRUCTURAL CONCRETE, BRIDGE FOOTING, STRUCTURAL CONCRETE, BRIDGE, STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER), STRUCTURAL CONCRETE, RETAINING WALL, STRUCTURAL CONCRETE, DRAINAGE INLET, MINOR CONCRETE (BACKFILL), DRILL AND BOND DOWEL, CLEAN EXPANSION JOINT, JOINT SEAL (MR 1?), BAR REINFORCING STEEL (BRIDGE), BAR REINFORCING STEEL (RETAINING WALL), FURNISH STRUCTURAL STEEL (BRIDGE), ERECT STRUCTRUAL STEEL (BRIDGE), CLEAN AND PAINT STRUCTURAL STEEL, SPOT BLAST CLEAN AND PAINT UNDERCOAT, BRIDGE REMOVAL (PORTION), 18? REINFORCD CONCRETE PIPE, 24? REINFORCED CONCRETE PIPE, 18? SLOTTED CORRUGATED STEEL PIPE (.079? THICK), GRATED LINE DRAIN, REMOVE PIPE (LF), REMOVE INLET, REMOVE CONCRETE SIDEWALK (SQYD), REMOVE CONCRETE (CURB AND GUTTER), MISCELLANEOUS IRON AND STEEL, MISCELLANEOUS METAL (BRIDGE), MISCELLANEOUS METAL (RETAINING WALL), LIGHTING (CITY STREET), CHAIN LINK FENCE (TYPE CL-6), REMOVE FENCE, REMOVE PAVEMENT MARKER, GUARD RAILING DELINEATOR, PAVEMENT MARKER (RETRORELECTIVE), REMOVE ROADSIDE SIGN, RURNISH SINGLE SHEET ALUMINUM SIGN (0.063?-UNFRAMED) FOR RETROREFLECTIVE SHEETING(TYPE XI), RETROREFLECTIVE SHEETING (TYPE XI), ROADSIDE SIGN ? ONE POST, MIDWEST GUARDRAIL SYSTEM (WOOD POST), VEGETATION CONROL (MINOR CONCRETE), TRANSITION RAILING (TYPE WB-31), ALTERNATIVE FLARED TERMINAL SYSTEM, CONCRETE BARRIER (TYPE 736A MODIFIED), CONCRETE BARRIER (TYPE 736B), CONCRETE BARRIER (TYPE 736B MOD), CONCRETE BARRIER (TYPE 736SV MOD), CALIFORNIA ST-10 BRIDGE RAIL (MODIFIED), REMOVE GUARDRAIL, SALVAGE METAL BRIDGE RAILING, REMOVE CONCRETE BARRIER, 6? THERMOPLASTIC TRAFFIC STRIPE, 8? THERMOPLASTIC TRAFFIC STRIPE, THERMOPLASTIC PAVEMENT MARKING, PAINT TRAFFIC STRIPE (2-COAT), REMOVE THERMOPLASTIC TRAFFIC STRIPE, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, MODIFYING EXISTING ELECTRICAL SYSTEM, MOBILIZATION,
Requirements: SEMA Construction is an equal opportunity employer; we seek quotes from all minority businesses. Please encourage lower tier DBE suppliers to provide quotes. Per current state regulations, please provide a current DIR number and expiration date with your quote. Please contact us if you need assistance in obtaining bonding, lines of credit, insurance, necessary equipment, supplies, materials, or related services. You can visit our website at www.semaconstruction.com or contact us at the phone number listed above.
Date posted: 02/13/2018
Contractor: Peterson Chase General Engineering Construction Inc. Contact: Kali Goglanian
Address: 16351 Construction Circle West Irvine, CA 92606
Phone: 949-252-0441 Fax: 949-252-0266 Email: bids@petersonchase.com
Services needed: Peterson-Chase General Engineering Construction, Inc. is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Temporary Traffic Stripe (Tape), Temporary Pavement Marker, Portable Changeable Message Sign (Ls), Job Site Management,Prepare Water Pollution Control Program, Temporary Drainage Inlet Protection, Street Sweeping, Temporary Concrete Washout, Noise Monitoring, Clean Expansion Joint, Joint Seal (Mr 1 1/2"), Public Safety Plan,Rapid Setting Concrete (Patch), Remove Concrete Deck Surface, Remove Unsound Concrete, Prepare Concrete Bridge Deck Surface, Furnish Polyester Concrete Overlay, Place Polyester Concrete Overlay, Pavement Marker (Retroreflective), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 36-12), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility). Please email your quotes to Bids@petersonchase.com
Requirements: Peterson-Chase General Engineering Construction Inc. can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Dick Vogels at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Caltrans? requirements and will be required to sign the standard Peterson-Chase GEC., Inc. Subcontract Agreement. Plans and specifications are available to be viewed in our office located at 16351 Construction Circle West, Irvine, CA 92606, between 8:00 AM and 3:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Peterson-Chase GEC., Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. Peterson Chase General Engineering Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.
Date posted: 02/13/2018
Contractor: Granite Construction Company Contact: Joe Richardson
Address: 38000 Monroe Avenue Indio CA 92203
Phone: 760-775-7500 Fax: 760-775-8229 Email: joe.richardson@gcinc.com
Services needed: Message boards, geosynthetics, liquid AC, SWPPP, traffic control, electrical ? roadway, grind-cold plane, pavement marking, signs-area, trucking-bellies
Requirements: Requirements: For any bid proposal submitted on or after March 1, 2015 and any contract for public work entered into on or after April 1, 2015, the following registration requirements apply: Every Subcontractor is required to be registered to perform public work pursuant to Section 1725.5 of the Public Contract Code (Section 1725.5). No Contractor or Subcontractor shall be qualified to bid on, be listed in a bid proposal pursuant to Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, unless currently registered to perform public work pursuant to Section 1725.5. No bid shall be accepted nor any subcontract entered into without proof of the Subcontractor?s current registration to perform public work pursuant to Section 1725.5. Granite Construction Company (Granite) is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. 100% performance and payment bonds may be required for the full amount of subcontract price. Granite will pay for bond premium up to 1.5%. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Granite?s requirements and will be required to sign the standard Granite Subcontract Agreement. A copy of the insurance requirements and agreement can be obtained by contacting the estimator. Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies. Granite intends to work cooperatively with all qualified firms seeking work on this project.
Date posted: 02/13/2018
Contractor: Peterson Chase General Engineering Construction Inc. Contact: Kali Goglanian
Address: 16351 Construction Circle West Irvine, CA 92606
Phone: 949-252-0441 Fax: 949-252-0266 Email: bids@petersonchase.com
Services needed: Peterson-Chase General Engineering Construction, Inc. is requesting quotes from all qualified subcontractors and suppliers including certified DVBE firms for the following items of work, including but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Temporary Pavement Marking (Paint), Portable Delineator, Traffic Plastic Drum, Flashing Beacon (Portable), Portable Temporary Signal System, Portable Changeable Message Sign (Ls), Temporary Railing (Type K), Temporary Crash Cushion Module, Job Site Management, Prepare Water Pollution Control Program, Temporary Concrete Washout, Structure Excavation (Bridge), Structure Backfill (Bridge), Hot Mix Asphalt (Type A), Tack Coat, Cold Plane Asphalt Concrete Pavement, Grind Existing Bridge Deck, Temporary Support, Aggregate Base (Approach Slab), Structural Concrete, Approach Slab (Type R), Structural Concrete, Bridge (Repair), Paving Notch Extension, Clean Expansion Joint, Joint Seal (Mr 1/2"), Joint Seal (Mr 1"), Galvanic Anode, Welded Wire Reinforcement (Epoxy Coated), Rapid Setting Concrete (Patch), Repair Spalled Surface Area, Remove Unsound Concrete, Prepare Concrete Bridge Deck Surface, Furnish Polyester Concrete Overlay, Place Polyester Concrete Overlay, Treat Bridge Deck, Furnish Bridge Deck Treatment Material, Remove Chip Seal, Bridge Removal (Portion), Remove Pavement Marker, Pavement Marker (Retroreflective), Thermoplastic Pavement Marking, Remove Thermoplastic Traffic Stripe, 12" Rumble Strip (Asphalt Concrete Pavement), 6" Traffic Stripe (Warranty), 6" Traffic Stripe (Warranty) (Broken 36-12), Maintaining Existing Traffic Management System Elements During Construction, Closed Circuit Television System, Modifying Existing Electrical System. Please email your quotes to Bids@petersonchase.com
Requirements: Peterson-Chase General Engineering Construction Inc. can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Dick Vogels at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Caltrans? requirements and will be required to sign the standard Peterson-Chase GEC., Inc. Subcontract Agreement. Plans and specifications are available to be viewed in our office located at 16351 Construction Circle West, Irvine, CA 92606, between 8:00 AM and 3:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Peterson-Chase GEC., Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. Peterson Chase General Engineering Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.
Date posted: 02/13/2018
Contractor: C. A. Rasmussen, Inc. Contact: Danielle Tellez
Address: 28548 Livingston Avenue Valencia, CA 91355
Phone: 661-367-9040 Fax: 661-554-7272 Email: dtellez@carasmussen.com
Services needed: C. A. Rasmussen, Inc. is seeking qualified DBE subcontractors and/or suppliers for the following areas of work including but not limited to: Construction Area Signs; Traffic Control System; Reset, Adjust Roadway Items; Plane Asphalt Concrete; Remove Concrete; Temporary Erosion Control; Aggregate Base; Cement Treated Base; Concrete Base; Asphalt Concrete; Paving Asphalt; Place Asphalt Concrete Dike & Misc.; Reinforcing Steel; Roadside Sign; Concrete Curb & Sidewalk; Saw Cutting; Object Marker; Metal Beam Guard railing; Thermoplastic Traffic Striping & Marking; Painted Traffic Striping & Marking; Pavement Marker; Maintaining Existing Traffic Management During Construction; Signal & Lighting; Detector; Materials Testing Services; Construction Engineering & Inspection Services; Land Surveyor; Lead Compliance; SWPPP Planning; Construction Equipment Rental; Heavy Equipment Rental; Construction Staking (Surveying); Safety Equipment Supplier; Petroleum, Oil & Lubricants Supplier; Sand & Gravel Supplier; Asphalt Supplier; Concrete & Cement Supplier; Reinforcing Bar Section Supplier; Guard Railing & Barriers Supplier; Pavement Markers Supplier; Traffic Stripes, Marking & Traffic Control Materials Supplier; Petroleum & Petroleum Products; Bottom Dump Truck; Transfer Dump Truck; Super 10 Dump Truck; Flat Bed Trucking; Water Truck; End Dump Truck; Asphalt Oil Tankers; Street Sweeping Truck; Truck Rental; Trucker Broker; Trucker All bid items are open for bid, including items of work normally performed by C. A. Rasmussen, Inc. Quotations will be broken down into comparable packages as reasonably necessary. C. A. Rasmussen, Inc. will work with interested DBE subcontractors to identify opportunities to break down items into economically feasible packages.
Requirements: C. A. Rasmussen, Inc. is a General Engineering Contractor requesting quotes from qualified DBE subcontractors and suppliers who perform a commercially useful function. C. A. Rasmussen, Inc. is signatory to the Operating Engineers, Laborers, Cement Masons and Carpenters unions. C. A. Rasmussen, Inc. will provide assistance including but not limited to obtaining bonding, lines of credit, insurance, necessary equipment, supplies and/or materials upon request. C. A. Rasmussen, Inc. will establish flexible timeframes for performance and delivery. Subcontractors will be required to enter into our standard Subcontract Agreement. No modifications to the subcontract are permitted. 100% payment and performance bonds may be required for the amount of Subcontract price. C. A. Rasmussen, Inc. will reimburse Subcontractors for the premium costs of bonds and standard premium rates not to exceed 1.5%. Subcontractors must possess a current Contractor?s License and Insurance. DBE Firms must possess the work category code(s) applicable to their type of work to be performed on this contract at time of bid opening. **Please provide DIR number on quote** Plans and specifications are available for viewing at our office: 28548 Livingston Avenue, Valencia, CA 91355 and on the Caltrans website. Please call if you need any bidding assistance including but not limited to obtaining bonding, insurance, equipment, materials and/or supplies. C. A. Rasmussen, Inc. intends to work in good faith with all qualified DBE firms. Please send your quote at least one day prior to the bid due date so we may review your scope of work. ***Email Quotes to: bids@carasmussen.com Fax Quotes to: 661-554-7272*** If you have questions or need assistance, please contact Danielle Tellez at 661-367-9040.
Date posted: 02/13/2018
Contractor: SEMA Construction, Inc. Contact: Eric Stepien
Address: 320 Goddard Way, Ste. 150 Irvine, CA 92618
Phone: 949-470-0500 Fax: 949-788-9200 Email: estimating.ca@semaconstruction.com
Services needed: SEMA construction is looking for DBE subcontractors and suppliers in the areas of: LEAD COMPLAINCE PLAN, PROGRESS SCHEDULE (CRITICAL PATH METHOD), TIME-RELATED OVERHEAD (WDAY), DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TRAFFIC PLASTIC DRUM, PORTABLE CHANGEABLE MESSAGE SIGN (EA), TEMPORARY RAILING (TYPE K), TEMPORARY ALTERNATIVE CRASH CUSHION SYSTEM, JOB SITE MANAGEMENT, PREPARE STORM WATER ANNUAL REPORT, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY REINFORCED SILT FENCE, TEMPORARY CONSTRUCTION ENTRANCE, TEMPORARY CONCRETE WASHOUT, TREATED WOOD WASTE, REMOVE CONCRETE (CY), CLEARING AND GRUBBING (LS), DUST PALLIATIVE, ROADWAY EXCAVATION, ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD), STRUCTURE EXCAVATION (RETAINING WALL), DITCH EXCAVATION, IMPORTED BORROW (CY), ROADSIDE CLEARING, WEED GERMINATION, PACKET FERTILIZER, SLOW-RELEASE FERTILIZER, PLANT (GROUP F),PLANT (GROUP A), PLANT (GROUP B), PLANT (GROUP U), SOD, MAINTAIN EXISTING PLANTED AREAS, PLANT ESTABLISHMENT WORK, WOOD MULCH, CHECK AND TEST EXISTING IRRIGATION FACILITIES, OPERATE EXISTING IRRIGATION FACILITIES, REMOVE IRRIGATION FACILITY, TEST AND MODIFY CONTROL CONDUCTORS, CONTROL AND NEUTRAL CONDUCTORS, 1? REMOTE CONTROL VALVE, 1 ?? REMOTE CONTROL VALVE, 2? REMOTE CONTROL VALVE, TWO 32 STATION IRRIGATION CONTROLLERS AND ENCLOSURE ?81A? AND ?81B?, TWO 32 STATION IRRIGATION CONTROLLERS AND ENCLOSURE ?32A? AND ?82B?, 16 STATION IRRIGATION CONTROLLER AND ENCLOSURE ?84B?, 32 STATION IRRIGATION CONTROLLER AND ENCLOSURE ?84C?, MODIFY IRRIGATION CONTROLLER AND ENCLOSURE ?84A?, ANTENNA MAST, CERTIFY EXISING BACFLOW PREVENTERS, FLOW SENSOR, TREE WELL SPRINKLER ASSEMBLY, RISER SPRINKLER ASSEMBLY (GEAR DRIVEN), REPLACE VALVE BOX COVER, 2? GATE VALVE, 3? GATE VALVE, 1? PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 1 ?? PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 1 ?? PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 2? PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 2 ?? PLASTIC PIPE (CLASS 315) (SUPPLY LINE), 3? PLASTIC PIPE (CLASS 315) (SUPPLY LINE), 4? PLASTIC PIPE (CLASS 315) (SUPPLY LINE), 8? PVC PIPE CONDUIT, BONDED FIBER MATRIX (SQFT), ROLLER EROSION CONTROL PRODUCT (NETTING), COMPOST (EROSION CONTROL), CLASS 2 AGGREGATE BASE (CY), HOT MIX ASPHALT (TYPE A) PLACE HOT MIX ASPHALT DIKE (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE C), PLACE HOT MIX ASPHALT DIKE (TYPE D), PLASE HOT MIX ASPHALT (MISCELLANEOUS AREA), REMOVE ASPHALT CONCRETE DIKE, 16? CAST-IN-DRILLED-HOLE CONCRETE PILING (SOUND WALL), STRUCTURAL CONCRETE, RETAINING WALL, STRUCTURAL CONCRETE, SOUND WALL, STRUCTURAL CONCRETE (JUNCTION STRUCTURE), STRUCTURAL CONCRETE, DRAINAGE INLET, ARCHITECTRUAL TREATMENT (ASHLAR TEXTURE), BAR REINFORCING STEEL (RETAINING WALL), SOUND WALL (MASONRY BLOCK), ACCESS GATE (SOUND WALL), SOUND WALL (MASONRY BLOCK MODIFIED), ACCESS GATE ? WOOD (SOUND WALL), ACCESS GATE ? WOOD (SOUND WALL READY FITTED SYSTEM), SOUND WALL TRANSPARENT (READY FITTED SYSTEM), SOUND WALL TRANSPARENT (MASONRY SYSTEM), REMOVE SOUND WALL (SQFT), 18? ALTERNATIVE PIPE CULVERT, 24? REINFORCED CONCRETE PIPE, 36? REINFORCED CONCRETE PIPE (CLASS V), 18? POLYMERIC SHEET COATED CORRUGATED STEEL PIPE (0.109? THICK), 24? CONCRETE FLARED END SECTION, 36? REINFORCED CONCRETE PIPE RISER, ROCK SLOPE PROTECTION (FACING, METHOD B) (CY), CONCRETE (DITCH LINING), CONCRETE (CONCRETE APRON), ROCK SLOPE PROTECTION FABRIC (CLASS 8), BOOSTER PUMP (EA), MISCELLANEOUS IRON AND STEEL, RESET MAILBOX, TEMPORARY FENCE (TYPE CL-6, SLATTED), CHAIN LINK FENCE (TYPE CL-6), 6? CHAIN LINK GATE (TYPE CL-6), REMOVE FENCE, REMOVE CHAIN LINK FENCE, RECONSTRUCT FENCE, GUARD RAILING DELINEATOR, MIDWEST GUARDRAIL SYSTEM, CABLE RAILING, END ANCHOR ASSEMBLY (TYPE SFT), SOFTSTOP TERMINAL SYSTEMS, REMOVE GUARDRAIL, SUBSURFACE LOCATORS, MODIFYING EXISTING ELECTRICAL SYSTEM, MOBILIZATION,
Requirements: SEMA Construction is an equal opportunity employer; we seek quotes from all minority businesses. Please encourage lower tier DBE suppliers to provide quotes. Per current state regulations, please provide a current DIR number and expiration date with your quote. Please contact us if you need assistance in obtaining bonding, lines of credit, insurance, necessary equipment, supplies, materials, or related services. You can visit our website at www.semaconstruction.com or contact us at the phone number listed above.
Date posted: 02/13/2018
Contractor: Granite Construction Contact: Terry Richards
Address: 1324 S. State Street, Ukiah, CA 95482
Phone: 707-467-4100 Fax: 707-467-4143 Email: terry.richards@gcinc.com
Services needed: Granite Construction Company (Granite) is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: C1200 CONSTRUCTION AREA SIGNS; C1201 TRAFFIC CONTROL SYSTEM; C1211 TRAFFIC FLAGGERS; C1522 RESET; C1531 PLANE ASPHALT CONCRETE; C2020 SOIL AMENDMENTS; C2021 HYDROSEEDING; C2030 EROSION CONTROL; C2066 TEMPORARY EROSION CONTROL; C3701 SEAL COAT; C3901 ASPHALT CONCRETE; C3940 PLACE ASPHALT CONCRETE DIKE & MISC; C5201 REINFORCING STEEL; C5620 ROADSIDE SIGN; C6819 FILTER FABRIC; C6820 PERMEABLE MATERIAL; C7301 CONCRETE CURB & SIDEWALK - MISC; C8000 FENCING CONTRACTOR; C8001 TEMPORARY FENCING; C8320 METAL BEAM GUARD RAILING; C8331 CONCRETE BARRIER; C8405 THERMOPLASTIC TRAFFIC STRIPING & MARKING; C8406 PAINTED TRAFFIC STRIPING & MARKING; C8407 REMOVE PAVEMENT MARKING & TRAFFIC STRIPES; C8501 PAVEMENT MARKING; C8602 SIGNAL & LIGHTING; C8605 MESSAGE SIGNS; C8851 LEAD COMPLIANCE; C8852 SWPPP PLANNING; C9602 BOTTOM DUMP TRUCKING; C9603 TRANSFER DUMP TRUCK. Additional Services needed: TEMPORARY PEDESTRIAN ACCESS ROUTE; ALTERNATE TEMPORARY CRASH CUSHION; RAIN EVENT ACTION PLAN; STORM WATER SAMPLING AND ANALYSIS; STORM WATER ANNUAL REPORT; SOIL NAIL; SCULPTED SHOTCRETE AND STRUCTURAL SHOTCRETE; PREPARE AND STAIN SHOTCRETE; PEDESTRIAN BARRICADE; VEGETATION CONTROL (MINOR CONCRETE); ALTERNATE FLARED TERMINAL SYSTEM; TYPE SOFT STOP TERMINAL SYSTEM; GREEN PAVEMENT MARKING. Quotations will be broken down into comparable packages as reasonably necessary. Granite will work with interested subcontractors to identify opportunities to break down items into economically feasible packages.
Requirements: For any bid proposal submitted on or after March 1, 2015 and any contract for public work entered into on or after April 1, 2015, the following registration requirements apply: Every Subcontractor is required to be registered to perform public work pursuant to Section 1725.5 of the Public Contract Code (?Section 1725.5?). No Contractor or Subcontractor shall be qualified to bid on, be listed in a bid proposal pursuant to Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, unless currently registered to perform public work pursuant to Section 1725.5. No bid shall be accepted nor any subcontract entered into without proof of the Subcontractor?s current registration to perform public work pursuant to Section 1725.5. Granite Construction Company (Granite) is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. 100% performance and payment bonds may be required for the full amount of subcontract price. Granite will pay for bond premium up to 1.5%. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Granite?s requirements and will be required to sign the standard Granite Subcontract Agreement. A copy of the insurance requirements and agreement can be obtained by contacting the estimator. Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies. Granite intends to work cooperatively with all qualified firms seeking work on this project. Plans and Specifications are available for viewing at our office located at 1324 S. State Street, Ukiah, CA. Portions of work can be made available upon request prior to bid date. Please call if any assistance is needed. Granite Construction Is An Equal Opportunity Employer
Date posted: 02/13/2018
Contractor: Team Ghilotti, Inc. Contact: Abel Canlas
Address: 2531 Petaluma Blvd. South Petaluma, CA
Phone: 707-763-8700 Fax: 707-763-8711 Email: abelc@teamghilotti.com
Services needed: We Are Seeking Quotes for Qualified DBE?s SUBCONTRACTORS & SUPPLIERS, SERVICE PROVIDERS & TRUCKING on the following bid items: Lead Comp. Plan, Const. Area Signs, Traffic Control System, Barricade, PCMS, K-Rail, Alt Temp Crash Cushion, Jobsite Management, SWPPP, Rain Event, Sampling & Reporting, Clear & Grubb, Geo-Reinforced Embankment, Shoulder Backing, Import Borrow, Gravel Mulch, Boulders, Temp & Perm Erosion Control, Compost, CL2 AB, HMA, AC Dike, Tack Coat, Cold Plane, Concrete Pavement, Color, Minor Concrete, Prep & Stain, Oxidizing Stain, Anti-Graffiti Coating, Fence (Type WM/Metal Post), Joint Seal, Precast DI & Pipes, Re-bars, Alt Pipe Culvert, Perforated Pipe, Geo-composite Drain, Corr. Steel Pipe, Entrance Taper, Flared End, Delineator, Markers, Markings, Signs & Striping, Midwest Guardrail, End &Term Assy., Lighting System, Traffic Monitoring Station System, Street Sweeping, Tack Oil, Trucking and All Other related Trades and Items of Work Including Partial Items that are required by the project plans & specifications. The Plans and Special Provisions are available at the State of California, Department of Transportation website: http://www.dot.ca.gov/hq/esc/oe/weekly_ads/project.php or by contacting our estimating department. Team Ghilotti, Inc. is an Equal Opportunity Employer.
Requirements: Performance and payment bonds may be required. Please call for assistance with bonding and insurance or obtaining necessary equipment, supplies or material for this project. TEAM GHILOTTI, INC. 2531 Petaluma Blvd. S., Petaluma, CA 94952 Phone (707) 763-8700 Fax: (707) 762-1430
Date posted: 02/13/2018
Contractor: Gordon N. Ball, Inc Contact: Serina Sirna
Address: 333 Camille Ave. Alamo, CA 94507
Phone: 925-838-5675 Fax: 925-838-0814 Email: estimating@ballconco.com
Services needed: Work types requested, but are not limited to, the following: Clearing and Grubbing, Cold Plan AC Pavement, Construction Area Signs, Construction Materials, Electrical, Erosion Control, HMA Type A, Pipe Supply, Portable Changeable Message Sign, Prepare SWPPP, Roadway Excavation, Rock Slope Protection, Street Sweeping, Structural Concrete, Temporary Erosion Control, Traffic Control System, and Trucking
Requirements: Plans and Specifications are available for review at our office, or can be downloaded online at the following website: http://www.dot.ca.gov/des/oe/weekly-ads/specs-ntb.php?c=04-2J4604 Call Serina Sirna for assistance in obtaining bonds, line of credit, insurance and scheduling accommodations. Attn: Serina Sirna 333 Camille Ave., Alamo, CA 94507 Phone: (925) 838-5675 Fax: (925) 838-0814 estimating@ballconco.com An Equal Opportunity Employer
Date posted: 02/13/2018
Contractor: Granite Construction Company Contact: Mark Curfman
Address: 2716 Granite Court Fresno, CA 93706
Phone: 559-441-5700 Fax: 559-441-5791 Email: mark.curfman@gcinc.com
Services needed: Services needed: Granite Construction Company (Granite) is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: Provide Lead Compliance Plan, Construction Area Signs, Traffic Control, Type III Barricade, Channelizers, Temporary Striping & Marking, Temporary K-Rail, Temporary Crash Cushion, Prepare SWPP, Provide Temporary SWPPP BMP's, Street Sweeping, Clearing & Grubbing, Structural Excavation/Backfill, Provide Import Borrow, Concrete Rock Blanket, Wood Mulch, Erosion Control, Provide Aggregates, Provide Tack, Provide HMA Binder, Lean Concrete Base/JPCP, Concrete Retaining Wall, Storm Drain System, Rebar, Precast Concrete Pavers, Rock Slope Protection, Minor Concrete (Curbing, Flatwork, Textured), Misc. Iron & Steel, Anti-Graffiti Coating, Fencing, Marking & Striping, Miscellaneous Roadside Signs, Cable Railing, HMA Paving, and Electrical System. Scope of work: Construct roundabout Quotations will be broken down into comparable packages as reasonably necessary. Granite will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Portions of work can be made available upon request prior to bid date. Please call if any assistance is needed.
Requirements: Plans and specifications are available at your local Builders Exchange and/ or on the CDOT website: http://www.dot.ca.gov/hq/esc/oe/weekly_ads/index.php. They are also available for viewing at our office located at 2716 Granite Court, Fresno CA. Requirements: Granite is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. This will be a prevailing wage job. 100% performance and payment bonds may be required for the full amount of subcontract price. Granite will pay for bond premium up to 1.5%. Subcontractors must possess a current contractor?s license, DIR registration number, insurance and worker?s compensation coverage meeting Granite?s requirements and will be required to sign the standard Granite Subcontract Agreement. A copy of the insurance requirements and agreement can be obtained by contacting the estimator. Granite intends to work cooperatively with all qualified firms seeking work on this project. If you need services and or assistance in obtaining bonds, lines of credit, insurance, necessary equipment, materials and/or supplies, for this project call the Estimator, or contact your local Small Business Development Center Network (http://californiasbdc.org), Minority Business Development Center (www.mbda.gov) or contact the California Southwest Transportation Resource Center (https://www.transportation.gov/osdbu/sw-region-sbtrc). Please call or email if any assistance is needed. Granite Construction Company Is An Equal Opportunity Business Employer
Date posted: 02/13/2018
Contractor: Granite Construction Contact: Terry Richards
Address: 1324 S. State Street, Ukiah, CA 95482
Phone: 707-467-4100 Fax: 707-467-4143 Email: terry.richards@gcinc.com
Services needed: Granite Construction Company (Granite) is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: C1200 CONSTRUCTION AREA SIGNS; C1201 TRAFFIC CONTROL SYSTEM; C1211 TRAFFIC FLAGGERS; C1522 RESET; C1531 PLANE ASPHALT CONCRETE; C2000 HIGHWAY PLANTING; C2030 EROSION CONTROL; C2066 TEMPORARY EROSION CONTROL; C3701 SEAL COAT; C3940 PLACE ASPHALT CONCRETE DIKE & MISC; C4040 CLEAN & SEAL PAVEMENT JOINTS - ROUT & SEAL CRACKS; C5105 MINOR CONCRETE STRUCTURE; C5201 REINFORCING STEEL; C5601 SIGN STRUCTURE; C5620 ROADSIDE SIGN; C7301 CONCRETE CURB & SIDEWALK - MISC; C8000 FENCING; C8001 TEMPORARY FENCING; C8320 METAL BEAM GUARD RAILING; C8405 THERMOPLASTIC TRAFFIC STRIPING & MARKING; C8406 PAINTED TRAFFIC STRIPING & MARKING; C8407 REMOVE PAVEMENT MARKING & TRAFFIC STRIPES; C8501 PAVEMENT MARKING; C8603 SIGNAL; C8604 LIGHTING; C8605 MESSAGE SIGNS; C8851 LEAD COMPLIANCE; C8852 SWPPP PLANNING; C9602 BOTTOM DUMP TRUCKING; C9603 TRANSFER DUMP TRUCK; C9604 SUPER 10 DUMP TRUCK; C9609 STREET SWEEPING TRUCK. Additional services needed: PROGRESS SCHEDULE (CRITICAL PATH METHOD); ALTERNATIVE TEMPORARY CRASH CUSHION SYSTEM; RAIN EVENT ACTION PLAN; STORM WATER SAMPLING AND ANALYSIS; STORM WATER ANNUAL REPORT; JOINTED PLAIN CONCRETE PAVEMENT AND JOINTED PLAIN CONCRETE PAVEMENT (COLORIZED); SLOPE PAVING (CONCRETE); DETECTABLE WARNING SURFACE; PREPARE AND STAIN CONCRETE; OXIDIZING STAIN; ANTI-GRAFFITI COATING; VEGETATION CONTROL (MINOR CONCRETE); TRANSITION RAILING (TYPE WB-31); ALTERNATIVE IN-LINE TERMINAL SYSTEM; ALTERNATIVE FLARED TERMINAL SYSTEM. Quotations will be broken down into comparable packages as reasonably necessary. Granite will work with interested subcontractors to identify opportunities to break down items into economically feasible packages.
Requirements: Granite Construction Company (Granite) is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. 100% performance and payment bonds may be required for the full amount of subcontract price. Granite will pay for bond premium up to 1.5%. The US Small Business Administration may also assist you in obtaining bonding - please see the following site for information: http://www.sba.gov/content/contractors# Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Granite?s requirements and will be required to sign the standard Granite Subcontract Agreement. A copy of the insurance requirements and agreement can be obtained by contacting the estimator. Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies. Granite intends to work cooperatively with all qualified firms seeking work on this project. Portions of work can be made available upon request prior to bid date. Please call if any assistance is needed. Granite Construction Company Is An Equal Opportunity Employer.
Date posted: 02/13/2018
Contractor: Marina Landscape, Inc. Contact: Farzad Menhaji
Address: 3707 W. Garden Grove Blvd Orange, CA 92868
Phone: 714-620-7243 Fax: 714-935-0797 Email: fmenhaji@marinaco.com
Services needed: Marina Landscape Inc.is a construction firm bidding on the above listed project and seeking sub bids/quotes from contractors, vendors, manufactures and suppliers, particularly those who are certified DBEs for following items of work that have been broken down and can be broken down further into economical feasible elements to assist the participation of CONTRACTORS/VENDORS: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN, JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY CONSTRUCTION ENTRANCE, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, ROADWAY EXCAVATION, ROADSIDE CLEARING, SOIL AMENDMENT, ORGANIC FERTILIZER, PLANT MATERIALS, PLANT ESTABLISHMENT WORK (MINIMUM BID), GRAVEL MULCH, WOOD MULCH, EDGING, IRRIGATION MATERIALS, HYDROMULCH, STRAW, HYDROSEED, CLASS 2 AGGREGATE BASE (CY), GEOCOMPOSITE DRAIN, MINOR CONCRETE (MISCELLANEOUS CONSTRUCTION), MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, ELECTRIC SERVICE FOR IRRIGATION, STRUCTURE EXCAVATION (RETAINING WALL), STRUCTURE BACKFILL (RETAINING WALL), STRUCTURAL CONCRETE, RETAINING WALL, ARCHITECTURAL TREATMENT, BAR REINFORCING STEEL (RETAINING WALL), ASPHALT MEMBRANE WATERPROOFING, MISCELLANEOUS METAL (RETAINING WALL).
Requirements: Marina Landscape is an equal opportunity employer and encourages the participation of all DBE subcontractors/vendors. Items listed above may be broken into feasible items to allow subcontractors/vendor a viable bid item. Subcontractors must possess a current active contractor's license, DIR number, general liability insurance, and workers compensation insurance. Payment and performance bond may be required for the full contract amount. Marina Landscape is signatory with the operating engineers and laborers, and pipefitters unions. Please contact us if you need assistance in obtaining bonding, insurance, necessary equipment, supplies, and/or materials.Plans and specifications may be viewed at our office at 3707 W. Garden Grove Blvd, Orange, CA 92868
Date posted: 02/14/2018
Contractor: Papich Construction Co., Inc. Contact: Sydney Johnson
Address: 800 Farroll Rd., Grover Beach, CA 93433
Phone: 805-473-3016 Fax: 805-473-2217 Email: sjohnson@papichco.com
Services needed: We are seeking DBE/ DVBE participation from Subcontractors, Suppliers, and Consultants for the following items of work, but not limited to: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, JOB SITE MANAGEMENT, WPCP, PREPAVING INERTIAL PROFILER, HMA, TRUCKING, DATA CORES, PAVEMENT MARKERS (RETROREFLECTIVE ? RECESSED), 6? TWO-COMPONENT PAINT TRAFFIC STRIPE
Requirements: Papich Construction Co Inc (PCI) intends to bid as a Prime for this Caltrans contract. We intend to conduct ourselves in good faith and work cooperatively with all qualified firms seeking work on this project. We are willing to break out items of work into economically feasible packages to facilitate DBE participation from certified firms. 100% performance and payment bonds will be required for the full amount of the subcontract price. We will reimburse for bond premium up to 2%. By submitting a price quote to PCI, subcontractors and suppliers affirm they have carefully examined ALL the bidding / contract documents / addenda and that from his/her own investigation, they have satisfied themselves as to the scope of the work. Please contact us for any assistance you may require for this solicitation, including obtaining bonding, insurance, equipment, materials and/or supplies. We are signatory to Operating Engineers and Laborers Unions. Any non-signatory subcontractors will be required to sign a one time agreement for trades covered under our union agreements. All project documents are available at no cost for download on the Caltrans Office Engineer Website. Project documents may also be viewed in our office by appointment. Subcontractors must posses a current contractor?s license, insurance and worker?s compensation coverage meeting project requirements and will be required to sign a standard Subcontract Agreement. If you are interested in providing pricing or if you have any questions about this project, or need any assistance from PCI to facilitate your firm?s participation on this project, please do not hesitate to contact us.
Date posted: 02/14/2018
Contractor: Chrisp Company Contact: Aaron Patton
Address: 43650 Osgood Road Fremont, Ca. 94539
Phone: 510-656-2840 Fax: 510-656-2397 Email: apatton@chrispco.com
Services needed: Chrisp Company is requesting quotes from all qualified subcontractors and suppliers including certified DVBE Firms for the following items of work, including but not limited to the following: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL, PORTABLE CMS, JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM and MATERIAL SUPPLIES. Subcontractors are required to meet insurance and labor requirements. Subcontractors may be required to provide 100% Payment and Performance Bonds. Please contact us for assistance. FIRMS must include copy of business license with quote. Quotes are required to be in accordance with the plans and specifications and good for the contract duration as specified in the bid documents. We intend to help and work with all qualified firms seeking participation on this project. Feel free to call our office with any questions you may have. DO NOT EMAIL QUOTES. PLEASE FAX TO 510.656.2397. QUOTES MUST BE FAXED AT LEAST 2 HOURS BEFORE BID DUE TIME.
Requirements: To view or obtain plans, specs, and project document, FIRMS should contact the CONTRACTOR to get required project resource. - The CONTRACTOR will provide FIRMS, if requested, with required assistance in bonding, insurance. -Quotes per project bid items must be submitted before the due bid date and time to allow proper evaluation. -Quotes are required to be in accordance with project plans, specs, and good for the entire contract duration. - The project is a prevailing wage public job. The FIRM's quote must consider all terms related to prevailing wages terms. - FIRMS must possess and maintain a current contractor license, insurance, and worker compensation coverage during the project -100% payment bond and performance bond for the full amount of the subcontract price may be required. -FIRMS that submit their quote explicitly acknowledge and agree to all above terms and responsibilities. - We are an equal opportunity employer. We do not discriminate against any qualified contractors, subcontractors, suppliers -The firm must be registered with Department of Industrial Relation and should have a current DIR number.
Date posted: 02/14/2018
Contractor: California Engineering Contractors, Inc Contact: Scott Soldis-Estimator
Address: 20 Happy Valley Road Pleasanton, CA 94566
Phone: 925-461-1500 Fax: 925-461-0510 Email: rorzech@cecmain.com
Services needed: Requesting quotes for but not limited to: WPCP, Fiber Roll, Temporary Concrete Washout, Bonded Fiber Matrix, Rolled Erosion Control Product, PTFE Spherical Bearing, Isolation Bearing (Lead Core Rubber), Bar Reinforcing Steel, Asphalt Membrane Waterproofing, Composite Pedestal Strengthening, Miscellaneous Metal, Fencing, Trucking, Materials & Supplies CEC is willing to breakout any portion of work to encourage DBE participation.
Requirements: 100 % Payment & Performance Bonds will be required from a single, treasury-listed surety subject to our approval. CEC will pay bond premiums up to 1.5%. Subcontractors awarded on any project will be on CEC?s standard form for subcontract without any modifications. Please call for assistance in bonding, insurance, lines of credit, technical info, equipment and supplies or if any other assistance is needed.Please include your CSLB, DIR and DBE Certification Numbers On All Quotes Submitted
Date posted: 02/14/2018
Contractor: California Engineering Contractors, Inc Contact: Scott Soldis-Estimator
Address: 20 Happy Valley Road Pleasanton, CA 94566
Phone: 925-461-1500 Fax: 925-461-0510 Email: rorzech@cecmain.com
Services needed:
Requirements:
Date posted: 02/14/2018
Contractor: Certified Coatings Company Contact: Ashley Toms
Address: 2320 Cordelia Road Fairfield, CA 94534-1600
Phone: 707-639-4414 Fax: 707-432-0574 Email: toms@muehlhan.com
Services needed: CERTIFIED COATINGS COMPANY IS SEEKING CERTIFIED AND QUALIFIED DVBE SUBS AND/OR SUPPLIERS TO PROVIDE THE FOLLOWING BUT NOT LIMITED TO: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS,TRAFFIC CONTROL SYSTEM,PORTABLE CHANGEABLE MESSAGE SIGN, JOB SITE MANAGEMENT,PREPARE WATER POLLUTION CONTROL PROGRAM,WORK AREA MONITORING (BRIDGE),TEMPORARY HIGH-VISIBILITY FENCE,CLEAN EXPANSION JOINT,JOINT SEAL (MR 1"),CLEAN STRUCTURAL STEEL (EXISTING BRIDGE),PAINT STRUCTURAL STEEL (EXISTING BRIDGE),SPOT BLAST CLEAN AND PAINT UNDERCOAT,REPAIR SPALLED SURFACE AREA,MOBILIZATION.
Requirements: PRIME CONTRACTOR IS WILLING, TO BREAKOUT ANY PORTION OF WORK TO ENCOURAGE DVBE PARTICIPATION. PLANS AND SPECS ARE AVAILABLE UPON REQUEST. THEY MAY ALSO BE VIEWED AND DOWNLOADED FROM CALTRANS WEBSITE http://www.dot.ca.gov ****100% payment and performance bonds will be required for a single, treasury-listed surety subject to our approval. We will pay bond premiums up to 1.5% higher amounts maybe negotiable. Subcontractors awarded on any project will be on standard form for subcontract. Please call for assistance in bonding, insurance, lines of credit, technical info, equipment and supplies or if any other assistance is needed. Certified Coatings Company is an Equal Opportunity Employer.
Date posted: 02/14/2018
Contractor: Chrisp Company Contact: Aaron Patton
Address: 43650 Osgood Road Fremont, Ca. 94539
Phone: 510-656-2840 Fax: 510-656-2397 Email: apatton@chrispco.com
Services needed: Chrisp Company is requesting quotes from all qualified subcontractors and suppliers including certified DVBE Firms for the following items of work, including but not limited to the following: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL, PORTABLE CMS, JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM and MATERIAL SUPPLIES. Subcontractors are required to meet insurance and labor requirements. Subcontractors may be required to provide 100% Payment and Performance Bonds. Please contact us for assistance. FIRMS must include copy of business license with quote. Quotes are required to be in accordance with the plans and specifications and good for the contract duration as specified in the bid documents. We intend to help and work with all qualified firms seeking participation on this project. Feel free to call our office with any questions you may have. DO NOT EMAIL QUOTES. PLEASE FAX TO 510.656.2397. QUOTES MUST BE FAXED AT LEAST 2 HOURS BEFORE BID DUE TIME.
Requirements: To view or obtain plans, specs, and project document, FIRMS should contact the CONTRACTOR to get required project resource. - The CONTRACTOR will provide FIRMS, if requested, with required assistance in bonding, insurance. -Quotes per project bid items must be submitted before the due bid date and time to allow proper evaluation. -Quotes are required to be in accordance with project plans, specs, and good for the entire contract duration. - The project is a prevailing wage public job. The FIRM's quote must consider all terms related to prevailing wages terms. - FIRMS must possess and maintain a current contractor license, insurance, and worker compensation coverage during the project -100% payment bond and performance bond for the full amount of the subcontract price may be required. -FIRMS that submit their quote explicitly acknowledge and agree to all above terms and responsibilities. - We are an equal opportunity employer. We do not discriminate against any qualified contractors, subcontractors, suppliers -The firm must be registered with Department of Industrial Relation and should have a current DIR number.
Date posted: 02/14/2018
Contractor: Granite Construction Company Contact: Steven Black
Address: 213 E. Columbia Ave Lancaster CA
Phone: 661-392-5822 Fax: 661-726-4460 Email: steven.black@gcinc.com
Services needed: Granite Construction Company (Granite) is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for all bid items, including but not limited to: Construction Area Signs; Traffic Control System; Reset, Adjust Roadway Items; Plane Asphalt Concrete; Remove Concrete; Temporary Erosion Control; Aggregate Base; Cement Treated Base; Concrete Base; Asphalt Concrete; Paving Asphalt; Place Asphalt Concrete Dike & Misc.; Reinforcing Steel; Roadside Sign; Concrete Curb & Sidewalk; Saw Cutting; Object Marker; Metal Beam Guard railing; Thermoplastic Traffic Striping & Marking; Painted Traffic Striping & Marking; Pavement Marker; Maintaining Existing Traffic Management During Construction; Signal & Lighting; Detector; Materials Testing Services; Construction Engineering & Inspection Services; Land Surveyor; Lead Compliance; SWPPP Planning; Construction Equipment Rental; Heavy Equipment Rental; Construction Staking (Surveying); Safety Equipment Supplier; Petroleum, Oil & Lubricants Supplier; Sand & Gravel Supplier; Asphalt Supplier; Concrete & Cement Supplier; Reinforcing Bar Section Supplier; Guard Railing & Barriers Supplier; Pavement Markers Supplier; Traffic Stripes, Marking & Traffic Control Materials Supplier; Petroleum & Petroleum Products; Bottom Dump Truck; Transfer Dump Truck; Super 10 Dump Truck; Flat Bed Trucking; Water Truck; End Dump Truck; Asphalt Oil Tankers; Street Sweeping Truck; Truck Rental; Trucker Broker; Trucker All bid items are open for bid, including items of work normally performed by Granite. Quotations will be broken down into comparable packages as reasonably necessary. Granite will work with interested subcontractors to identify opportunities to break down items into economically feasible packages.
Requirements: Granite is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons, and Carpenters Unions. 100% performance and payment bonds required for the full amount of the subcontract price. Granite may assist with the bond premium up to 1.5%. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation insurance coverage meeting Granite?s requirements and will be required to sign the standard Granite Subcontract Agreement. A copy of the insurance requirements and agreements can be obtained by contacting the Estimator. For any bid proposal submitted on or after March 1, 2015 and any contract for public work entered into on or after April 1, 2015, the following registration requirements apply: Every Subcontractor is required to be registered to perform public work pursuant to Section 1725.5 of the Public Contract Code (?Section 1725.5?). No Contractor or Subcontractor shall be qualified to bid on, be listed in a bid proposal pursuant to Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, unless currently registered to perform public work pursuant to Section 1725.5. No bid shall be accepted nor any subcontract entered into without proof of the Subcontractor?s current registration to perform public work pursuant to Section 1725.5. Please call if you need assistance in obtaining bonding, insurance, equipment, materials, and/or supplies. Granite intends to work cooperatively with all qualified firms seeking work on this project. Granite is an Equal Opportunity Employer.
Date posted: 02/14/2018
Contractor: Sierra Nevada Construction, Inc. Contact: DJ Cruz
Address: 2055 E Greg Street Sparks, NV 89431
Phone: 775-355-0420 Fax: 775-355-0535 Email: bids@snc.biz
Services needed: We are soliciting quotes for: Slurry Seal Product Supply; Erosion Control Materials; Asphalt; Asphalt Oil Supply; Asphaltic Emulsion; Crack Sealant; Pavement Markers; Construction Area Signs; Traffic Control System; Portable Changeable Message Signs; Replace AC Surfacing; Crack Treatment; Asphalt Paving; Remove Pavement Markings; Thermoplastic Traffic Stripe and Marking; Pavement Markers; Pavement Markings; and Roadside Signs.
Requirements: SNC is a union signatory contractor and is an equal opportunity employer. We will require that all participating companies carry Workers' Compensation & Liability insurance and be bonded. We will assist with obtaining insurance, bonds or lines of credit, equipment, supplies or materials necessary to participate in this project. Plans & specifications are available for viewing at our offices or maybe available on-line.
Date posted: 02/14/2018
Contractor: Golden State Bridge, Inc. Contact: David Riccitiello
Address: 3701 Mallard Drive Benicia, CA 94510
Phone: 925-372-8000 Fax: 925-372-8001 Email: dave@gsbridge.com
Services needed: Lead Compliance Plan, Construction Area Signs, Traffic Control, Prepare Water Pollution Control Program, Methyl Methacrylate Traffic Stripe.
Requirements: Please call to discuss how Golden State Bridge, Inc. can assist you in your bonding, credit, and/or insurance needs. Also, let us know if you need assistance in obtaining necessary equipment, supplies, or materials for this project. If you are interested in submitting a subcontractor bid for this project, please fax us your quote at 925-372-8001. Should you have any questions regarding this bid, you may contact David Riccitiello at 925-372-8000 or dave@gsbridge.com. Please be advised, Contractors and subcontractors must register with The D.I.R. (Department of Industrial Relations) in order to bid on public works projects. Registration with The D.I.R. costs $300 and covers the fiscal year (July 1?June 30th). To verify the status of your DIR number, please visit http://www.dir.ca.gov/Public-Works/Contractors.html.
Date posted: 02/14/2018
Contractor: Calportland Construction Contact: Mark Kalouner
Address: 1625 East Donovan Road Santa Maria, CA 93454
Phone: 805-345-3581 Fax: 805-345-3538 Email: mkalouner@calportland.com
Services needed: Calportland Construction Company is an Equal Opportunity Employer and we are requesting bids from all qualified subcontractors and suppliers including certified DBE firms performing commercially useful function for referenced project for the following items of work, including LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TEMPORARY PEDESTRIAN ACCESS ROUTE, PORTABLE CHANGEABLE MESSAGE SIGN,JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM, TEMPORARY CONCRETE WASHOUT, TREATED WOOD WASTE, SHOULDER BACKING, PREPAVING INERTIAL PROFILER, HOT MIX ASPHALT (TYPE A) RUBBERIZED HOT MIX ASPHALT (GAP GRADED), DATA CORE, PLACE HOT MIX ASPHALT DIKE, TACK COAT, REMOVE ASPHALT CONCRETE DIKE, COLD PLANE ASPHALT CONCRETE PAVEMENT, REMOVE BRIDGE MOUNTED SIGN, DETECTABLE WARNING SURFACE, MINOR CONCRETE,REMOVE CONCRETE CURB AND SIDEWALK, SURVEY MONUMENT,PAVEMENT MARKERS, REMOVE ROADSIDE SIGN, FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED), FOR RETROREFLECTIVE SHEETING (TYPE XI), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-FRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-FRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI), RETROREFLECTIVE SHEETING (TYPE XI,) ROADSIDE SIGN - ONE POST, ROADSIDE SIGN - TWO POST, INSTALL FRAMED SIGN PANEL, 6" TRAFFIC STRIPE (WARRANTY), 6" TRAFFIC STRIPE (WARRANTY), (BROKEN 8-4) PAVEMENT MARKING (WARRANTY,) TRAFFIC MONITORING STATION SYSTEM, MOBILIZATION but not limited to Including items of work normally performed by Calportland. Quotations may be broken down into comparable packages as reasonably necessary. Calportland will contact DBE's submitting quotations prior to breaking down or splitting any items
Requirements: Calportland Construction is a non union company. 100% performance and payment bonds may be required for the full amount of subcontract price. Bonding assistance is available if requested. Subcontractors must possess a current contractor?s license, DIR Registration Number, insurance and workers compensation coverage meeting all requirements of the Contract Documents and Calportland?s Subcontractor Agreement. Plans and specifications are available on line at Caltrans website or at our office located at 1625 East Donovan Road in Santa Maria, CA 93454. If you should have any questions regarding the plans or specifications, or require assistance in obtaining insurance, equipment or materials please contact our office at Phone (805) 345-3581 or Fax (805) 345-3538.
Date posted: 02/15/2018
Contractor: Golden State Bridge, Inc. Contact: David Riccitiello
Address: 3701 Mallard Drive Benicia, CA 94510
Phone: 925-372-8000 Fax: 925-372-8001 Email: dave@gsbridge.com
Services needed: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL, TEMP. PAVEMENT MARKING, PORTABLE DELINEATOR, TRAFFIC PLASTIC DRUM, FLASHING BEACON, PORTABLE TEMP. SIGNAL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN, TEMP. RAILING (TYPE K), TEMP. CRASH CUSHION MODULE, PREPARE WATER POLLUTION CONTROL PROGRAM, TEMP. CONCRETE WAHSOUT, STRUCTURE EXCAVATION, STRUCTURE BACKFILL, HOT MIX ASPHALT (TYPE A), TACK COAT, COLD PLANE ASPHALT CONCRETE PAVEMENT, GRIND EXISTING BRIDGE DECK, TEMP. SUPPORT, AGGREGATE BASE, STRUCTURAL CONCRETE; APPROACH SLAB (TYPE R), STRUCTURAL CONCRETE; BRIDGE (REPAIR), PAVING NOTHC EXTENSION, CLEAN EXPANSION JOINT, JOINT SEAL, GALVANIC ANODE, WELDED WIRE REINFORCEMENT (EPOXY COATED), RAPID SETTING CONCRETE (PATCH), REPAIR SPALLED SURFACE AREA, REMOVE UNSOUND CONCRETE, PREPARE CONCRETE BRIDGE DECK SURFACE, FURNISH AND PLACE POLYESTER CONCRETE OVERLAY, TREAT BRIDGE DECK, FURNISH BRIDGE DECK TREATMENT MATERIAL, REMOVE CHIP SEAL, REMOVE PAVEMENT MARKER, PAVEMENT MARKER (RETROREFLECTIVE), THERMOPLASTIC PAVEMENT MARKING, REMOVE THERMOPLASTIC TRAFFIC STRIPE, 12" RUMBLE STRIP, 6" TRAFFIC STRIPE, MAINTAINING EXISTING TRAFFIC MANAGMENT SYSTEM ELEMENTS DURING CONSTRUCTION, CLOSED CIRCUIT TELEVISION SYSTEM, MODIFYING EXISTING ELECTRICAL SYSTEM.
Requirements: Please call to discuss how Golden State Bridge, Inc. can assist you in your bonding, credit, and/or insurance needs. Also, let us know if you need assistance in obtaining necessary equipment, supplies, or materials for this project. If you are interested in submitting a subcontractor bid for this project, please fax us your quote at 925-372-8001. Should you have any questions regarding this bid, you may contact David Riccitiello at 925-372-8000 or dave@gsbridge.com. Please be advised, Contractors and subcontractors must register with The D.I.R. (Department of Industrial Relations) in order to bid on public works projects. Registration with The D.I.R. costs $300 and covers the fiscal year (July 1?June 30th). To verify the status of your DIR number, please visit http://www.dir.ca.gov/Public-Works/Contractors.html.
Date posted: 02/15/2018
Contractor: Emmett's Excavation, Inc. Contact: John Emmett
Address: 6207 E. Clinton Avenue Fresno, CA 93727
Phone: 559-347-9188 Fax: 559-348-9272 Email: emmetts@eei78.com
Services needed: Emmett?s Excavation, Inc. is requesting quotes from all qualified subcontractors and suppliers including certified UDBE, MBE, WBE, SBE, DBE, and or any other certified minority or underutilized firms for the following project & items of work, including but not limited to the items listed below: Lead Compliance Plan, Prepare Water Pollution Control Program, CAS, Traffic Control System, Type II Barricade, PCMS, Temp Drainage Inlet Protection, Temp Silt Fence, Temp Fence (Type ESA), Demo, Clearing and Grubbing, Roadway Excavation, Structure Excavation and Backfill, Lean Concrete Backfill, Roadside Clearing, Boulder, Imported Topsoil, Hydroseed Fiber Rolls, Erosion Control (Dry Seed), Class 2 Aggregate Base, Hydromulch, Wood Mulch, Minor Hot Mix Asphalt, Temporary Railing (type K), Structural Concrete, Minor Concrete, Rebar, Furnish Single Sheet Aluminum Sign, Roadside Sign, 8? Corrugated High Density Polyethylene Pipe, 10? Corrugated Steel Pipe Down Drain, 18? Reinforced Concrete Pipe, Class 3 Permeable Material (Blanket), Rock Slope Protection (RSP), RSP Fabric, Minor Concrete (Misc.) and (Exposed Aggregate Concrete), Pre/Post Construction Surveys,, Misc. Iron and Steel, Cable Railing, Chain Link Fence, 6? Chain Link Gate, Paint Traffic Stripe and Marking (2-Coat), Building Work and any and all bid items involved
Requirements: Emmett?s Excavation, Inc. is signatory to Operating Engineers, Laborers, Cement Masons, and Carpenters Unions. 100% performance and payment bonds may be required for the full amount of the subcontract price. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation insurance coverage meeting Emmett?s Excavation, Inc?s requirements and will be required to sign the standard Emmett?s Excavation, Inc. Subcontract Agreement. A copy of the insurance requirements and agreements can be obtained by contacting Emmett?s Excavation, Inc. at (559) 347-9188. Plans and specifications are available for viewing through the following: on the Caltrans website at http://www.dot.ca.gov/hq/esc/oe/weekly_ads/all_advertised.php, or our office located at 6207 E. Clinton Avenue, Fresno, CA 93727. Please call if you need assistance in obtaining bonding, insurance, equipment, materials, and/or supplies, or any other information or assistance to help you to be able to bid on this project. Emmett?s Excavation, Inc. will break out smaller portions of work to make it more feasible for smaller subcontractors and suppliers, as needed. Emmett?s Excavation, Inc. intends to work cooperatively with all qualified firms seeking work on this project. Emmett?s Excavation, Inc. is an equal opportunity employer.
Date posted: 02/15/2018
Contractor: Avison Construction, Inc. Contact: Curtis Short
Address: 40434 Brickyard Drive Madera, CA. 93636
Phone: 559-431-0317 Fax: 559-431-0321 Email: cshort@avisoninc.com
Services needed: Avison Construction is seeking quotes from all qualified subcontractors and suppliers including certified DBE firms to include the following items of work: lead compliance plan, CAS, traffic control, temporary railing, temporary striping and markings, SWPPP, clearing and grubbing, excavation, imported borrow, rock blanket, wood mulch, topsoil, hydromulch, hydroseeding, aggregates, concrete, reinforcing bar, storm drain systems, fencing, striping and markings, signage, electrical, trucking, and other associated items.
Requirements: Subcontractors may be required to obtain performance and payment bonds with premiums paid up to 1.5%. Avison Construction is signatory to the Operating Engineer, Laborers, and Cement Masons. Avison Construction can assist in obtaining services such as bonds, insurance, lines of credit, materials, supplies, equipment, or other needs for this project. Avison Construction is an Equal Opportunity Employer.
Date posted: 02/15/2018
Contractor: SULLY-MILLER Contact: CHARLIE PESSA
Address: 135 S STATE COLLEGE BLVD STE 400 BREA CA 92821
Phone: 7145789600 Fax: 7145789672 Email: ESTIMATING@SULLY-MILLER.COM
Services needed: Services needed: Sully-Miller is requesting quotes from all qualified subcontractors and suppliers including certified DVBE firms for the following items of work, including but not limited to: AC DIKE, ASPHALT RUBBER CHIP SEAL, COLD PLANE, CONSTRUCTION AREA SIGNS, ELECTRICAL, LEAD COMPLIANCE PLAN, RUMBLE STRIP, SAMI, SLURRY SEAL, STRIPING & MARKING, WPCP, MATERIALS, RENTAL EQUIPMENT, & TRUCKING.
Requirements: Requirements: Sully-Miller Contracting Company is signatory to Operating Engineers, Laborers, Cement Masons and Carpenters unions. 100% performance and payment bonds may be required for the full amount of subcontract price. We intend to seriously negotiate with all qualified DVBE subcontractors and suppliers for project participation. Assistance is available for any Bonding, Line of Credit, Insurance, Equipment, Supplies, Materials and technical assistance or information related to the plans and specifications that are requirement for the work. Plans and specifications are available for review on the Sully-Miller website www.sully-millerplans.com. Sully-Miller Contracting Company is an equal opportunity employer.
Date posted: 02/15/2018
Contractor: SULLY-MILLER Contact: CHARLIE PESSA
Address: 135 S STATE COLLEGE BLVD STE 400 BREA CA 92821
Phone: 7145789600 Fax: 7145789672 Email: ESTIMATING@SULLY-MILLER.COM
Services needed: Services needed: Sully-Miller is requesting quotes from all qualified subcontractors and suppliers including certified DVBE firms for the following items of work, including but not limited to: COLD PLANE-AC, CONSTRUCTION AREA SIGNS, ELECTRICAL, GRIND PCC CONCRETE, LEAD COMPLIANCE PLAN, LEAN CONCRETE BASE RAPID SET, PORTABLE CHANGEABLE MESSAGE SIGNS, REMOVE/REPLACE CONCRETE SLAB, RUMBLE STRIP, SLURRY SEAL, STRIPING & MARKING, SURVEY MONUMENT, WPCP, MATERIALS, RENTAL EQUIPMENT, & TRUCKING.
Requirements: Requirements: Sully-Miller Contracting Company is signatory to Operating Engineers, Laborers, Cement Masons and Carpenters unions. 100% performance and payment bonds may be required for the full amount of subcontract price. We intend to seriously negotiate with all qualified DVBE subcontractors and suppliers for project participation. Assistance is available for any Bonding, Line of Credit, Insurance, Equipment, Supplies, Materials and technical assistance or information related to the plans and specifications that are requirement for the work. Plans and specifications are available for review on the Sully-Miller website www.sully-millerplans.com. Sully-Miller Contracting Company is an equal opportunity employer.
Date posted: 02/15/2018
Contractor: Team Ghilotti, Inc. Contact: Abel Canlas
Address: 2531 Petaluma Blvd. South Petaluma, CA
Phone: 707-763-8700 Fax: 707-763-8711 Email: abelc@teamghilotti.com
Services needed: We Are Seeking Quotes from QUALIFIED DBE?S SUBCONTRACTORS, SERVICE PROVIDERS, SUPPLIERS & TRUCKING for the following Items: Lead Compliance Plan, Construction. Area Signs, Traffic Control System, PCMS, Jobsite Management, Water Pollution Control Plan. Treated Wood Waste, Shoulder Backing, Import Borrow, SEAL (Sand Cover), Asphalt Rubber Binder, Asphalt Emulsion (Fog Seal Coat), Pre-Coated Screenings, Micro-Surfacing, Hot Mix Asphalt (Type A), Asphalt Concrete Dike (Type A, C, E. F), Tack Coat, Cold Plane, Adjust Utilities To Grade, Pavement Marker, Delineators, Markers, Signs, Midwest Guardrail, End &Term Assy. Removal, Thermoplastic Striping, Markings, & Removal, Modify Existing Electrical System, Street Sweeping, Tack Oil, Trucking and All Other related Trades and Items of Work Including Partial Items that are required by the project plans & specifications.
Requirements: Team Ghilotti, Inc. is an Equal Opportunity Employer. Performance and payment bonds may be required. Please call for assistance with bonding and insurance or obtaining necessary equipment, supplies or material for this project. TEAM GHILOTTI, INC. 2531 Petaluma Blvd. S., Petaluma, CA 94952 Phone (707) 763-8700 Fax1: (707) 763-8711 Fax2: (707) 762-1430
Date posted: 02/15/2018
Contractor: Statewide Traffic Safety and Signs Inc. Contact: Kevin Hansen
Address: 522 Lindon Lane Nipomo, CA 93444
Phone: 805-929-5070 Fax: 805-929-5786 Email: services@stssi.com
Services needed: Statewide Traffic Safety and Signs is requesting quotes from all qualified DVBE and Non-DVBE subcontractors and suppliers meeting the bid requirements for this project. Specific bid items we are soliciting quotes for include but not limited to: ITEM 1 LEAD COMPLIANCE PLAN; ITEM 4 JOB SITE MANAGEMENT; ITEM 5 PREPARE WATER POLLUTION CONTROL PROGRAM; ITEM 15 MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION; ITEM 16 MODIFYING EXISTING ELECTRICAL SYSTEM. Plans, Specifications, Supplemental Information and Addenda can be view at http://www.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=07-3W9604 Please contact us with any further questions specific to this project.
Requirements:
Date posted: 02/15/2018
Contractor: Precision Grade Inc Contact: Carlos Garcia
Address: P.O. Box 90 San Juan Bautista
Phone: 831-800-1602 Fax: 831-623-1002 Email: cgarcia@precisiongrade.com
Services needed: DVBE & Small businesses are encouraged to provide a quote for all work items listed in bid item list. This project has a mandatory 5% DVBE requirement.
Requirements: Precision Grade Inc. is an equal opportunity employer. Plans and specifications are available to download on the Caltrans website. A physical set of plans is available at our office, please contact estimating department for more information. Subcontractors must meet all insurance requirements and coverage amounts requested by Caltrans. Subcontractor must have a current license number and DIR number.
Date posted: 02/15/2018
Contractor: American Civil Constructors West Coast LLC Contact: Estimating
Address: 2990 Bay Vista Court Benicia CA 94510
Phone: 707-746-8028 Fax: 707-747-0593 Email: estimatingwc@accbuilt.com
Services needed: ACC West Coast would like to encourage all DBE companies whom are classified to perform any of the scopes of work relevant to this project to submit quotes. We are currently requesting quotes for all scopes of work and bid items related to this project. Please see the list of bid items associated with this project for more information. Other items of work in which quotes are greatly desired: Construction Rentals, Misc. Construction Supplies, Flat-Bed and End Dump Hourly Trucking Rates. We will also consider subcontracting other scopes of work offered by interested companies.
Requirements: ACC will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Please call to discuss how ACC West Coast can assist you in your bonding, credit and/or insurance needs. Assistance may include, but is not limited to: Contacting bonding and/or insurance companies on your behalf, arranging with sureties incremental or phased bonding, obtaining necessary equipment, supplies and/or materials. Subcontractors may be required to provide a bond and must have a valid contractor?s license and current insurance coverage that meets ACC and project requirements. Selected subcontractors will be required to sign our standard subcontractor agreement. Please fax quotes no later than 10:00am on bid day. If you have any questions, please contact the project estimator. Plans and Specifications may be viewed at our Benicia office. Quotes must include inclusions and exclusions, and must be valid for a minimum of 60 days following the bid date. ACC is an equal opportunity employer.
Date posted: 02/16/2018
Contractor: American Civil Constructors West Coast LLC Contact: Estimating
Address: 2990 Bay Vista Court Benicia CA 94510
Phone: 707-746-8028 Fax: 707-747-0593 Email: estimatingwc@accbuilt.com
Services needed: ACC West Coast would like to encourage all DBE companies whom are classified to perform any of the scopes of work relevant to this project to submit quotes. We are currently requesting quotes for all scopes of work and bid items related to this project. Please see the list of bid items associated with this project for more information. Other items of work in which quotes are greatly desired: Construction Rentals, Misc. Construction Supplies, Flat-Bed and End Dump Hourly Trucking Rates. We will also consider subcontracting other scopes of work offered by interested companies.
Requirements: ACC will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Please call to discuss how ACC West Coast can assist you in your bonding, credit and/or insurance needs. Assistance may include, but is not limited to: Contacting bonding and/or insurance companies on your behalf, arranging with sureties incremental or phased bonding, obtaining necessary equipment, supplies and/or materials. Subcontractors may be required to provide a bond and must have a valid contractor?s license and current insurance coverage that meets ACC and project requirements. Selected subcontractors will be required to sign our standard subcontractor agreement. Please fax quotes no later than 10:00am on bid day. If you have any questions, please contact the project estimator. Plans and Specifications may be viewed at our Benicia office. Quotes must include inclusions and exclusions, and must be valid for a minimum of 60 days following the bid date. ACC is an equal opportunity employer.
Date posted: 02/16/2018
Contractor: American Civil Constructors West Coast LLC Contact: Estimating
Address: 2990 Bay Vista Court Benicia CA 94510
Phone: 707-746-8028 Fax: 707-747-0593 Email: estimatingwc@accbuilt.com
Services needed: ACC West Coast would like to encourage all DVBE and Small Business companies whom are classified to perform any of the scopes of work relevant to this project to submit quotes. We are currently requesting quotes for all scopes of work and bid items related to this project. Please see the list of bid items associated with this project for more information. Other items of work in which quotes are greatly desired: Construction Rentals, Misc. Construction Supplies, Flat-Bed and End Dump Hourly Trucking Rates. We will also consider subcontracting other scopes of work offered by interested companies.
Requirements: ACC will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Please call to discuss how ACC West Coast can assist you in your bonding, credit and/or insurance needs. Assistance may include, but is not limited to: Contacting bonding and/or insurance companies on your behalf, arranging with sureties incremental or phased bonding, obtaining necessary equipment, supplies and/or materials. Subcontractors may be required to provide a bond and must have a valid contractor?s license and current insurance coverage that meets ACC and project requirements. Selected subcontractors will be required to sign our standard subcontractor agreement. Please fax quotes no later than 10:00am on bid day. If you have any questions, please contact the project estimator. Plans and Specifications may be viewed at our Benicia office. Quotes must include inclusions and exclusions, and must be valid for a minimum of 60 days following the bid date. ACC is an equal opportunity employer.
Date posted: 02/16/2018
Contractor: Myers and Sons Construction, LP Contact: Carla Hernandez
Address: 4600 Northgate Blvd., Suite 100 Sacramento, CA 95834
Phone: 916-283-9950 Fax: 916-614-9520 Email: chernandez@myers-sons.com
Services needed: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TEMPORARY TRAFFIC STRIPE (TAPE), TEMPORARY PAVEMENT MARKER, PORTABLE CHANGEABLE MESSAGE SIGN (LS), PREPARE WATER POLLUTION CONTROL PROGRAM, TEMPORARY DRAINAGE INLET PROTECTION, STREET SWEEPING, NOISE MONITORING, CLEAN EXPANSION JOINT, JOINT SEAL (MR 1 1/2"), PUBLIC SAFETY PLAN, RAPID SETTING CONCRETE (PATCH), REMOVE CONCRETE DECK SURFACE, REMOVE UNSOUND CONCRETE, PREPARE CONCRETE BRIDGE DECK SURFACE, FURNISH POLYESTER CONCRETE OVERLAY, PLACE POLYESTER CONCRETE OVERLAY, PAVEMENT MARKER (RETROREFLECTIVE), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) & ALL OTHER RELATED ITEMS
Requirements: : 100% performance and payment bonds may be required for the full amount of the subcontract price. Subcontractors must possess a valid contractor's license, DIR registration number, current insurance meeting Myers and Sons Construction's requirements. Subcontractors will be required to sign the standard Myers and Sons Construction, LP Subcontract Agreement. Quotations must be valid for one hundred and twenty (120) days after the specified Contract Award Date by the Owner. Plans and Specifications are available for viewing at our Sacramento office, please contact (916) 283-9950 or estimating@myers-sons.com. Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies or visit our website at www.myers-sons.com for more information. Myers and Sons Construction, LP will work cooperatively with all qualified firms seeking work on this project. Myers and Sons Construction is signatory to the Laborers, Carpenters, Cement Masons and Operating Engineers. Myers and Sons Construction, LP is an equal opportunity employer.
Date posted: 02/16/2018
Contractor: GRANITE ROCK COMPANY Contact: Randy Bonino
Address: 5225 Hellyer Avenue, Suite 220 San Jose, CA 95138
Phone: 408-574-1400 Fax: 408-365-9548 Email: estimating@graniterock.com
Services needed: Certified DBE firms are encouraged to provide a quote to Graniterock for all items of work listed on the bid list, particularly these: Lead Compliance Plan, Construction Area Signs, Traffic Control, Channelizer, PCMS, K-Rail, Temporary Crash Cushion Module, Prepare Storm Water Pollution Prevention Plan, Treated Wood Waste, Clearing and Grubbing, Hazardous Waste Removal, Erosion Control, Treated Lumber and Timber, Adjust Utilities, Minor Concrete, Fencing, Object Marker, MBGR, Alternative Crash Cushion, Striping & Markers, Modify Existing Electrical System, & Trucking.
Requirements: Granite Rock Company 'Graniterock' is signatory to Operating Engineers, Laborers, Teamsters, Carpenters and Cement Masons unions. 100% performance and payment bonds will be required from a qualified surety company for the full amount of the subcontract price. Bonding assistance is available. Graniterock will pay bond premium up to 1.5%. In addition to bonding assistance, subcontractors are encouraged to contact Graniterock Estimating with questions regarding obtaining lines of credit, insurance, equipment, materials and/or supplies, or with any questions you may have. Plans and specifications can be downloaded on-line with Caltrans, or at our offices, but please contact our estimating office for assistance. Subcontractors must possess a current contractor's license, DIR number, insurance and worker's compensation coverage. Subcontractors will be required to enter into our standard contract. DBE Subcontractors must be listed by the CUCP for the work category code(s) that apply to the scope of work they are quoting. Items of work can be broken down to facilitate DBE participation. Graniterock intends to work cooperatively with all qualified firms seeking work on this project. Granite Rock Company is an equal opportunity employer
Date posted: 02/16/2018
Contractor: Centerline Striping Co., Inc. Contact: Cory Gage
Address: 9847 Dino Drive Elk Grove, CA 95624
Phone: 916-686-8860 Fax: 916-686-8875 Email: cory@centerlinestriping.com
Services needed: Centerline Striping Co., Inc. is requesting certified and qualified DVBE subcontractors and/or supplier for services to all items of work including: lead compliance plan, construction area signs, traffic control, portable CMS, job site management, water pollution control program, maintaining existing traffic management system,sweeping,and material suppliers for this project. Centerline Striping Co., Inc. is an Equal Opportunity Employer. Assistance is available in obtaining bonds, lines of credit, insurance or other technical information. Plans and Specifications are available from owner. Please contact our office at (916) 686-8860 for more information. Sub-contractors must be registered with the Department of Industrial relations and have a DIR number prior to the bid.
Requirements: Please notify of intent to bid project 2 days in advance and send bid at least 4 hours in advance of bid time to allow for comparison with others.
Date posted: 02/16/2018
Contractor: A. Teichert & Son, Inc. dba Teichert Construction Contact: Tim Corvello
Address: 400 Sunrise Avenue, Suite 300 Roseville
Phone: 2099832300 Fax: 2099832375 Email: TCorvello@teichert.com
Services needed: Request for qualified bids from Subcontractors, Suppliers & Truckers for the following project: Project: Construction on State Highway in Monterey County near Monterey at Various Locations form Carmel Valley Road to 0.3 mile North of Fremont Boulevard and on Route 66 at 0.1 mile East of Route 1 Bid Date: 3/8/18 @ 2:00 PM Docs & Plans Available from Caltrans Estimate: $2,600,000 Duration: 100 Working Days Agency Goals: 15% DBE Project Description: Teichert Construction is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: all materials, labor and equipment for Construction Area Signs, Traffic Control System, Clearing & Grubbing, Concrete Supplier, Concrete Subcontractor, QC/QA, Hydroseeding, Temporary Erosion Control, Fencing, Metal Beam Guard Railing, Thermoplastic Traffic Striping & Marking, Painted Traffic Striping & Marking, Pavement Marker, Signal & Lighting, Message Signs, Lighting & Sign Illumination, LEAD Compliance, SWPPP Planning, Bottom; Transfer; Super Dump Trucks, Water Truck, Street Sweeping Truck and Hazardous Waste Trucking. Teichert Construction intends to work cooperatively with all qualified firms seeking work on this project, including but not limited to breaking out contract work items into economically feasible units to increase overall DBE participation. Plans and specifications are available from the municipality listed above and the Teichert?s Roseville Estimating office. For assistance obtaining or regarding the plans and specifications, please contact the listed Estimator. 100% Payment and Performance Bonds for subcontractors are required. Teichert will pay bond premium up to 2%. Insurance Waiver of subrogation also required. However, certified DBE's are encouraged to contact Teichert and request assistance if they are unable to meet Teichert's standard bonding or insurance requirements. DBE's also are encouraged to contact Teichert for assistance in obtaining lines of credit, equipment, supplies, materials or related assistance or services. Subcontractor, Supplier and Trucker quotes must be valid, at minimum, for the award period stated in the contract documents. Please note that this is a prevailing wage project and Teichert Construction is Union signatory. Subcontractors will be subject to the terms and conditions of Teichert's subcontract and safety documents available at www.teichert.com/for-subcontractors.cfm. Submission of a bid to Teichert will confirm that you have reviewed and accepted Teichert's subcontract form. Conditions or exceptions in Subcontractor?s quote are expressly rejected unless accepted in writing prior to bid. Subcontractor scopes and supplier quotes are required 24 hours prior to bid. Additional information and or assistance to DBE's available from: *** All Quotes must have the Department of Industrial Relations # to be ACCEPTED ***
Requirements:
Date posted: 02/16/2018
Contractor: Pacific Infrastructure Construction, LLC Contact: Jay Zoellner
Address: 871 Cotting Court Suite A Vacaville CA 95688
Phone: 707-449-3604 Fax: 707-449-3641 Email: jzoellner@pacificic.net
Services needed: 1 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 2 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 3 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 4 128652 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS LUMP SUM 5 130100 JOB SITE MANAGEMENT LS LUMP SUM 6 130200 PREPARE WATER POLLUTION CONTROL PROGRAM LS LUMP SUM 7 034508 PAVEMENT MARKER (NON-REFLECTIVE) EA 2,360 8 810230 PAVEMENT MARKER (RETROREFLECTIVE) EA 34,200 9 840516 THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY) SQFT 1,820 10 840621 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7) LF 44,800 11 840623 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) LF 634,000 12 846007 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) LF 1,040,000 13 846009 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) LF 115,000 14 846010 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3) LF 24,400 15 034509 REMOVE THERMOPLASTIC TRAFFIC STRIPE (WATER BLASTING) LF 178,000 16 999990 MOBILIZATION LS LUMP SUM
Requirements:
Date posted: 02/16/2018
Contractor: Dawson-Mauldin Construction, Inc. Contact: Wendy Roselius
Address: 10625 Ellis Ave. #D Fountain Valley, CA 92708
Phone: 7143781533 Fax: 7143781534 Email: wendyroselius@dawson-mauldin.com
Services needed: All Items, including but not limited to: Lead Compliance, Signs, Traffic Control, Hydroseeding, Barricades, SWPPP, Striping, Erosion Control, Fence, Landscape, Tack Coat, Rebar, Detectable Warning Surface, Paint, Electrical, CCTV and Suppliers of Aggregate Base, Concrete, HMA, HMA Dike, RCP and Corrugated Steel Pipe.
Requirements: Dawson-Mauldin Construction, Inc. is an Equal Opportunity Employer. 100% Performance & Payment Bonds required for bids over $300,000. Dawson-Mauldin Construction, Inc. will pay bond premium up to 1.5%. Additional assistance is available upon request. All items open for bid. Call 714-378-1533 for information on Plans and Specifications.
Date posted: 02/16/2018
Contractor: Granite Construction Contact: Justin Ingram
Address: 1324 S. State Street, Ukiah, CA 95482
Phone: 707-467-4100 Fax: 707-467-4143 Email: justin.ingram@gcinc.com
Services needed: Granite Construction Company (Granite) is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: C1200 CONSTRUCTION AREA SIGNS; C1201 TRAFFIC CONTROL SYSTEM; C1211 TRAFFIC FLAGGERS; C1522 RESET; C1531 PLANE ASPHALT CONCRETE; C3701 SEAL COAT; C3940 PLACE ASPHALT CONCRETE DIKE AND MISC; C5620 ROADSIDE SIGN; C8201 OBJECT MARKER; C8320 METAL BEAM GUARD RAILING; C8405 THERMOPLASTIC TRAFFIC STRIPING & MARKING; C8406 PAINTED TRAFFIC STRIPING AND MARKING; C8501 PAVEMENT MARKING; C8602 SIGNAL AND LIGHTING; C8603 SIGNAL; C8604 LIGHTING; C8605 MESSAGE SIGNS; C8851 LEAD COMPLIANCE; C8852 SWPPP PLANNING; C9602 BOTTOM DUMP TRUCKING; C9603 TRANSFER DUMP TRUCK; C9604 SUPER 10 DUMP TRUCK. Additional services needed: TREATED WOOD WASTE; SAND COVER (SEAL); ASPHALT-RUBBER BINDER; ASPHALTIC EMULSION (FOG SEAL COAT); PRECOATED SCREENINGS; MICRO-SURFACING; DATA CORE; VEGETATION CONTROL (MINOR CONCRETE); VEGETATION CONTROL (FIBER MAT); TRANSITION RAILING (TYPE WB-31); END ANCHOR ASSEMBLY (TYPE SFT); ALTERNATIVE IN-LINE TERMINAL SYSTEM; ALTERNATIVE FLARED TERMINAL SYSTEM. Quotations will be broken down into comparable packages as reasonably necessary. Granite will work with interested subcontractors to identify opportunities to break down items into economically feasible packages.
Requirements: For any bid proposal submitted on or after March 1, 2015 and any contract for public work entered into on or after April 1, 2015, the following registration requirements apply: Every Subcontractor is required to be registered to perform public work pursuant to Section 1725.5 of the Public Contract Code (?Section 1725.5?). No Contractor or Subcontractor shall be qualified to bid on, be listed in a bid proposal pursuant to Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, unless currently registered to perform public work pursuant to Section 1725.5. No bid shall be accepted nor any subcontract entered into without proof of the Subcontractor?s current registration to perform public work pursuant to Section 1725.5. Granite Construction Company (Granite) is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. 100% performance and payment bonds may be required for the full amount of subcontract price. Granite will pay for bond premium up to 1.5%. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Granite?s requirements and will be required to sign the standard Granite Subcontract Agreement. A copy of the insurance requirements and agreement can be obtained by contacting the estimator. Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies. Granite intends to work cooperatively with all qualified firms seeking work on this project. Plans and specifications are available at Caltrans http://www.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=01-262044. You?ll need a login and agree to a Non-Disclosure Agreement to access plans. Specifications are also available for viewing at our office located at 1324 S. State Street, Ukiah, CA. Portions of work can be made available upon request prior to bid date. Please call if any assistance is needed. Granite Construction Is An Equal Opportunity Employer
Date posted: 02/16/2018